| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹165.0 CrAdmitted-Finance | ₹165.0 Cr | Admitted-Finance |
| 2 | ₹170.3 CrAdmitted-Finance | ₹170.3 Cr | Admitted-Finance |
| 3 | ₹177.1 CrAdmitted-Finance | ₹177.1 Cr | Admitted-Finance |
| 4 | ₹177.4 CrAdmitted-Finance 20 IT PARK | ₹177.4 Cr | Admitted-Finance |
| 5 | ₹189.6 CrAdmitted-Finance | ₹189.6 Cr | Admitted-Finance |
| Sl No | Description | Qty | Unit | GHARPURE ENGINEERING AND CONSTRUCTIONS PVT LTD | HNB ENGINEERS PVT LTD | Khilari infrastructure Private Limited | SMS LIMITED | M/S C.K. ENTERPRISES | ENVIRO INFRA ENGINEERS LIMITED | Traders & Engineers Private Limited | P DAS INFRASTRUCTURE PVT LTD |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of 43 MLD STP at Salori and its appurtenant work | |||||||||||
| 1.01 | Survey, Investigation, Design, drawing and construction of 43 MLD STP (including interconnection between this 43 MLD STP recieving chamber and existing 29 MLD STP recieving chamber) along with 20 KLD Fecal Sludge co-treatment Facility and appurtenant structures and allied work at existing Salori STP campus, Prayagraj city with appropriate and cost effective technology on sustainable & proven technology to deliver that treated effluent shall comply with the NGT directed discharge standards (April 2019). The work includes all civil structure and supply & erection of electro- mechanical equipments, instrumentation control works i.e transformer, DG set of suitable capacity with necessary accessaries, HT/LT panel with cable joiting material, earthing, suitable capacity non-clog submersible pumps (MOC- casing -2% NiCr, Impeller-ASTM CF8M, Shaft & Shaft sleeve- ASTM SS 410) capable of pumping 100mm particle with necessary accessaries such as motor, gate, valve, manual / mechanical screen,grit mechanism, blower , Electro-magnetic flowmeter cum totalizer having characteristics/ MOC Liner : polyurethane or Hand Rubber / Electric MOC : SS316L/ Housing : Die Cast Aluminium or CS/ Power Supply : 90-230 V AC / Output: 4 - 20 mA with HART/ Sensor Cable : 10 mt / Flow Tube or Sensor housing protection IP68/ Process Flange : SS316/Display:31/2 LCD Display/ Cable Connection: 1/2" NPT /Accuracy: 0.5% etc. for the proposed STP including power connection from the meter room of UPPCL, all required buildings including office cum laboratary building , campus roads, water supply system , sewerage & drainage system, guard room, rain water harvesting works, external & internal electrification including lighting arrangement , boundary wall, site development, plantation, PLC and SCADA with display screen in appropiate size, stand by power arrangement etc complete. | 1 | job | 54,86,31,064 ₹64.7 Cr | 60,00,00,000 ₹70.8 Cr | 57,93,00,000 ₹68.4 Cr | 64,80,51,969 ₹76.5 Cr | 68,00,00,000 ₹80.2 Cr | 76,50,00,000 ₹90.3 Cr | 1,06,20,00,000 ₹125.3 Cr | 70,00,00,000 ₹82.6 Cr |
| 2.00Operation & Maintenance of all civil and E&M works of 43 MLD STP along with 20 kld co-treatment facility at Salori, effluent gravity line, associate infrastructure and allied work for 15 years (excluding cost of power). Note :- 1. In column no. 16 indicative flow and in column no. 17 Net Present Value (NPV) factor is mentioned infront of relative year. 2. Bidder has to quote the price for related year, its present value will be calculated based on NPV factor and NPV will be used for evaluation purpose only and quoted price will be used for Bid contract value. 3. Threshold flow is 24 MLD | |||||||||||
| 2.011st Year | |||||||||||
| 2.02 | Manpower | 1 | year | 71,15,828 ₹84.0 L | 1,20,00,000 ₹1.4 Cr | 1,30,93,264 ₹1.5 Cr | 79,70,380.08 ₹94.1 L | 84,00,000 ₹99.1 L | 80,00,000 ₹94.4 L | 90,00,000 ₹1.1 Cr | 36,00,000 ₹42.5 L |
| 2.03 | Repair and maintenance | 1 | year | 44,30,409 ₹52.3 L | 2,40,000 ₹2.8 L | 45,00,370 ₹53.1 L | 76,23,786.36 ₹90.0 L | 18,00,000 ₹21.2 L | 10,00,000 ₹11.8 L | 22,50,000 ₹26.6 L | 5,00,000 ₹5.9 L |
| 2.04 | Chemical | 1 | year | 10,47,521 ₹12.4 L | 12,00,000 ₹14.2 L | 14,06,365 ₹16.6 L | 47,87,618.35 ₹56.5 L | 79,00,000 ₹93.2 L | 6,00,000 ₹7.1 L | 22,50,000 ₹26.6 L | 12,00,000 ₹14.2 L |
| 2.05 | Additional O&M Price for treatment of additional sewage in excess of the Threshold on a per MLD basis (Amount Per MLD) | 1 | MLD | - | - | - | - | - | - | - | - |
| 2.062nd Year | |||||||||||
| 2.07 | Manpower | 1 | year | 73,29,303 ₹86.5 L | 1,32,00,000 ₹1.6 Cr | 1,38,39,580 ₹1.6 Cr | 75,73,286.02 ₹89.4 L | 84,00,000 ₹99.1 L | 80,00,000 ₹94.4 L | 94,50,000 ₹1.1 Cr | 36,00,000 ₹42.5 L |
Tender Value
₹175.5 Cr
EMD Value
₹2 Cr
Closing Date
17 Jul 2023, 2:00 pmClosed
Superintending Engineer
Office of Superintending Engineer Ashok Nagar Near TV Tower OHT Campus Prayagraj
Interception Diversion of Balance 13 drains and Augmentation of SALORI STP Capacity by 43 MLD (Sewerage District C) including Operation and Maintenance for 15 years at Prayagraj UP
2023_UPJNG_803144_1
59/E-TENDER/15 DATE 17.05.2023
Open Tender
Civil Works
420 days
Prayagraj
As per Bid Document
2 documents required · 2 mandatory
₹0
₹2 Cr
Prayagraj
7 Nov 2023
19 May 2023
17 Jul 2023
19 May 2023
17 Jul 2023
5 Jun 2023
19 May 2023 - 29 May 2023
29 May 2023
Construction of 43 MLD STP at Salori and its appurtenant work
Survey, Investigation, Design, drawing and construction of 43 MLD STP (including interconnection between this 43 MLD STP recieving chamber and existing 29 MLD STP recieving chamber) along with 20 KLD Fecal Sludge co-treatment Facility and appurtenant structures and allied work at existing Salori STP campus, Prayagraj city with appropriate and cost effective technology on sustainable & proven technology to deliver that treated effluent shall comply with the NGT directed discharge standards (April 2019). The work includes all civil structure and supply & erection of electro- mechanical equipments, instrumentation control works i.e transformer, DG set of suitable capacity with necessary accessaries, HT/LT panel with cable joiting material, earthing, suitable capacity non-clog submersible pumps (MOC- casing -2% NiCr, Impeller-ASTM CF8M, Shaft & Shaft sleeve- ASTM SS 410) capable of pumping 100mm particle with necessary accessaries such as motor, gate, valve, manual / mechanical screen,grit mechanism, blower , Electro-magnetic flowmeter cum totalizer having characteristics/ MOC Liner : polyurethane or Hand Rubber / Electric MOC : SS316L/ Housing : Die Cast Aluminium or CS/ Power Supply : 90-230 V AC / Output: 4 - 20 mA with HART/ Sensor Cable : 10 mt / Flow Tube or Sensor housing protection IP68/ Process Flange : SS316/Display:31/2 LCD Display/ Cable Connection: 1/2" NPT /Accuracy: 0.5% etc. for the proposed STP including power connection from the meter room of UPPCL, all required buildings including office cum laboratary building , campus roads, water supply system , sewerage & drainage system, guard room, rain water harvesting works, external & internal electrification including lighting arrangement , boundary wall, site development, plantation, PLC and SCADA with display screen in appropiate size, stand by power arrangement etc complete.
Operation & Maintenance of all civil and E&M works of 43 MLD STP along with 20 kld co-treatment facility at Salori, effluent gravity line, associate infrastructure and allied work for 15 years (excluding cost of power). Note :- 1. In column no. 16 indicative flow and in column no. 17 Net Present Value (NPV) factor is mentioned infront of relative year. 2. Bidder has to quote the price for related year, its present value will be calculated based on NPV factor and NPV will be used for evaluation purpose only and quoted price will be used for Bid contract value. 3. Threshold flow is 24 MLD
1st Year
Manpower
Repair and maintenance
Chemical
Additional O&M Price for treatment of additional sewage in excess of the Threshold on a per MLD basis (Amount Per MLD)
2nd Year
Manpower
Repair and maintenance
Chemical
Additional O&M Price for treatment of additional sewage in excess of the Threshold on a per MLD basis (Amount Per MLD)
3rd Year
Manpower
Repair and maintenance
Chemical
Additional O&M Price for treatment of additional sewage in excess of the Threshold on a per MLD basis (Amount Per MLD)
4th Year
Manpower
Repair and maintenance
Chemical
Additional O&M Price for treatment of additional sewage in excess of the Threshold on a per MLD basis (Amount Per MLD)
5th Year
Manpower
Repair and maintenance
Chemical
Additional O&M Price for treatment of additional sewage in excess of the Threshold on a per MLD basis (Amount Per MLD)
6th Year
Manpower
Repair and maintenance
Chemical
Additional O&M Price for treatment of additional sewage in excess of the Threshold on a per MLD basis (Amount Per MLD)
7th Year
Manpower
Repair and maintenance
Chemical
Additional O&M Price for treatment of additional sewage in excess of the Threshold on a per MLD basis (Amount Per MLD)
8th Year
Manpower
Repair and maintenance
Chemical
Additional O&M Price for treatment of additional sewage in excess of the Threshold on a per MLD basis (Amount Per MLD)
9th Year
Manpower
Repair and maintenance
Chemical
Additional O&M Price for treatment of additional sewage in excess of the Threshold on a per MLD basis (Amount Per MLD)
10th Year
Manpower
Repair and maintenance
Chemical
Additional O&M Price for treatment of additional sewage in excess of the Threshold on a per MLD basis (Amount Per MLD)
11th Year
Manpower
Repair and maintenance
Chemical
Additional O&M Price for treatment of additional sewage in excess of the Threshold on a per MLD basis (Amount Per MLD)
12th Year
Manpower
Repair and maintenance
Chemical
Additional O&M Price for treatment of additional sewage in excess of the Threshold on a per MLD basis (Amount Per MLD)
13th Year
Manpower
Repair and maintenance
Chemical
Additional O&M Price for treatment of additional sewage in excess of the Threshold on a per MLD basis (Amount Per MLD)
14th Year
Manpower
Repair and maintenance
Chemical
Additional O&M Price for treatment of additional sewage in excess of the Threshold on a per MLD basis (Amount Per MLD)
15th Year
Manpower
Repair and maintenance
Chemical
Additional O&M Price for treatment of additional sewage in excess of the Threshold on a per MLD basis (Amount Per MLD)
Guaranteed Energy Consumption for 43 MLD STP Salori including Office, Campus Lighting etc. for the first month after COD (The permissible variation in GEC quoted for different BOD condition to be limited such that ratio of Max GEC to Min GEC must be maximum up to 1.5, if absurd value is quoted bid will be summarily rejected) (Value should be entered in all cell of rows 80 to 88, after adjusting for energy generated through solar power plant if proposed to be installed)
For flow upto 24 MLD and BOD upto 125 mg/L
For flow upto 24 MLD and BOD > 125 mg/L and upto 175 mg/L
For flow upto 24 MLD and BOD > 175 mg/L
For flow > 24 MLD upto 33 MLD and BOD upto 125 mg/L
For flow > 24 MLD upto 33 MLD and BOD > 125 mg/L and upto 175 mg/L
For flow > 24 MLD upto 33 MLD and BOD > 175 mg/L
For flow > 33 MLD and BOD upto 125 mg/L
For flow > 33 MLD and BOD > 125 mg/L and upto 175 mg/L
For flow > 33 MLD and BOD > 175 mg/L
Average Power Guaranteed (Not to be filled by bidder)(For the purpose of bid evaluation this value to be used, if absurd value will be quoted bid will be summarily rejected)
Power Charges for Salori STP of 43 MLD (= 43MLD (For evaluation purpose) x …………..Unit Consumed/MLD x 5475 days x 10.20 ) (Not to be filled by the bidder)
Land requirement (sqm) - 43 MLD STP and 43 MLD Rajapur EPS at (Circle rate Rs.9800.00 per sqm) (Bidder is required to quote the land requirement including land required for solar Power Plant if proposed, subject to available land i.e 15000 sqm.)
Effluent Gravity Main Pipe
Laying of Effluent Gravity Main Pipe Line by open cut method
Survey, review of design and re-design if required, Supply & laying of 1400 mm dia of RCC NP4 pipe from STP to outfall point with suitable outfall structure to discharge effluent with protection work true to alignment and slope as per design, Socket / spigot pipes, rubber rings jointing materials and specials from store to the work lowering the same in to the trenches up to depth as specified below G.L. true to alignment and gradient, barricading of site, traffic diversion arrangement, dismantling of roads, mechanical/ manual excavation, dewatering (as per requirement), shoring & timbering with mild steel/ wooden planks, construction of required class beddings, construction of RCC manholes upto HFL in accordance with the provisions laid down in latest version of IS 4111 (Part 1), refilling of trenches with proper compaction including disposal of surplus earth with in 8 km radius, temporary reinstatement of dismantled roads, cost of all jointing material, testing & commissioning etc. complete including supply of all material, labour, T&P and construction of RCC manhole as per design etc. required for proper completion of work.
Laying of Effluent Gravity Main Pipe Line by trenchless method
Microtunneling under bund for laying of 1400 mm dia RCC NP4 pipe Effluent carrier pipe line including Supply of 2200 mm dia 25 mm thick mild steel casing pipe with inside 2 coats of food grade epoxy painting over 1 coat of epoxy primer and outside 2 coats of anti-corrosive red oxide primer as per specification and Installation of product pipe by Guided Auger Bored method including making of entry and exit pits, all related civil works like excavation, shoring/strutting, etc., shielded excavation through auger boring process, lowering of pipe segments in the jacking pit, laying and jointing of product pipeline through jacking process from the jacking pit, construction of required manholes and restoration of site after project completion.
Effluent Pumping Station
Survey, Investigation, Design, drawing and Construction of Effluent Pumping Station of following capacity including construction of wet well, Valve chamber, MEP building / LT room, transformer yard with chain link fencing around it, Platform for Diesel Generator including stainless steel railing around, shed over the generator, approach road, fire fighting arrangment, land scaping, site development, Boundary wall and fencing with 2 gate if required, security room/cabin along with supply, installation testing and commissioning of suitable capacity of non-clog submersible pumps (MOC- casing -2% NiCr, Impeller-ASTM CF8M, Shaft & Shaft sleeve- ASTM SS 410) capable of pumping 100mm particle with necessary accessaries such as motor, motor & starter and S.S Guide rail system and composite control panel, main piping and valve (Sluice valve, Reflex valve, S.S Nut bolt washer with rubber packing, Piping with common header as per required), gates, metering apparatus, gauges, Electro-magnetic flowmeter cum totalizer having characteristics/ MOC Liner : polyurethane or Hand Rubber / Electric MOC : SS316L/ Housing : Die Cast Aluminium or CS/ Power Supply : 90-230 V AC / Output: 4 - 20 mA with HART/ Sensor Cable : 10 mt / Flow Tube or Sensor housing protection IP68/ Process Flange : SS316/Display:31/2 LCD Display/ Cable Connection: 1/2" NPT /Accuracy: 0.5% , level sensor/ indicator and transmitter, automation of EPS by SCADA system online monitering and control by STP PLC system, lifting arrangement including E.O.T crane with travelling trolly & chain pully block, HT panel, Transformer, LT panel, HT/ LT cable with jointing material, G.I strips, plate earthing, electric resistance rubber sheets, Diesel Generating Sets with Auto Synchronizing Panel , chequered plate and gaurds, M.S trusses, grit cover, S.S railing, lighting wiring (internal and external) etc with necessary tools and spares, provision for testing of each pumps set, valve etc at manufacturer works and at site , painting of all pumps, piping and valves with two coat enamel paint etc. including Installation, commissioning and testing of all E&M equipments complete to be the satisfaction of engineer incharge with 3 month trial and run.
Construction of Effluent Pumping Station – 1 No. (43 MLD in Year 2039/ 60 MLD in Year 2054).Capacity of civil works will be for design year capacity (i.e., 60 MLD). E&M equipment’s will be installed for Mid-Year -2039. (i.e., 43 MLD)
Laying of effluent Rising Main Pipe Line
Survey, review of design and re-design if required, Supply and laying of 1000 mm diameter DI K-9 Socket/spigot pipes, rubber rings jointing materials and specials froms store to the work lowering the same in to the trenches up to depth as specified below G.L true to alignment dismantling of road, mechanical/manual excavation, dewatering, shoring and timbering if required, with mild steel/ wooden planks, refilling of trenches with proper compaction including disposal of surplus earth with in 8 km radius, Permanent reinstatement of dismantled roads, cost of all jointing material, testing & commissioning including construction of thrust block ,supply of all Specials, labour, T&P etc. required for proper completion of work. including supply & fixing of same size/as per specification sluice valve, air valve, scour valve, surge protection etc. as per direction of Engineer In-charge.
1000 mm dia DI K-9 pipe
Operation & Maintenance of all civil and E&M works of 43 MLD Salori EPS, Effuluent Rising Main and associate infrastructure and allied work for 15 years (excluding cost of power) 1. In column no. 17 Net Present Value (NPV) factor is mentioned infront of relative year. 2. Bidder has to quote the price for related year, its present value will be calculated based on NPV factor and NPV will be used for evaluation purpose only and quoted price will be used for Bid contract value.
1st Year
Manpower
Repair and maintenance
2nd Year
Manpower
Repair and maintenance
3rd Year
Manpower
Repair and maintenance
4th Year
Manpower
Repair and maintenance
5th Year
Manpower
Repair and maintenance
6th Year
Manpower
Repair and maintenance
7th Year
Manpower
Repair and maintenance
8th Year
Manpower
Repair and maintenance
9th Year
Manpower
Repair and maintenance
10th Year
Manpower
Repair and maintenance
11th Year
Manpower
Repair and maintenance
12th Year
Manpower
Repair and maintenance
13th Year
Manpower
Repair and maintenance
14th Year
Manpower
Repair and maintenance
15th Year
Manpower
Repair and maintenance
Guaranteed Energy Consumption for 43 MLD EPS Salori including Office, Campus Lighting etc. for the first month after COD (The permissible variation in GEC quoted for different flow condition to be limited such that ratio of Max GEC to Min GEC must be maximum up to 1.2, if absurd value is quoted bid will be summarily rejected) (Value should be entered in all cell of rows 150 to 151, after adjusting for energy generated through solar power plant if proposed to be installed)
For flow upto 43 MLD
For flow > 43 MLD
Average Power Guaranteed (Not to be filled by bidder)(For the purpose of bid evaluation this value to be used, if absurd value will be quoted bid will be summarily rejected)
Power Charges for 43 MLD EPS at Exiting Salori Campus (= 43 MLD x……….. Unit Consumed/MLD x 15yearsx60days x10.20) (Not to be filled by the bidder)
Landscaping, signboard, firefighting, hiring of godown & Rehabilitation of Existing Salori Gravity Interceptor line
Hiring of godown, Landscaping, plantation, signboards/ Display board firefighting/ fire Hydrants at Rajapur STP campus including all labour material T&P etc complete.
Cleaning jungle including uprooting of rank vegetation, grass, bruss wood, trees and removal of rubbish up to a distance of 50 m outside the periphery of the area.
Rehabilitation of existing salori gravity (dia. 900 to 1100 mm) Interceptor line with Manhole from tapping point at AB culvert to receiving chamber at Bund of Salori STP
Interception & Diversion and construction for Nala tapping (Wier wall/Gate wall) arrangements for 13 nos Drains
Survey, Design and construction of Interception and diversion arrangements for 13 nos of Drains including Making of earthen bund across the existing drain for diversion during construction period, dewatering(if required), excavation including watering, ramming, dressing, back filling between wall and foundation and disposal of surplus earth with 50m, PCC (1:4:8), RCC work (M-25), construction of RCC manhole above HFL level (if required) along with supply and fixing, installation of SS coarse screen, SS gate, sluice valve, connection to interceptor line including supply of all material labour, T&P etc. and other related work as per direction of engineer incharge.
Shivkuti Drain -01
Shivkuti Drain -02
Shivkuti Drain -03
Shivkuti Drain -04
Shivkuti Drain -05
Shivkuti Drain -06
Shivkuti Drain -07
Govindpuri Colony Drain Purani Basti
Govindpuri Colony Drain -01
Govindpuri Colony Drain -02
Govindpuri Colony Drain -03
Govindpuri Colony Drain -04
Amitabh Bachhan Culvert / Salori Drain
Interceptor/ Trunk Sewer Line
Laying of Interceptor Sewer Line by Open cut method
Survey, review of design and re-design if required, supply & laying of following sizes of NP4 Class Socket / spigot pipes, rubber rings jointing materials and specials from store to the work lowering the same in to the trenches up to depth as specified below G.L. true to alignment and gradient, hydrolic testing & commissioning including barricading of site, traffic diversion arrangement, dismantling of roads, mechanical/ manual excavation, dewatering (as per requirement), shoring & timbering with mild steel/ wooden planks, construction of required class beddings, construction of RCC manholes above HFL with heavy duty SFRC cover as per CPHEEO manual in accordance with the provisions laid down in latest version of IS 4111 (Part 1), refilling of trenches with proper compaction including disposal of surplus earth with in 8 km radius, Permanent reinstatement of dismantled roads, shifting & reinstatement of existing utilities if any, bailing out of water, cost of all jointing material, testing & commissioning etc. complete including supply of all material, labour, T&P etc. required for proper completion of work.
Shivkuti Drain 1 to Shivkuti Drain - 4
300 mm dia
400 mm dia
Gravity Sewer line at Shivkuti Drain 5 to Amitabh Bachhan Culvert SPS
500 mm dia
600 mm dia
Sewage Pumping Station
Survey, Investigation, Design, drawing and Construction of Sewerage Pumping Station of following capacity including construction of sump well/wet well, Screen channels, Valve chamber, MEP building HT / LT / metering room, transformer yard with chain link fencing around it, Platform for Diesel Generator including stainless steel railing around, shed over the generator, approach road, fire fighting arrangment, land scaping, site development, type B staff quarter, Boundary wall and fencing with 2 gate if required, security room/cabin along with supply, installation testing and commissioning of suitable capacity non-clog submersible pumps (MOC- casing -2% NiCr, Impeller-ASTM CF8M, Shaft & Shaft sleeve- ASTM SS 410) capable of pumping 100mm particle with necessary accessaries such as motor, motor & starter and S.S Guide rail system and composite control panel, main piping and valve (Sluice valve, Reflex valve, S.S Nut bolt washer with rubber packing, Piping with common header as per required), mechanical/ manual coarse bar screen, screen gates, metering apparatus, gauges, Electro-magnetic flowmeter cum totalizer having characteristics/ MOC Liner : polyurethane or Hand Rubber / Electric MOC : SS316L/ Housing : Die Cast Aluminium or CS/ Power Supply : 90-230 V AC / Output: 4 - 20 mA with HART/ Sensor Cable : 10 mt / Flow Tube or Sensor housing protection IP68/ Process Flange : SS316/Display:31/2 LCD Display/ Cable Connection: 1/2" NPT /Accuracy: 0.5% , level sensor/ indicator and transmitter, automation of SPS by SCADA system online monitering and control by STP PLC system, lifting arrangement including E.O.T crane with travelling trolly & chain pully block, HT/LT cable with jointing material, G.I strips, plate earthing, electric resistance rubber sheets, Diesel Generating Sets with Auto Synchronizing Panel , chequered plate and gaurds, M.S trusses, grit cover, S.S railing, lighting wiring(internal and external) etc with necessary tools and spares, provision for testing of each pumps set, valve etc at manufacturer works and at site , painting of all pumps, piping and valves with two coat enamel paint etc.including Installation, commissioning and testing of all E&M equipments complete to be the satisfaction of engineer incharge with 3 month trial and run.
Construction of Amitabh Bachhan Culvert SPS including all Civil and E&M Works for capacity of 40 MLD (Civil works) and 32 MLD (E&M works)
Construction of Sitaram Ghat SPS including all Civil and E&M Works for capacity of 3 MLD (Civil & E&M works)
Rising Main Pipe Line
Laying of Rising Main Pipe Line by open cut method
Survey, review of design and re-design if required, Supply and laying of following diameter DI K-9 Socket/spigot pipes, rubber rings jointing materials and specials froms store to the work lowering the same in to the trenches up to depth as specified below G.L true to alignment dismantling of road, mechanical/manual excavation, dewatering, shoring and timbering if required, with mild steel/ wooden planks, refilling of trenches with proper compaction including disposal of surplus earth with in 8 km radius, Permanent reinstatement of dismantled roads, cost of all jointing material, testing & commissioning including construction of thrust block ,supply of all Specials, labour, T&P etc. required for proper completion of work. including supply & fixing of same size/as per specification sluice valve, air valve & scour valve, surge protection as per direction of Engineer In-charge.
300 mm dia DI K-9 pipe from Sitaram Ghat SPS to Gravity Main
1000 mm dia DI K-9 pipe Rising main from Amitabh Bachhan Culvert to Salori STP
Laying of Rising Main Pipe Line by trenchless method
Microtunneling under bund for Supply & laying of 1000 mm dia DI K-9 rising main carrier pipe line including Supply of 1600 mm dia. (20 mm thick) casing mild steel pipes with inside 2 coats of food grade epoxy painting over 1 coat of epoxy primer and outside 2 coats of anti-corrosive red oxide primer as per specification and Installation of product pipe by Guided Auger Bored method including making of entry and exit pits, all related civil works like excavation, shoring/strutting, etc., shielded excavation through auger boring process, lowering of pipe segments in the jacking pit, laying and jointing of product pipeline through jacking process from the jacking pit, shifting & reinstatement of existing utilities if any, bailing out of water, dewatering if any and restoration of site after project completion (Under Rajapur bund and Highway crossing near Mumfordganj SPS)
Guaranteed Energy Consumption for 32 MLD Amitabh Bachhan Culvert SPS at Amitabh Bachhan culvert including Office, Campus Lighting etc. for the first month after COD (The permissible variation in GEC quoted for different flow condition to be limited such that ratio of Max GEC to Min GEC must be maximum up to 1.2, if absurd value is quoted bid will be summarily rejected) (Value should be entered in all cell of S. No. 197 to 198, after adjusting for energy generated through solar power plant if proposed to be installed)
For flow upto 32 MLD
For flow > 32 MLD
Average Power Guaranteed (Not to be filled by bidder)(For the purpose of bid evaluation this value to be used, if absurd value will be quoted bid will be summarily rejected)
Power Charges for 32 MLD Amitabh Bachhan Culvert SPS (= 32 MLD x ……….Unit Consumed/MLD x 5475 days x10.20)(Not to be filled by the bidder)
Guaranteed Energy Consumption for 2.20 MLD Sitaram Ghat SPS including Office, Campus Lighting etc. for the first month after COD (The permissible variation in GEC quoted for different flow condition to be limited such that ratio of Max GEC to Min GEC must be maximum up to 1.2, if absurd value is quoted bid will be summarily rejected) (Value should be entered in all cell of S. No. 202 to 203, after adjusting for energy generated through solar power plant if proposed to be installed)
For flow upto 2.20 MLD
For flow > 2.20 MLD
Average Power Guaranteed (Not to be filled by bidder)(For the purpose of bid evaluation this value to be used, if absurd value will be quoted bid will be summarily rejected)
Power Charges for 2.2 MLD Sitaram Ghat SPS (= 2.2 MLD x ………..Unit Consumed/MLD x 5475 days x10.20) (Not to be filled by the bidder)
Operation & Maintenance of all civil and E&M works of 32 MLD Amitabh Bachhan Culvert SPS and associate infrastructure and allied work for 15 years (excluding cost of power) 1. In column no. 17 Net Present Value (NPV) factor is mentioned infront of relative year. 2. Bidder has to quote the price for related year, its present value will be calculated based on NPV factor and NPV will be used for evaluation purpose only and quoted price will be used for Bid contract value.
1st Year
Manpower
Repair and maintenance
2nd Year
Manpower
Repair and maintenance
3rd Year
Manpower
Repair and maintenance
4th Year
Manpower
Repair and maintenance
5th Year
Manpower
Repair and maintenance
6th Year
Manpower
Repair and maintenance
7th Year
Manpower
Repair and maintenance
8th Year
Manpower
Repair and maintenance
9th Year
Manpower
Repair and maintenance
10th Year
Manpower
Repair and maintenance
11th Year
Manpower
Repair and maintenance
12th Year
Manpower
Repair and maintenance
13th Year
Manpower
Repair and maintenance
14th Year
Manpower
Repair and maintenance
15th Year
Manpower
Repair and maintenance
Operation & Maintenance of all civil and E&M works of 3 MLD Sitaram Ghat SPS and associate infrastructure and allied work for 15 years (excluding cost of power) 1. In column no. 17 Net Present Value (NPV) factor is mentioned infront of relative year. 2. Bidder has to quote the price for related year, its present value will be calculated based on NPV factor and NPV will be used for evaluation purpose only and quoted price will be used for Bid contract value.
1st Year
Manpower
Repair and maintenance
2nd Year
Manpower
Repair and maintenance
3rd Year
Manpower
Repair and maintenance
4th Year
Manpower
Repair and maintenance
5th Year
Manpower
Repair and maintenance
6th Year
Manpower
Repair and maintenance
7th Year
Manpower
Repair and maintenance
8th Year
Manpower
Repair and maintenance
9th Year
Manpower
Repair and maintenance
10th Year
Manpower
Repair and maintenance
11th Year
Manpower
Repair and maintenance
12th Year
Manpower
Repair and maintenance
13th Year
Manpower
Repair and maintenance
14th Year
Manpower
Repair and maintenance
15th Year
Manpower
Repair and maintenance
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.06 MB
Vol1.pdf
Tender Documents • 4.45 MB
Vol2.pdf
Tender Documents • 7.27 MB
BOQ_1344093.xls
BOQ • 0.56 MB
Download all tender documents and submit your bid