Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹9.1 LAccepted-AOC AT UPPER BOOTY NEAR KRISHNA NURSING HOME P S SADAR RANCHI JHARKHAND 835217 | RANCHI | JHARKHAND | 835217 | L-1 | Accepted-AOC L1 bidder | |
| 2 | L-2₹9.3 L+₹19,132.50 (2.11%)Rejected-Finance BOOTY SADAR RANCHI 835219 | RANCHI | RANCHI | JHARKHAND | 835219 | L-2 | Rejected-Finance Bidder stands L2 | |
| 3 | L-3₹9.3 L+₹26,575.20 (2.93%)Rejected-Finance | L-3 | Rejected-Finance Bidder stands L3 |
Tender Value
₹9.1 L
EMD Value
₹18,300
Closing Date
5 Feb 2020, 3:00 pmClosed
General Manager, Transmission Zone-III, Jamshedpur
General Manager, Transmission Zone-III, Jamshedpur, Campus 132/33 Kv. Grid Colony Adityapur-I, Phase-VI, Post- Gamharia, Seraikella-Kharsawan, Pin Code- 832108 (Jharkhand)
Overhauling and Arresting the oil leakage from different points and filtration of oil of 220/132 kV 100 MVA Transformer (Make Transformer and Rectifier India Limited Tr. No-4, Sl. No-JSB44821) at GSS Chandil-1
2020_JSEB_44057_1
eNIT No. 145/PR/JUSNL/2019-20
Open Tender
Electrical Works
Works
75 days
220/132 kV GSS Chandil-1
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,475
Accounts Officer, Transmission Zone-III,Jamshedpur
₹18,300
17 Apr 2020
15 Jan 2020
6 Feb 2020
15 Jan 2020
5 Feb 2020
15 Jan 2020
Overhauling and Arresting the oil leakage from different points & filtration of oil of 220/132 kV 100 MVA Transformer (Make:-Transformer and Rectifier India Limited Make Tr. No-4, Sl. No-JSB44821) at GSS Chandil-1
Drainage of 38 KL transformer oil
Unloading of 25 KL oil storage tanker at site and loading the same after completion of the job.
Providing daily hire charge of 2 nos 25 KL oil storage tank(2x20=40 days)
Dismantalling of whole accesories for rectification of transformer oil leakage
Supply of rubberized cork sheet of mentioned size a) 8mm rubberized cork gasket( 2x3) feet sheet
b) 6 mm rubberized cork gasket( 2x3) feet sheet
Removal of old worn out gasket and replacement with new gasket including cutting pasting, punching complete job.
Erection of dismantled parts
Shifting of filter machine both end( 100 M)
Transporting of filtration machine from GSS Adityapur to GSS chandil-I. Loading and unloading L.S
Filtration of transformer oil 38000 L
Testing of transformer oil like BDV,PPM,DGA by recognized laboratory
Providing water proof covering during the filtration of transformer oil
2 to 5 Ton capacity crane hiring charge for erection and dismantling work for 16 HRS
Dry Nitrogen gas Cylinder
Replacement of defective PRV and MOG( including dismantling and assembly)
Supply of gasket( 06 mm) for radiator, conservator tank and its inspection cover
Assistant labour for filtartion of transformer oil for a period of 5 days
Unforeseen work and material required during the work
Erection of hardware fitting
Testing of transformer
Deepak Kumar Sah
M/s Siddtharth Power
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .