Loading…
Loading…
Tender Value
₹2.8 L
EMD Value
₹6,000
Closing Date
20 Aug 2026, 11:00 amClosed
EE(BR V)
22 SURYA SEN STREET KOL-12
REPAIRING OF FOOTPATH AT 22, STRAND ROAD, 2 RAJA WOOD MOUNT ST. ETC IN WARD NO 045
2026_KMC_1037044_1
KMC/EE(C)/Br-V/45/05/26-27/2ND
Open Tender
CIVIL WORKS
Percentage
28 days
WARD-45
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹6,000
5 Sept 2026
10 Aug 2026
22 Aug 2026
10 Aug 2026
20 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 0.53 | %M3 | 11,927 | ₹6,321.31 |
| 2 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 305.08 | SQM | 24 | ₹7,321.92 |
| 3 | ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018) | 22.88 | M3 | 6,216 | ₹1,42,222.08 |
| 4 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. II. COMPOUND DEVELOPMENT: 18) Stone set pavement with the joints set close in cement mortar (1:6) excluding the cost of stone sets but including the cost of carriage thereof within a lead of 150 m. (i) When laid with a cushion of sand below (including cost thereof). (a) 100 mm thick pavement | 305.08 | SQM | 59 | ₹17,999.72 |
| 5 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. | 239.5 | MTR | 8.17 | ₹1,956.72 |
| 6 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. | 115.5 | MTR | 8.17 | ₹943.64 |
| 7 | Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 350mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-divider / footpath) | 30 | EA | 292.48 | ₹8,774.4 |
| 8 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018) | 6.95 | M3 | 4,761 | ₹33,091.52 |
| 9 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). a) Vertical Kerb | 115.5 | MTR | 21.34 | ₹2,464.77 |
| 10 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone. | 239.5 | MTR | 18.24 | ₹4,368.48 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.40 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tendernotice_2.pdf
PDF • 0.10 MB
Tendernotice_3.pdf
PDF • 0.83 MB
Tendernotice_4.pdf
PDF • 0.82 MB
BOQ_2547322.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .