Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹4.4 L
EMD Value
₹5,000
Closing Date
7 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BLOCK DEVELOPMENT OFFICER VP
KARAMBAKUDI
WORK 17 AGAMT 2022-23 KARU.KELATHERU PANCHAYAT
2022_RDTN_269212_1
WORK 17 AGAMT 2022-23 KARU.KELATHERU PANCHAYAT
Open Tender
Civil Works
Item Rate
180 days
KARAMBAKUDI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,000
12 Dec 2022
1 Dec 2022
7 Dec 2022
1 Dec 2022
7 Dec 2022
1 Dec 2022
Amount
Construction of Cremation shed, Construction of compound wall ,cement concrete road and Electrical arrangement @ Ramachandrakulam near samathuva BG in Kar.Keelatheru Panchayat
Earth work exacavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete
Refilling the basement with excavated earth othen than sand complying the including cost and conveyance of sand to worksite including all labour charges for filling etc complete
Brick Work in C m 1:5 mix using country brick of size 8 3/4 x 4 1/4 x2 3/4 including cost and conveyance of all materials to site and labour charges and etc,complete
Providing form work centering for soffits of slab of plan surface including shuttering 3m high using MS sheets of size 15 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification
R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Ceiling Plastering with CM 1:3, 10mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Cement Concrete in 1 : 2:4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Colour washing two coats with best shell lime including cost and conveyace of all materials to work site and all labour charges etc. complete
Earth work exacavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete
Filling with m-sand including cost and conveyance of sand to work site including all labour charges for filling etc complete
Brick Work in C m 1:5 mix using country brick of size 8 3/4 x 4 1/4 x2 3/4 including cost and conveyance of all materials to site and labour charges and etc,complete
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification
R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Plastering with CM 1:5, 12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Colour washing two coats with best shell lime including cost and conveyace of all materials to work site and all labour charges etc. complete
Earth work excavation in all soils with initial lead of 10m and lift of 2 M
Filling with m-sand including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Providing form work centering for soffits of slab of plan surface including shuttering 3m high using MS sheets of size 15 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M SELVARAJ
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .