Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical NO 162 KARUMARIAMMAN KOIL STREET ATHIPATTU PUDU NAGAR CHENNAI 600 120 | THIRUVALLUR | TAMIL NADU | 600120 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical NO 135 T H ROAD MINJUR 601 203 | THIRUVALLUR | TAMIL NADU | 601203 | Admitted-Fee/PreQual/Technical |
Tender Value
₹25.4 L
EMD Value
₹25,400
Closing Date
4 Dec 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/CM/NCTPS-I
NCTPS-I Chennai-120
Formation of Reinforced Cement Concrete road along 1400 S from Ch.360.00m to Ch.405.00m inside NCTPS_I premises.
2025_EB_624757_1
CE /NCTPS-I/SE/ CM/116/2025-26
Open Tender
Civil Works
Works
60 days
CE/NCTPS-1
Refer Tender Document
2 documents required · 2 mandatory
₹0
₹25,400
Yes
9 Mar 2026
19 Nov 2025
5 Dec 2025
19 Nov 2025
4 Dec 2025
19 Nov 2025
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: CE/NCTPS-I
Name of Work: NCTPS –I- CM Circle – CM-I- Formation of Reinforced Cement Concrete road along 1400 S from Ch.360.00m to Ch.405.00m inside NCTPS-I premises.
Contract No: CE/SE/CM/NCTPS-I/116/2025-26
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Scope of Work Item Code / Make Quantity Units HSN / SAC CODE Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE for Work portion in figures to be entered by the Bidder Rs. P BASIC RATE for Labour charges of Erection portion Rs. P BASIC RATE for consumables charges of erection portion Rs. P Packing & Forwarding Charges in percentage Freight & Insurance charges in precentage GST in percentage IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 NCTPS –I- CM Circle – CM-I- Formation of Reinforced Cement Concrete road along 1400 S from Ch.360.00m to Ch.405.00m inside NCTPS-I premises.
1.01 Dismantling the damaged RCC culvert and cleaning away the debris from the site including the cost of T&P, lead, lift, labour, etc., complete. Item 1 35.5 cum Excess(+) Full Conversion INR
1.02 Earthwork excavation in all soils with initial lead of 10m and lift of 2m including labour, T&P, etc., complete. Item 2 90.5 cum Excess(+) Full Conversion INR
1.03 Providing and forming of road using mil reject and wet ash in the mix proportion of 90% of mill reject and 10% of wet ash collected from NCTPS-I for filling the pot holes including all lead, lift mixing and laying consolidation using power roller and compacted as directed by engineer at site. (Mill reject and wet ash will be issued at free of cost by the department). Item 3 90.5 cum Excess(+) Full Conversion INR
1.04 Plain cement concrete 1:4:8 using 20mm HBG metal including cost of all materials, lead, lift, labour charges, curing, etc, complete. Item 4 39 cum Excess(+) Full Conversion INR
1.05 Providing RCC 1:1.5:3 using 12 and 20mm HBG broken stone for box culvert near Eastern side ramp at Primary Pond-II of Ash dyke including cost of all materials, lead, lift, shuttering charges, curing charges etc., complete and as directed by the Engineer at site. Item 5 35.5 cum Excess(+) Full Conversion INR
1.06 Providing and placing RCC 1:2:4 using 12 to 20 mm HBG metal including shuttering charges, cost of all materials, labour, lead, lift and mixing charges excluding the cost of reinforcement etc, complete. Item 6 56.5 cum Excess(+) Full Conversion INR
1.07 Supplying and providing steel reinforcement for concrete work including cost of all materials lead, lift, transporting charges, cutting, bending, tying and placing in position, etc., complete and as directed by the Engineer at site. Item 7 8215 Kgs Excess(+) Full Conversion INR
1.08 Supplying and placing in position of joint filler in between concrete joints using preformed bitumen Impregnated fiber board to a thickness of 25 mm and sealing with hot bitumen sealing compound as top filler including the cost of all materials, labour, lead, lift etc., complete Item 8 14 cum Excess(+) Full Conversion INR
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.14 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_747097.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .