Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 56 57 HADAPSAR INDUSTRIAL ESTATE HADAPSAR PUNE MAHARASHTRA 411013 | PUNE | PUNE | MAHARASHTRA | 411013 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
16 Jul 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Ananth Joseph
Technip India Limited, 19, Velachery Main Road, Guindy, Chennai - 600032.
Design, Engg, Manufacture, Inspection, Documentation, Supply and Augmentation of Control and Safety System as per MR 080557C-000-MR-1511-001 Rev B.
2021_REFHQ_136720_1
TP/080557C001/205/1511-001/51
Single
Instrumentation-Goods
Supply
210 days
IOCL PARADIP REFINERY
Refer Tender documents
3 documents required · 3 mandatory
Exempted
1 Dec 2021
14 Jun 2021
17 Jul 2021
14 Jun 2021
16 Jul 2021
25 Jun 2021
14 Jun 2021 - 8 Jul 2021
120 days
DCS, ESD, GDS & FDAS System (ICSS) for SRR-816- Additional tank VGO: As per supply requisition which includes as a minimum : - Supply of all hardware and Software, required for the ICSS modification Job in SRR-816 - FAT (Factory Acceptance Test) - Installation, Integration of hardware/software with DCS and to establish data communication system ESD/GDS/FDAS system - Required Software for new installation (if any). - Complete engineering which includes submission of datasheet/drawing / documentation and O&M Manuals. - Upgradation of Software license if any , additional SCADA points if any, augmentation of work stations / servers storage capacity, if any - Power on pre-SAT and SAT -mandatory spares as per annexure 1 - Pre-commissioning /Commissioning /Start-up activities (Spares as per System vendor recommendation) - Warranty of the supplied items - Modification related to SRR-816 that needs to be performed at (MCR) SRR-815 & SRR-812. -Third party inspection -Communication system between control system and other system & 3rd party interfaces -Set of special Tools for installation, testing and Commissioning -Set of spare parts for pre-commissioning / start-up as per Vendor Recommendation -Documentation including certification purpose & 1 Lot customs clearance -Packing and Marking -Frieght Charges
DCS, ESD, GDS & FDAS System (ICSS) for SRR-817- Additional Tank NHT & DHT: As per supply requisition which includes as a minimum : - Supply of all hardware and Software, required for the ICSS modification Job in SRR-817 - FAT (Factory Acceptance Test) - Installation, Integration of hardware/software with DCS and to establish data communication system ESD/GDS/FDAS system - Required Software for new installation (if any). - Complete engineering which includes submission of datasheet/drawing / documentation and O&M Manuals. - Upgradation of Software license if any , additional SCADA points if any, augmentation of work stations / servers storage capacity, if any - Power on pre-SAT and SAT - Mandatory spares as per annexure 1 - Pre-commissioning /Commissioning /Start-up activities(Spares as per System vendor recommendation) - Warranty of the supplied items - Modification related to SRR-816 that needs to be performed at (MCR) SRR-815 & SRR-812. -Third party inspection -Communication system between control system and other system & 3rd party interfaces -Set of special Tools for installation, testing and Commissioning -Set of spare parts for pre-commissioning / start-up as per Vendor Recommendation -Documentation including certification purpose & 1 Lot customs clearance -Packing and Marking -Freight Charges
DCS, ESD, GDS & FDAS System (ICSS) for SRR-801 – Additional Sulphur Tank : As per supply requisition which includes as a minimum : - Supply of all hardware and Software, required for the ICSS modification Job in SRR-801 - FAT (Factory Acceptance Test) - Installation, Integration of hardware/software with DCS and to establish data communication system ESD/GDS/FDAS system - Required Software for new installation (if any). - Complete engineering which includes submission of datasheet/drawing / documentation and O&M Manuals. - Upgradation of Software license if any , additional SCADA points if any, augmentation of work stations / servers storage capacity, if any - Power on pre-SAT and SAT - Mandatory spares annexure 1 - Pre-commissioning /Commissioning /Start-up activities (Spares as per System vendor recommendation) - Warranty of the supplied items-Third party inspection -Third Party Inspection -Communication system between control system and other system & 3rd party interfaces -Set of special Tools for installation, testing and Commissioning -Set of spare parts for pre-commissioning / start-up as per Vendor Recommendation -Documentation including certification purpose & 1 Lot customs clearance -Packing and Marking -Freight Charges
DCS, ESD, GDS & FDAS System (ICSS) (MCR) SRR - 819 – Additional tank Alkylate, MS and PCK: As per supply requisition which includes as a minimum: - Supply of all hardware and Software, required for the ICSS modification Job in (MCR) SRR-819 including corrosion monitor for new extension of (MCR) SRR-819. - FAT (Factory Acceptance Test) - Installation, Integration of hardware/software with DCS and to establish data communication system ESD/GDS/FDAS system - Required Software for new installation (if any). - Complete engineering which includes submission of datasheet/drawing / documentation and O&M Manuals. - Upgradation of Software license if any, additional SCADA points if any, augmentation of work stations / servers storage capacity, if any - Power on pre-SAT and SAT - Mandatory spares as per annexure 1 - Pre-commissioning /Commissioning /Start-up activities (Spares as per System vendor recommendation) - Warranty of the supplied items -Third party inspection -Communication system between control system and other system & 3rd party interfaces -Set of special Tools for installation, testing and Commissioning -Set of spare parts for pre-commissioning / start-up as per Vendor Recommendation -Documentation including certification purpose & 1 Lot customs clearance -Packing and Marking -Freight Charges
DCS, ESD interface with SS-312N – Additional Tank: As per supply requisition which includes as a minimum: - Supply of all hardware and Software, required for the E&I interface for ICSS modification Job pertaining to additional tanks in north of creek - FAT (Factory Acceptance Test) - Integration of hardware/software with DCS system and to establish communication system between IRP and DCS/ESD in SRR801 & SRR-819.- Required Software for new installation (if any). - Complete engineering which includes submission of datasheet/drawing / documentation and O&M Manuals. - Upgradation of Software license if any, additional SCADA points if any, augmentation of work stations / servers storage capacity, if any - Power on pre-SAT and SAT - Mandatory spares as per annexure 1 - Pre-commissioning /Commissioning /Start-up activities (Spares as per System vendor recommendation) - Warranty of the supplied items -Third party inspection -Communication system between control system and other system & 3rd party interfaces -Set of special Tools for installation, testing and Commissioning -Set of spare parts for pre-commissioning / start-up as per Vendor Recommendation -Documentation including certification purpose & 1 Lot customs clearance -Packing and Marking -Freight Charges
FDAS System (ICSS) modification in Fire station FS- 407 & -408: As per supply requisition which includes as a minimum : - Supply and installation of all hardware and Software, required for the modification Job in FS-407. - Interface and integration of Fire and gas signals, New BFAP(if any) including augmentation in new or existing Hard wired console, graphics console, mimic panel etc., at fire station FS-407 - Interface and integration of Fire and gas signals including augmentation of existing graphics console etc., at fire station FS-408 - FAT (Factory Acceptance Test) - Installation, Integration of hardware/software, establish data communication system DCS, FDAS and GDS - Required Software for new installation (if any). - Complete engineering which includes submission of datasheet/drawing / documentation and O&M Manuals. - Upgradation of Software license if any, additional SCADA points if any, augmentation of work stations / servers storage capacity, if any - Power on pre-SAT and SAT - Mandatory spares as per annexure 1 - Pre-commissioning /Commissioning /Start-up activities (Spares as per System vendor recommendation) - Warranty of the supplied items -Third party inspection -Communication system between control system and other system & 3rd party interfaces -Set of special Tools for installation, testing and Commissioning -Set of spare parts for pre-commissioning / start-up as per Vendor Recommendation -Documentation including certification purpose & 1 Lot customs clearance -Packing and Marking -Freight Charges
Supervision of Post Commissioning (Refer Note: 5 above) Per diem charges for upto 8 hours work on normal working days
Supervision of Post Commissioning (Refer Note: 6 above) Overtime rate/hour beyond normal 8 Hours work on normal working days
Supervision of Post Commissioning (Refer Note: 6 above) Overtime rate/hour for work on weekly off days / Holidays (as applicable to project site)
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .