ADDITIONAL COLLECTOR (D) MADURAI
ADDITIONAL COLLECTOR (D) MADURAI
Construction of Cremation Shed and other infrastructure facilities to Samathuva Burial ground _ 2 nos. in AGAMT-II-2021-22 Village panchayats of T.Kallupatti Block in Madurai District in Package no. TKALL _03
2022_RDTN_238352_2
568/2022/D7 /tkal03/24.06.22
Open Tender
Civil Works
Item Rate
180 days
TKALLUPATTI
REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹12,000
1 Aug 2022
5 Jul 2022
20 Jul 2022
5 Jul 2022
20 Jul 2022
6 Jul 2022
Amount
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Supplying andSand filling with M.Sand inculding all cost and conveyance etc complete
Supplying and filling with Excavated Earth inculding all cost and conveyance etc complete
Supplying and filling with Conveyide Earth inculding all cost and conveyance etc complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Cement concrete 1:3:6 (one cement, Three sand, and Six hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement concrete 1:2:4 (one cement, Two sand, and Four hard broken stone) Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
Ceilling plastering with CM 1:3 mix using 10mm thick including cost, conveyance and all labour charges etc., completed
Plastering with CM 1:5 mix, 12mm thick including cost, conveyance and all labour charges etc., completed.
Finishing with pressed tiles of size 20x20x2 cm and pointing with cm 1:3 mix using water proof powder including cost and conveyance of all materials and all labour charges etc.,
Gronolithick floor finish floor finish using metal chips including cost and coneyance and all labour charges
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat inculding through scrapping, clean removal of dirt etc
Earth work excavation for foundation in all class of soils except hard rock requiring blasting but shoring shuttering and baling out water wherever necessary and refilling the sides of the foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidated and depositing the surpous earth in all palces shown by the departmental officers with initial lead and lift etc including levelling the site etc., complete with standard specification in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil in foundation.
Supplying andSand filling with M.Sand inculding all cost and conveyance etc complete
Cement concrete 1:4:8 (one cement, five sand, and Ten hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than 15 cms thick compacting etc complete complying with standard specification etc complete.
Cement Concrete 1:3:6 mix Using 40 mm Iss HBG Metal Inculding all charges etc complete
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
Cement Concrete 1:2:4 mix Using 20 mm Iss HBG Metal Inculding all charges etc complete
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S P V CONSTRUCTION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .