Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-Finance | L1 | Accepted-Finance BQR Conditions Satisfied | |
| 2 | L2₹5.6 L+₹51,950 (10.2%)Accepted-Finance | L2 | Accepted-Finance BQR Conditions Satisfied | |
| 3 | Not Admitted-Fee/PreQual/Technical 1A EAST STREET CHIDAMBARANAGAR THOOTHUKUDI THOOTHUKUDI TAMIL NADU TN 628008 | TUTICORIN | TAMIL NADU | 628008 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.7 L
EMD Value
₹4,700
Closing Date
12 Oct 2021, 2:00 pmClosed
Superintending Engineer Operation,TTPS
Office of the Superintending Engineer Operation, TTPS, Tuticorin-628 004
TTPS Operation Circle CAD Unit I II III Upkeepment and operation of storm water treatment plant equipments for the period from the date of entrusting the work upto 31.03.2022
2021_EB_211421_1
CE/SE/O/TTPS/Spec.No.195/21-22
Open Tender
Miscellaneous Works
Item Rate
175 days
TTPS
As per BQR Conditions said in NIT
5 documents required · 5 mandatory
₹0
₹4,700
18 Oct 2021
5 Oct 2021
13 Oct 2021
5 Oct 2021
12 Oct 2021
5 Oct 2021
Charges for Operation of storm water pumps and sewage water treatment pumps & equipments like sewage water pump, cage rotor, sludge water pump, treated water pump, aerator, pressure sand filter, carbon filter, ozone air filter and back washing of filters at the time of morning and evening day / Operation including the hire charges for complete cleaning of all equipments, pump gland tightness checking, leak arresting, checking of tightness of bolt & nuts and line joints, cleaning and checking of water lubricating system in storm water pump and attending minor repair works and cleaning work of TWS if any in the CWPH equipments as per the instruction of site engineer charge.
Charges for erecting the fabricated filter structure inside the well at west corner of storm water pump in well and providing pond around the filter structure and installing 30 KW dewatering pump inside the filter structure, spared by board at free of cost and dewatering the sump. After dewatering the sump removal of silt in around the area of storm water pump suction chamber of 3 pumps. Transporting and unloading the removed silt to the dumping yard near reject and coal stone yard adjacent to the west of the compound, scrapping the side wall and removal of sediments and waste materials in storm water pump well.
S.MURUGESAN
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .