Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400010 | Admitted-Finance |
| 2 | Admitted-Finance RASHTRIYA CHEMICALS AND FERTILIZERS LIMITED TROMBAY FACTORY CHEMBUR MUMBAI 400074 | MUMBAI SUBURBAN | MAHARASHTRA | 400074 | Admitted-Finance |
| 3 | Admitted-Finance DAMODAR PATIL HOUSE VASHI VILLAGE OPP MYSORE COLONY NEAR RCF FACTORY GATE NO 2 CHEMBUR MUMBAI MAHARASHTRA 400074 | MUMBAI SUBURBAN | MAHARASHTRA | 400074 | Admitted-Finance |
Tender Value
₹8 L
Closing Date
3 Jul 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sr. Manager (Civil)
10th Floor, Priyadarshini, Eastern Express Highway, Sion, Mumbai-400022
Miscellaneous Civil jobs related to site development of NU plant Project, inside RCF Trombay Factory, Chembur, Mumbai- 74
2023_RCFL_758261_1
RCF/corporate/NU/Misc civil/2023/02
Open Tender
Civil Works
Works
120 days
Chembur Mumbai
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
3 Aug 2023
19 Jun 2023
3 Jul 2023
19 Jun 2023
3 Jul 2023
19 Jun 2023
ITEM No. 1(a) All the items of MCGM, Unified Schedule of rates (USR) -2023 for common and Building construction works including general notes, list of approved bldg. material etc. Note: Percentage applicable as per Work Order will be added/deducted, on MCGM USR 2023 rate of item. ITEM No. 1(b) Supply of labour ( Semi Skilled /Unskilled) with tools and tackles.(For unmeasurable work and for the work which are not mentioned in MCGM USR-2023). Rate shall be for 8 Hrs. Shift. Note:- Rate shall be paid as per prevailing Minimum Wages (as per HR Circular issued / revisions) + 25% of Minimum wages. Then on this rate, percentage applicable as per Work Order will be added/deducted. ( Unit per shift) ITEM No. 1(c) In case of executing of items of work not included in the MCGM USR 2023, then payment for such work shall be paid as per Basic material cost ( excluding taxes) brought from the Open Market plus 35% for transportation, fixing of the material and complete the job. Then on this rate, percentage applicable as per Work Order will be added/deducted. Contractor shall take written approval from Engineer In-charge (EIC) of RCF, prior to execution of the work (Unit: Per Job)
SADIYA ENTERPRISES
Vaishnav Construction
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .