| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹32.8 L+₹26,750 (0.82%)Admitted-Finance 81 MRIDULA BHAWAN CHATRIBARI GUWAHATI 700001 ASSAM | KOLKATA | WEST BENGAL | 700001 | L2 | Admitted-Finance | |
| 3 | L3₹48.5 L+₹16.0 L (49.2%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Rejected-Technical NEW DELHI | - | Rejected-Technical Technicaly disqualified |
| Sl No | Description | Qty | Unit | Das Consultancy And Agency Services L2 | Madheshiya Marines L1 | M/S B.K ASSOCIATES L3 |
|---|---|---|---|---|---|---|
| 1.00FJB-IV | ||||||
| 1.01 | Cropping & renewal of damaged checker plate, deck plates , side plates, side fenders, david bracket, inside manhole along with other fitment to be done with existing thickness of the plate and inspection of all tanks for damaged platings same to be replaced with existing thickness of the plate as required as per direction EIC/ Surveyor. | 500 | KG | 200 ₹1,00,000 | 140 ₹70,000 | 80 ₹40,000 Lowest |
| 2.00 | All tank (5 nos.) air vent flap and 05 nos. tank air vent pipe missing/ damaged the same has to be rectified/restored as required as per direction of EIC/Surveyor. | 1 | Comp. Job | 20,000 ₹20,000 | 10,000 ₹10,000 Lowest | 30,000 ₹30,000 |
| 3.00(i) All tank manhole found rusting the same has to be chipping and painting, and some manhole rubber found hardend and damaged, the same has to be replace. (ii) Nut bolts to renew with S.S. as required as per direction of EIC/Surveyor. | ||||||
| 3.01 | Labour Charges | 1 | Comp. Job | 15,000 ₹15,000 | 10,000 ₹10,000 Lowest | 1,50,000 ₹1,50,000 |
| 3.02Cost of spares/material(Actual +10%) | ||||||
| 4.00(i) Servicing of both side (forward and aft) anchor windlass (ii) Chain cable found rusted/ jammed and nonoperational, the same to be rectify and make operational as per direction of EIC/ Surveyor. | ||||||
| 4.01 | Labour Charges | 1 | Comp. Job | 10,000 ₹10,000 Lowest | 50,000 ₹50,000 | 30,000 ₹30,000 |
| 4.02Cost of spares/material(Actual +10%) | ||||||
| 5.00 | Manufacturing of 10 nos hook support to tie up truck tyre fender on both side of deck and installation of 10 nos truck tyre fender along with bull dog clamp and wire rope as required as per direction of EIC/Surveyor. | 10 | Comp. Job | 6,000 ₹60,000 | 800 ₹8,000 Lowest | 5,000 ₹50,000 |
Tender Value
₹46.5 L
EMD Value
₹93,000
Closing Date
29 Aug 2025, 11:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Director
IWAI, Pandu Port Complex, Pandu, Guwahati-12
Annual Afloat Repair of FJB-IV, FJB-X, FJB-XII, FJG-XV, CPB-V for the year 2025-26
2025_IWAI_872373_2
IWAI/GHY/FJB-II/4(24)/2025-26
Open Tender
Marine Works
Works
45 days
Guwahati (NW-2)
As per tender document
2 documents required · 2 mandatory
₹5,900
Yes
IWAI FUND PLAN
₹93,000
Yes
20 Sept 2025
7 Aug 2025
30 Aug 2025
8 Aug 2025
29 Aug 2025
8 Aug 2025
Amount
FJB-IV
Cropping & renewal of damaged checker plate, deck plates , side plates, side fenders, david bracket, inside manhole along with other fitment to be done with existing thickness of the plate and inspection of all tanks for damaged platings same to be replaced with existing thickness of the plate as required as per direction EIC/ Surveyor.
All tank (5 nos.) air vent flap and 05 nos. tank air vent pipe missing/ damaged the same has to be rectified/restored as required as per direction of EIC/Surveyor.
(i) All tank manhole found rusting the same has to be chipping and painting, and some manhole rubber found hardend and damaged, the same has to be replace. (ii) Nut bolts to renew with S.S. as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
(i) Servicing of both side (forward and aft) anchor windlass (ii) Chain cable found rusted/ jammed and nonoperational, the same to be rectify and make operational as per direction of EIC/ Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Manufacturing of 10 nos hook support to tie up truck tyre fender on both side of deck and installation of 10 nos truck tyre fender along with bull dog clamp and wire rope as required as per direction of EIC/Surveyor.
Servicing of Two (2) hand operated davit to operate requisite load with renewal of wire rope and checking of pulley as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Works as per site and crew requirement :- a) Crew accomodation window is damaged, same to be repaired. b) Interior of the crew cabin needed to be insulated to restrain transfer of excessive heat during summer with materials like i) Particle board(8'x4')- 14 nos., ii) Glass wool (2" thk)- 1no., iii) Door-1no., iv) Chicken net- 1 roll, v) Mosquito net (35 sqft)-1no., vi) Wood - (3"x1") - 6' - 3nos. vii) Wood(2"x1")= 7'-20nos., 10'-10nos., 13'- 10nos., 3'-14nos. viii) Wood-(2"x2")- 9'- 2nos. ix) Wood-(3"x2.5") - 6'- 2nos., 2.5' - 2nos. x) Wood Corner Bead - (1.5"x1.5")- 50 feet, xi) Wood Liping Bead- (1.5"x1/4") - 50 feet, xii) Plywood 12mm(7'x3')- 2nos. c) Necessary carpentry, repairing, curtain & upkeeping works to be done in window, bed, cooking table, bench, and rake etc at accommodation cabin as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Construction of Canopy (12 m x 5.5 m) along with all necessary arrangement including labor charges as per following requirement 1. Steel Post (3 x 2.5) -.4Pcs 2.Steel Post ( 3 x 3 ) - 4 Pcs 3.Purline ( 1.5 x 1 .5) - 32 Pcs 4.Roofing Sheet - LS 5.Other Fittings and accessories, (color etc.)as required as per direction of EIC/surveyor.
Installation of attach bathroom cum toilet with proper drainage/discharge system, overhead tank, pipe line connection, commode, wash basin, tap, shower, flush tank, door, latch, valves, flushing tank pipe, mirror, towel rod, hook hanger, soap stand, water jet, discharge strainer and fitments etc by plate cutting and welding as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Chipping, wire brushing and cleaning inside of tanks and space with all interior item like angle & frame etc. to be done with one coat of primer followed by two coats of existing color anti- corrosive marine, as required as per direction of EIC /Surveyor.
Repair of anchor forward (Port & Stbd.) spurling pipe by gas cutting and welding etc as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
One(1) air vent pipe damaged the same has to be rectified/restored and installation of all tank's air vent flap as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
One(1) manhole cover handle found broken the same has to be installed. Replacement of manhole gaskets and nut bolts with S.S. as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Servicing of Two (2) hand operated winches with davit to operate requisite with renewal of wire rope and checking of pulley load as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Main deck plating observed rusting in way of anchor windlass (Fwd & Aft) seat, the same has to be renewed as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Works as per site and crew requirement :- Construction of Canopy (12 m x 5.5 m) along with all necessary arrangement including labor charges as per following requirement 1. Steel Post (3 x 2.5) -.4Pcs 2.Steel Post ( 3 x 3 ) - 4 Pcs 3.Purline ( 1.5 x 1 .5) - 32 Pcs 4.Roofing Sheet - LS 5.Other Fittings and accessories,(color etc.)as required as per direction of EIC/surveyor.
Installation of attach bathroom cum toilet with proper drainage/discharge system, overhead tank, pipe line connection, commode, wash basin, tap, shower, flush tank, door, latch, valves, flushing tank pipe, mirror, towel rod, hook hanger, soap stand, water jet, discharge strainer and fitments etc by plate cutting and welding as required as per direction of EIC/Surveyor.
Chipping, wire brushing and cleaning inside of all man hole/ bulkhead tank with all interior item like angle & frame etc. to be done with one coat of zinc chromate yellow primer followed by two coats of existing colour anti corrosive marine standard, as required as per direction of EIC/Surveyor.
Installation of truck tyres fender with bull dog clamp and wire rope as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Checking of entire solar system and requisite items should be rectified/renewed and upgraded as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Necessary carpentry, repairing, curtain & upkeeping works to be done in window, bed, cooking table, bench, and rake etc at accommodation cabin & operator cabin as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Installation of tailpost(solid long rod) with proper corrosion paint and handles for stability of pontoon or to avoid grounding as required as per direction of EIC/Surveyor.
FJB-XII
Cropping & renewal of damaged checker plate, deck plates, side plates, side fenders, inside manhole along with other fitment to be done with existing thickness of the plate and inspection of all tanks for damaged platings same to be replaced with existing thickness of the plate as required as per direction EIC/ Surveyor.
All tank (5 nos.) air vent flap found rusted and 02 nos Sounding pipe damage/missing the same has to be rectified/restored as required as per direction of EIC/Surveyor.
(i) Servicing of both side (forward and aft) anchor windlass (ii) Chain cable found rusted/ jammed and nonoperational, the same to be rectify and make operational as per direction of EIC/ Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Both Fwd & Aft windlass spurling pipe mouth closed with plate the same to be rectify and make operational as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Manufacturing of 10 nos hook support to tie up truck tyre fender on both side of deck and installation of 10 nos truck tyre fender along with bull dog clamp and wire rope as required as per direction of EIC/Surveyor.
Servicing of Two (2) hand operated davit to operate requisite load with renewal of wire rope and checking of pulley as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Works as per site and crew requirement :- Construction of Canopy (12 m x 5.5 m) along with all necessary arrangement including labor charges as per following requirement 1. Steel Post (3 x 2.5) -.4Pcs 2.Steel Post ( 3 x 3 ) - 4 Pcs 3.Purline ( 1.5 x 1 .5) - 32 Pcs 4.Roofing Sheet - LS 5.Other Fittings and accessories,(color etc.)as required as per direction of EIC/surveyor.
Installation of attach bathroom cum toilet with proper drainage/discharge system, overhead tank, pipe line connection, commode, wash basin, tap, shower, flush tank, door, latch, valves, flushing tank pipe, mirror, towel rod, hook hanger, soap stand, water jet, discharge strainer and fitments etc by plate cutting and welding as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Chipping, wire brushing and cleaning inside of tanks and space with all interior item like angle & frame etc. to be done with one coat of primer followed by two coats of existing color anti- corrosive marine, as required as per direction of EIC /Surveyor.
i) Interior of the crew cabin needed to be insulated to restrain transfer of excessive heat during summer with materials like i) Particle board(8'x4')- 14 nos., ii) Glass wool (2" thk)- 1no., iii) Door-1no., iv) Chicken net- 1 roll, v) Mosquito net (35 sqft)-1no., vi) Wood - (3"x1") - 6' - 3nos. vii) Wood(2"x1")= 7'-20nos., 10'-10nos., 13'- 10nos., 3'-14nos. viii) Wood-(2"x2")- 9'- 2nos. ix) Wood-(3"x2.5") - 6'- 2nos., 2.5' - 2nos. x) Wood Corner Bead - (1.5"x1.5")- 50 feet, xi) Wood Liping Bead- (1.5"x1/4") - 50 feet, xii) Plywood 12mm(7'x3')- 2nos. xiii) Necessary carpentry, repairing, curtain & upkeeping works to be done in window, bed, cooking table, bench, and rake etc at accommodation cabin as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
FJG-XV
Main deck plating observed rusting in way of anchor windlass (Fwd & Aft) seat, the same has to be repaired/rectified as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
All tank's air vent flap found rusted and corroded same has to rectified/renewed. Replacement of manhole gaskets and nut bolts with S.S. as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Installation of attach bathroom cum toilet with proper drainage/discharge system, overhead tank, pipe line connection, commode, wash basin, tap, shower, flush tank, door, latch, valves, flushing tank pipe, mirror, towel rod, hook hanger, soap stand, water jet, discharge strainer and fitments etc by plate cutting and welding as required as per direction of EIC/Surveyor.
In way of toilet seating arrangement main deck plating has rusted the same has to repaired/rectified as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
One(1) nos. sounding pipe near pontoon crew accommodation found damage/broken. One(1) nos. tank sounding pipe not provided/missing. Both has to be rectified/renewed as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Installation of truck tyres fender with bull dog clamp and wire rope as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Servicing of Two (2) hand operated winches with davit by renewal of wire rope and checking of pulley to handle/operate requisite load as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Works as per site and crew requirement :- Construction of Canopy (12 m x 5.5 m) along with all necessary arrangement including labor charges as per following requirement 1. Steel Post (3 x 2.5) -.4Pcs 2.Steel Post ( 3 x 3 ) - 4 Pcs 3.Purline ( 1.5 x 1 .5) - 32 Pcs 4.Roofing Sheet - LS 5.Other Fittings and accessories,(color etc.)as required as per direction of EIC/surveyor.
Chipping, wire brushing and cleaning inside of all man hole/ bulkhead tank with all interior item like angle & frame etc. to be done with one coat of zinc chromate yellow primer followed by two coats of existing colour anti corrosive marine standard, as required as per direction of EIC/Surveyor.
Checking of entire solar system and requisite items should be rectified/renewed and upgraded as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Necessary carpentry, repairing, curtain & upkeeping works to be done in window, bed, cooking table, bench, and rake etc at accommodation cabin & operator cabin as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Installation of tailpost (solid long rod) with proper corrosion paint and handles for stability of pontoon or to avoid grounding as required as per direction of EIC/Surveyor.
Main deck plating observed rusted/corroded at aft side 03 nos. (P&S); the same to be cropped & renewed along with other fitment. Other damaged plate,steel curved fender in entire vessels to be checked and renew if needed with existing thickness as required as per direction of EIC/Surveyor.
All tank air vent flap and 05 nos. tank air vent pipe broken/damage, the same has to be rectified/restored as required as per direction of EIC/Surveyor.
(i) All tank manhole cover rubber found hardend and damaged, the same has to be replace. (ii) 03 nos. manhole cover all stud missing the same and other manhole's nut bolt to renew with S.S. as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Servicing of both side hand operated anchor windlass (forward and aft) with repair/renewal of ferule and PB Bush for smooth movement of gear as required. Checking & repair of driving gear unit including calibration & painting of chains as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Making of 18 nos hook support to tie up SUV tyre fender on both side of deck and installation of 18 nos SUV tyre fender along with bull dog clamp and wire rope as required as per direction of EIC/Surveyor.
Servicing of Two (2) hand operated winches with davit to operate requisite load with renewal of wire rope and checking of pulley as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Checking of entire solar system and requisite items should be rectified/renewed and upgraded as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Works as per site and crew requirement :- Installation of attach bathroom cum toilet with proper drainage/discharge system, overhead tank, pipe line connection, commode, wash basin, tap, shower, flush tank, door, latch, valves, flushing tank pipe, mirror, towel rod, hook hanger, soap stand, water jet, discharge strainer and fitments etc by plate cutting and welding as required as per direction of EIC/Surveyor.
i) Interior of the crew cabin needed to be insulated to restrain transfer of excessive heat during summer with materials like i) Particle board(8'x4')- 14 nos., ii) Glass wool (2" thk)- 1no., iii) Door-1no., iv) Chicken net- 1 roll, v) Mosquito net (35 sqft)-1no., vi) Wood - (3"x1") - 6' - 3nos. vii) Wood(2"x1")= 7'-20nos., 10'-10nos., 13'- 10nos., 3'-14nos. viii) Wood-(2"x2")- 9'- 2nos. ix) Wood-(3"x2.5") - 6'- 2nos., 2.5' - 2nos. x) Wood Corner Bead - (1.5"x1.5")- 50 feet, xi) Wood Liping Bead- (1.5"x1/4") - 50 feet, xii) Plywood 12mm(7'x3')- 2nos. xiii) Necessary carpentry, repairing, curtain & upkeeping works to be done in window, bed, cooking table, bench, and rake etc at accommodation cabin as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Das Consultancy And Agency Services (BID ID -3274264)
M/S B.K ASSOCIATES (BID ID -3274306)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .