Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 CrAccepted-AOC | ₹4.9 Cr | L1 | Accepted-AOC 1st Lowest |
| 2 | L2₹5.0 Cr+₹9.4 L (1.93%)Rejected-AOC PLOT NO 219 TOP FLOOR INDUSTRIAL AREA PHASE 1 PANCHKULA HARYANA | PANCHKULA | PANCHKULA | HARYANA | ₹5.0 Cr+₹9.4 L (1.93%) | L2 | Rejected-AOC 2nd Lowest |
| 3 | L3₹5.0 Cr+₹14.7 L (3.01%)Rejected-AOC | ₹5.0 Cr+₹14.7 L (3.01%) | L3 | Rejected-AOC 3rd Lowest |
| 4 | L4₹5.2 Cr+₹34.1 L (6.98%)Rejected-AOC | ₹5.2 Cr+₹34.1 L (6.98%) | L4 | Rejected-AOC 4th Lowest |
| 5 | L5₹5.2 Cr+₹35.4 L (7.25%)Rejected-AOC | ₹5.2 Cr+₹35.4 L (7.25%) | L5 | Rejected-AOC 5th Lowest |
Tender Value
₹5.3 Cr
EMD Value
₹10.6 L
Closing Date
24 Oct 2024, 3:00 pmClosed
SHAMSHER SINGH DHILLON
HSVP DIV 1 Sec 8 Panchkula
Construction of First Floor and allied works Govt. Senior Sec. School at Sector 19 Panchkula including mtc. and defect liability period of three years free of cost.
2024_HBC_404824_1
2024141D8D2E 070D 4963 91A4 F42BA3F9C886269HSV
Open Tender
Civil Works
Works
360 days
Panchkula
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Yes
₹10.6 L
Yes
16 Dec 2024
16 Oct 2024
25 Oct 2024
16 Oct 2024
24 Oct 2024
16 Oct 2024
16 Oct 2024 - 24 Oct 2024
eProcurement System Government of Haryana Created By: Shamsher Singh Created Date/Time: 13-Nov-2024 11:06 AM Tender Title: Construction of First Floor and allied works Govt. Senior Sec. School at Sector 19 Panchkula including mtc. and defect liability period of three years free of cost. Tender ID: 2024_HBC_404824_1
Tender Inviting Authority:
Name of Work:Construction of First Floor and allied works Govt. Sen Sec. School at Sector-19 Panchkula including mtc. and defect liability period of three years free of cost.
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 Shiv Bhagwan Khowala (GSTN-06CLPPK2724M1ZP) BID ID -1153508 52900568.850 -1.330 52196991.284 Five Crore Twenty One Lakh Ninty Six Thousand Nine Hundred and Ninty One
2.00 ESS AAR BUILDERS (GSTN-06AABFE6090K1ZC) BID ID -1155960 52900568.850 -7.770 48790194.650 Four Crore Eighty Seven Lakh Ninty Thousand One Hundred and Ninty Four
3.00 A T CONSTRUCTION (GSTN-06AAYFA1425D1ZN) BID ID -1156166 52900568.850 -5.990 49731824.776 Four Crore Ninty Seven Lakh Thirty One Thousand Eight Hundred and Twenty Four
4.00 Gupta and Company (GSTN-06AFHPG6094G1ZE) BID ID -1156355 52900568.850 -1.080 52329242.706 Five Crore Twenty Three Lakh Twenty Nine Thousand Two Hundred and Fourty Two
5.00 Bazad constructions (GSTN-NA) BID ID -1156404 52900568.850 -4.990 50260830.464 Five Crore Two Lakh Sixty Thousand Eight Hundred and Thirty
6.00 Shiv Shakti Industries (GSTN-NA) BID ID -1156692 52900568.850 7.590 56915722.026 Five Crore Sixty Nine Lakh Fifteen Thousand Seven Hundred and Twenty Two
Lowest Amount Quoted BY: ESS AAR BUILDERS(48790194.650)
BOQ Summary Details Tender Title: Construction of First Floor and allied works Govt. Senior Sec. School at Sector 19 Panchkula including mtc. and defect liability period of three years free of cost. Tender ID: 2024_HBC_404824_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 ESS AAR BUILDERS (BID ID -1155960) 48790194.650 L1
2 A T CONSTRUCTION (BID ID -1156166) 49731824.776 L2
3 Bazad constructions (BID ID -1156404) 50260830.464 L3
4 Shiv Bhagwan Khowala (BID ID -1153508) 52196991.284 L4
5 Gupta and Company (BID ID -1156355) 52329242.706 L5
6 Shiv Shakti Industries (BID ID -1156692) 56915722.026 L6
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .