Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
10 Nov 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manoj Kumar
Municipal Council Palwal
Const. of Hall in Badha Mohalla Ward No.20 MC Palwal
2025_HRY_468407_3
2025/MCPALWAL/DPLAN/6
Open Tender
Civil Works
Tender
90 days
Palwal
2 documents required · 2 mandatory
₹1,000
₹30,000
30 Oct 2025
30 Oct 2025
10 Nov 2025
30 Oct 2025
10 Nov 2025
30 Oct 2025
HSR Item 15.1.1.1-Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications Ordinary soil 1.1. Manual Means Depth up to 3 m HSR Rate(Rs.) 154.00 Through Rate
HSR Item 6.1.6-Cement Concrete 1:4:8 Flooring 2. Cement Concrete 1:4:8 with stone aggregate 40 mm size in foundation and plinth. HSR Rate(Rs.) 2434.00 Through Rate
HSR Item 6.1.2-Cement Concrete 1:2:4 HSR Rate(Rs.) 3476.00 Through Rate
HSR Item 6.14.1-Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone- III): 3 graded stone aggregate 20 mm nominal size) HSR Rate(Rs.) 4374.00 Through Rate
HSR Item 6.15.1-Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone- III) : 3 graded stone aggregate 20 mm nominal size) HSR Rate(Rs.) 5969.00 Through Rate
HSR Item 6.16-Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). HSR Rate(Rs.) 6113.00 Through Rate
HSR Item 6.33.3-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps.Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars HSR Rate(Rs.) 68.00 Through Rate
HSR Item 6.30.6-Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and Struts HSR Rate(Rs.) 262.00 Through Rate
HSR Item 6.30.5-Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers HSR Rate(Rs.) 296.00 Through Rate
HSR Item 6.30.3-Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform HSR Rate(Rs.) 208.00 Through Rate
HSR Item 7.20.1-Brick work with common burnt clay non- modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) HSR Rate(Rs.) 4287.00 Through Rate
HSR Item 6.8.1-Providing and laying damp-proof course with cement concrete 1:1.5:3 (1 cement : 1.5coarse sand (zone- III): 3 graded stone aggregate 20mm nominal size) 1. 50 mm thick HSR Rate(Rs.) 202.00 Through Rate
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_558535.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .