Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC 40 E SUNDARAVELPURAM 7TH STREET TUTICORIN 628 002 | TUTICORIN | TAMIL NADU | 628002 | ₹8.8 L Quoted ₹10.3 L | L1 | Accepted-AOC Work was Awarded |
| 2 | L2₹10.9 LRejected-AOC | ₹10.9 L | L2 | Rejected-AOC Work was Not Awarded |
| Sl No | Description | Qty | Unit | S. MURUGAN CONTRACTOR L1 | RAYAN AND COMPANY L2 |
|---|---|---|---|---|---|
| 1.00 | Testing and checking the healthiness of electronic controller as well as control panel when the Precipitator voltage not developed or goes down to under voltage in ESP IV & V. Trouble shooting of problem / faults arised in the control panel. Replacement of controller, firing cards or any other components in the control panel if required / necessary. | 48 | Nos | 2,27,184 ₹2.7 L | 2,44,800 ₹2.9 L |
| 2.00 | Testing and checking the healthiness of high voltage rectifier Transformer when the Precipitator voltage not developed or goes down to under voltage and other allied works in ESP IV & V. | 28 | Nos | 1,32,524 ₹1.6 L | 1,42,800 ₹1.7 L |
| 3.00 | Attending Minor repairs on heaters, rapping motors, checking auto/manual operation of rapping System etc, in ESP-IV & V | 72 | Nos | 3,40,776 ₹4.0 L | 3,67,200 ₹4.3 L |
| 4.00 | Oil draining and topping up and testing of oil BDV of HVR transformer etc | 8 | Nos | 88,224 ₹1.0 L | 91,600 ₹1.1 L |
| 5.00 | Dismantling, fault attending and assembling of HVR Transformer including cost of consumables | 8 | Nos | 1,73,360 ₹2.0 L | 1,76,000 ₹2.1 L |
| 6.00 | Transporting of New Transformer oil From packet store or Central store to 24 meter of ESP IV&V and Transporting of Dirty Transformer oil From 24 meter top floor to central store. | 8 | Nos | 66,904 ₹78,946.72 | 71,600 ₹84,488 |
Tender Value
Refer Docs
EMD Value
₹9,300
Closing Date
2 Jan 2026, 9:00 amClosed
CE/TTPS
Chief Engineer Tuticorin Thermal Power Station-Tuticorin
TTPS ES Circle EM III Attending Minor repair works Testing and checking the healthiness of electronic controller control panel High Voltage Rectifier transformers heaters rapping motors attending the defects of High voltage rectifier transformer
2025_EB_633611_1
CE/SE/ES/TTPS/No.57/2026-27
Open Tender
Electrical and Maintenance Works
365 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹9,300
Yes
23 Mar 2026
17 Dec 2025
3 Jan 2026
17 Dec 2025
2 Jan 2026
17 Dec 2025
Testing and checking the healthiness of electronic controller as well as control panel when the Precipitator voltage not developed or goes down to under voltage in ESP IV & V. Trouble shooting of problem / faults arised in the control panel. Replacement of controller, firing cards or any other components in the control panel if required / necessary.
Testing and checking the healthiness of high voltage rectifier Transformer when the Precipitator voltage not developed or goes down to under voltage and other allied works in ESP IV & V.
Attending Minor repairs on heaters, rapping motors, checking auto/manual operation of rapping System etc, in ESP-IV & V
Oil draining and topping up and testing of oil BDV of HVR transformer etc
Dismantling, fault attending and assembling of HVR Transformer including cost of consumables
Transporting of New Transformer oil From packet store or Central store to 24 meter of ESP IV&V and Transporting of Dirty Transformer oil From 24 meter top floor to central store.
RAYAN AND COMPANY (BID ID -1539396)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_758049.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid