Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAdmitted-Finance | ₹14.5 L | L1 | Admitted-Finance |
| 2 | L2₹16.3 L+₹1.8 L (12.4%)Admitted-Finance | ₹16.3 L+₹1.8 L (12.4%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
| Sl No | Description | Qty | Unit | RELIABLE THERMAL ENGINEERS L2 | ASHA MUKUND VICHARE L1 |
|---|---|---|---|---|---|
| 1.00Supply and Installation, Commissioning, Testing of Boiler 1 MT | |||||
| 1.01 | Steam Boiler – 1000kg /hr
Type Of Boiler: 3 PASS Horizontal Fully Wet Back Steam Boiler
Design & Fabrication: IBR 1950 With Latest Amendments
Model: Ecomax 100
Fuel: Agrowaste
Steam Pressure: 10.54 Kg/cm2
Steam Quality: Dry Saturated
Steam Temperature: 185 Deg C
Thermal Efficiency: 78% + (- 2)%
Heat Transfer Area: 40m2
Grate Area: 1.2m2
Water Holdup Capacity: 4300 Liters
Steam Space: 500 Liters
MOC
Shell: IBR 1950 With Latest Amendment
Shell Thk: 10mm Thickness
Tubes BS 3059:1987 PT1 ERW 320
WATER PUMP DETAILS :
Type Of Pump: Vertical Multistage Centrifugal Pump
Make: CNP Pumps
Capacity: 1.2m3/hr
Head: 130M
Motor Drive: 2900 RPM/50Hz/415V/3 Phase
Pump Quantity: 2 Nos
Cyclone Seperator : 01 Nos | 1 | Nos | 9,30,164 ₹9,30,164 | 8,30,000 ₹8,30,000 Lowest |
| 1.02 | Ducting
Boiler to Cyclone
Cyclone to ID Fan
ID Fan to Chimney | 1 | Set | 70,000 ₹70,000 | 45,000 ₹45,000 Lowest |
| 1.03 | MS Chimney
40 Feet Height, Bottom Dia 350mm Dia | 1 | Set | 90,000 ₹90,000 | 80,000 ₹80,000 Lowest |
| 1.04 | Feed Piping
Water Tank to Boiler Feed Pump Piping With Valve | 1 | Set | 15,000 ₹15,000 Lowest | 15,000 ₹15,000 Lowest |
| 1.05 | IBR Piping
Steam Pipeline 50 NB Approx 18 Mtr
Blow Down Pipeline 25 NB Approx 24 Mtr | 1 | Set | 1,50,000 ₹1,50,000 Lowest | 1,50,000 ₹1,50,000 Lowest |
| 1.06 | PRS Station
PRS Station 50 NB x 65 NB
Pressure Reduce From 14 Kg/cm2 to 3.5 Kg/cm2
Pressure Inlet 50 NB
Pressure Outlet 65 NB | 1 | Set | 1,00,000 ₹1,00,000 | 80,000 ₹80,000 Lowest |
| 1.07 | PRS Outlet to Production PipeLine Work
PRS Outlet to Production Pipeline 65 NB Approx 100 Feet | 1 | Set | 50,000 ₹50,000 Lowest | 50,000 ₹50,000 Lowest |
| 1.08 | Boiler IBR Registration
Boiler Fees Challan
Provisional Drawing
IBR Inspector visit arrange to Site Inspection | 1 | Lumpsum | 80,000 ₹80,000 Lowest | 80,000 ₹80,000 Lowest |
| 1.09 | Trap Station
Bend, Flanges, Supports & Fittings | 1 | Set | 20,000 ₹20,000 Lowest | 20,000 ₹20,000 Lowest |
Tender Value
Refer Docs
Closing Date
10 Aug 2026, 11:00 amClosed
Mrs. Pranoti Sagar Patil
A P. Nigave Dumala, Tal. Karveer Dist Kolhapur416229 Contact 9923674005
Supply and Installation Commissioning Testing of Boiler 1 MT
2026_DOAWB_1322470_1
SMART/KOP/KU/GOODS/96/2026
Open Tender
Electrical Goods
Item Rate
180 days
Gat No. 25 4 4 A Bhuyewadi Tal. Karveer
As per tender documents
2 documents required · 2 mandatory
₹500
Exempted
District Implementation Unit DIU SMART Kolhapur
21 Sept 2026
31 Jul 2026
11 Aug 2026
31 Jul 2026
10 Aug 2026
31 Jul 2026
31 Jul 2026 - 3 Aug 2026
3 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply and Installation, Commissioning, Testing of Boiler 1 MT | |||||
| 1.01 | Steam Boiler – 1000kg /hr
Type Of Boiler: 3 PASS Horizontal Fully Wet Back Steam Boiler
Design & Fabrication: IBR 1950 With Latest Amendments
Model: Ecomax 100
Fuel: Agrowaste
Steam Pressure: 10.54 Kg/cm2
Steam Quality: Dry Saturated
Steam Temperature: 185 Deg C
Thermal Efficiency: 78% + (- 2)%
Heat Transfer Area: 40m2
Grate Area: 1.2m2
Water Holdup Capacity: 4300 Liters
Steam Space: 500 Liters
MOC
Shell: IBR 1950 With Latest Amendment
Shell Thk: 10mm Thickness
Tubes BS 3059:1987 PT1 ERW 320
WATER PUMP DETAILS :
Type Of Pump: Vertical Multistage Centrifugal Pump
Make: CNP Pumps
Capacity: 1.2m3/hr
Head: 130M
Motor Drive: 2900 RPM/50Hz/415V/3 Phase
Pump Quantity: 2 Nos
Cyclone Seperator : 01 Nos | - | Nos | 100 | - |
| 1.02 | Ducting
Boiler to Cyclone
Cyclone to ID Fan
ID Fan to Chimney | - | Set | 100 | - |
| 1.03 | MS Chimney
40 Feet Height, Bottom Dia 350mm Dia | - | Set | 100 | - |
| 1.04 | Feed Piping
Water Tank to Boiler Feed Pump Piping With Valve | - | Set | 100 | - |
| 1.05 | IBR Piping
Steam Pipeline 50 NB Approx 18 Mtr
Blow Down Pipeline 25 NB Approx 24 Mtr | - | Set | 100 | - |
| 1.06 | PRS Station
PRS Station 50 NB x 65 NB
Pressure Reduce From 14 Kg/cm2 to 3.5 Kg/cm2
Pressure Inlet 50 NB
Pressure Outlet 65 NB | - | Set | 100 | - |
| 1.07 | PRS Outlet to Production PipeLine Work
PRS Outlet to Production Pipeline 65 NB Approx 100 Feet | - | Set | 100 | - |
| 1.08 | Boiler IBR Registration
Boiler Fees Challan
Provisional Drawing
IBR Inspector visit arrange to Site Inspection | - | Lumpsum | 100 | - |
| 1.09 | Trap Station
Bend, Flanges, Supports & Fittings | - | Set | 100 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Krushiboilertenderdocuments.pdf
Tender Documents • 1.38 MB
BOQ_2266269.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .