Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.6 LAdmitted-Finance | ₹33.6 L | L1 | Admitted-Finance |
| 2 | L2₹35.8 LAdmitted-Finance | ₹35.8 L | L2 | Admitted-Finance |
| 3 | L3₹42.1 LAdmitted-Finance | ₹42.1 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHRI BALAJI ENTERPRISES L2 | JYOTI CONSTRUCTION INCORPORATION L3 | A Palswamy L1 |
|---|---|---|---|---|---|---|
| 1.00Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. | ||||||
| 1.10 | All kinds of Soil | 915 | sqm | 120 ₹1,09,800 Lowest | 460 ₹4,20,900 | 200 ₹1,83,000 |
| 2.00 | Scarifying metalled (water-bound) road surface including disposal of rubbish, lead upto 50 m and consolidation of the aggregate received from scarifying with power road roller of 8 to 10 tonne capacity | 680.5 | sqm | 200 ₹1,36,100 Lowest | 460 ₹3,13,030 | 200 ₹1,36,100 Lowest |
| 3.00Providing and laying spreading and compacting stone aggregate of specified sizes to WBM specification including spreading in uniforms thickness, hand picking, rolling with 3 wheeled road/ vibratory roller 8-10 tonne in stages to proper grade and camber, applying and brooming requisite type of screening/ binding materials to fill up interestices of coarse aggregate, watering and compacting of the required density. (Rate is inclusive of all materials, labours, machineries etc.) | ||||||
| 3.10 | Sub base with stone aggregate 90 mm to 45 mm including stone screening 13.20 mm | 42.1 | cum | 10,500 ₹4,42,050 Lowest | 10,900 ₹4,58,890 | 12,200 ₹5,13,620 |
| 3.20 | Sub base with stone aggregate 63 mm to 45 mm including stone screening 13.20 mm | 43.16 | cum | 10,500 ₹4,53,180 Lowest | 10,900 ₹4,70,444 | 12,200 ₹5,26,552 |
| 3.30 | Sub base with stone aggregate 53 mm to 22.40 mm including stone screening 11.20 mm | 51.04 | cum | 10,500 ₹5,35,920 Lowest | 10,900 ₹5,56,336 | 12,200 ₹6,22,688 |
| 4.00Providing and laying Bitumen Penetration Macadam with hard stone aggregate of quality, size and grading as specified, with bitumen of suitable penetration grade, including required key aggregate as specified, spreading coarse aggregate with the help of self propelled/ tipper tail mounted aggregate spreader and applying bitumen by a pressure distributor and then spreading key aggregate with the help of aggregate spreader complete, including consolidation with road roller of minimum 8 to 10 tonne capacity to achieve specified values of compaction and surface accuracy : | ||||||
| 4.10 | For 50 mm compacted thickness using coarse aggregate of size 50-20 mm graded @ 0.60 cum per 10 sqm key aggregate of size 12.5 mm graded @ 0.15 cum per 10 sqm. With paving asphalt grade VG - 10 @ 50 kg/ 10 sqm. | 680.5 | sqm | 1,400 ₹9,52,700 | 1,500 ₹10,20,750 | 1,200 ₹8,16,600 Lowest |
| 5.00Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : | ||||||
Tender Value
Refer Docs
EMD Value
₹63,597
Closing Date
25 Jun 2026, 10:00 amClosed
ee/zp/sa
Executive Engineer, Zilla Parishad, South Andaman
repair and maintenance of rural road from main road near power house via late suren roy house to bharat pur beach at shaheed dweep by zilla parishad south andaman
2026_OEEPB_23408_1
EE/ZP/SA/2026-2027/07
Open Tender
Civil Works - Roads
Works
180 days
bharatpur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹63,597
30 Jun 2026
18 Jun 2026
25 Jun 2026
18 Jun 2026
25 Jun 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. | |||||
| 1.1 | All kinds of Soil | - | sqm | - | - |
| 2Scarifying metalled (water-bound) road surface including disposal of rubbish, lead upto 50 m and consolidation of the aggregate received from scarifying with power road roller of 8 to 10 tonne capacity | |||||
| 3Providing and laying spreading and compacting stone aggregate of specified sizes to WBM specification including spreading in uniforms thickness, hand picking, rolling with 3 wheeled road/ vibratory roller 8-10 tonne in stages to proper grade and camber, applying and brooming requisite type of screening/ binding materials to fill up interestices of coarse aggregate, watering and compacting of the required density. (Rate is inclusive of all materials, labours, machineries etc.) | |||||
| 3.1 | Sub base with stone aggregate 90 mm to 45 mm including stone screening 13.20 mm | - | cum | - | - |
| 3.2 | Sub base with stone aggregate 63 mm to 45 mm including stone screening 13.20 mm | 1 | cum | - | - |
| 3.3 | Sub base with stone aggregate 53 mm to 22.40 mm including stone screening 11.20 mm | 1 | cum | - | - |
| 4Providing and laying Bitumen Penetration Macadam with hard stone aggregate of quality, size and grading as specified, with bitumen of suitable penetration grade, including required key aggregate as specified, spreading coarse aggregate with the help of self propelled/ tipper tail mounted aggregate spreader and applying bitumen by a pressure distributor and then spreading key aggregate with the help of aggregate spreader complete, including consolidation with road roller of minimum 8 to 10 tonne capacity to achieve specified values of compaction and surface accuracy : | |||||
| 4.1 | For 50 mm compacted thickness using coarse aggregate of size 50-20 mm graded @ 0.60 cum per 10 sqm key aggregate of size 12.5 mm graded @ 0.15 cum per 10 sqm. With paving asphalt grade VG - 10 @ 50 kg/ 10 sqm. | - | sqm | - | - |
| 5Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
NIT.pdf
Tender Documents • 2.49 MB
BOQ_24819.xls
BOQ • 0.29 MB
corr.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].