Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance | -43.20% | ₹2.6 L | L1 | Admitted-Finance |
| 2 | L2₹2.9 L+₹36,960.44 (14.4%)Admitted-Finance | -35.00% | ₹2.9 L+₹36,960.44 (14.4%) | L2 | Admitted-Finance |
| 3 | L3₹3.4 L+₹79,059.28 (30.9%)Admitted-Finance | -25.66% | ₹3.4 L+₹79,059.28 (30.9%) | L3 | Admitted-Finance |
Tender Value
₹4.5 L
EMD Value
₹13,500
Closing Date
5 Sept 2026, 1:30 pmClosed
DFO Kishtwar
Forest Complex Sarkoot Kishtwar
BOQ
2026_FD_322794_1
45 of 2026
Open Tender
Agricultural or Forestry
Percentage
60 days
Soil Range
SBD
2 documents required · 2 mandatory
₹600
DFO Kishtwar
₹13,500
9 Sept 2026
29 Aug 2026
7 Sept 2026
29 Aug 2026
5 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. | 53.48 | Cum | - | - |
| 2 | Surface dressing of the ground including removing vegetation and in-equalities
not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto
1.5 m in -All kinds of soil. | 334.57 | Sqm | - | - |
| 3 | Dry random rubble masonry with hard stone in foundation and plinth:
7.3.1 With bond stone. Nallah | 25.49 | Cum | 1 | ₹25.46 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 38.23 | Cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size) | 1.79 | Cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 40mm nominal size) Crushed | 2.72 | Cum | - | - |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 4.28 | Cum | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for : foundations, footings, bases of columns, etc. for mass concrete | 52.7 | Sqm | - | - |
| 9 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 705.51 | Kgs | 1 | ₹704.8 |
| 10 | Providing and fixing of Green Shade net as per desired by site incharge | 2,480 | Sft | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_1084172.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .