| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹4.1 L+₹17,790.01 (4.53%)Admitted-Fee/PreQual/Technical/Finance R O BAGHJOGI LANKER RAINAWARI SRINAGAR | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹4.1 L+₹20,968.49 (5.34%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹4.7 L+₹75,821.01 (19.3%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹4.7 L+₹78,489.51 (20.0%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.9 L
EMD Value
₹17,790
Closing Date
14 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
DEV. OF EIDGAH MANZNOO NAMBAL B BLOCK KPORA
2026_RDPR_315182_3
ENIT53of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹17,790
15 Jul 2026
8 Jul 2026
15 Jul 2026
8 Jul 2026
14 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site clearance by the way of engagement of labors including surface excavation and removal of shrubs hurbs etc. | - | lab | - | - |
| 0.0 | Providing and laying RCC of specified grade Of 1:2:4 mix ( 1 cement : 2 coarse sand : 4 graded stone agg.20 mm nominal size incl the cost and carriage of cement complete Excluding cost of centering and Shuttering all work up to plinth level. | 4.33 | Cum | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade Of 1:2:4 mix ( 1 cement : 2 coarse sand : 4 graded stone agg.20 mm nominal size incl the cost and carriage of cement complete Excluding cost of centering and Shuttering all work up to plinth level. | 1 | Cum | - | - |
| 0.0 | Centering & shuttering including strutting & propping etc in foundations incl. removal of forms complete job For Foundation | - | sqm | - | - |
| 0.0 | Centering & shuttering including strutting & propping etc in foundations incl. removal of forms complete job For DPC | - | Sqm | 1 | - |
| 0.0 | Brick work with common burnt clay selected bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10 mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6 coarse sand) including curing complete With Modular bricks Above plinth level and upto floor V level incl. Carriage Machine made Bricks | - | cum | - | - |
| 0.0 | Reinforcement for RCC work incld straightning, cutting, bending,
placing in position & binding etc. all ,complete job | 0.8 | kgs | 1 | ₹0.8 |
| 0.0 | Structural steel work in builtup section fixed with connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. In tees, R.S. joists, angles, flats and channels | 0.2 | Kgs | - | - |
| 0.0 | 12 mm cement plaster in 1:6 on the rough side of single or half brick wall . | - | Sqm | 1 | - |
| 0.0 | Painting with ready mixed synthetic enamel paint of approved brand and manufacture in all shades to give an even shade on new steel work (two or more coats) . | - | Sqm | 1 | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_1021491.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .