| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC | ₹10.5 L Quoted ₹11.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.8 LRejected-AOC | ₹11.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MAHARASI ENTERPRISES | MSC ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Providing RCC Patch up work for 50mm thick in RCC wall which includes: a) Chipping out the damaged RCC wall for an average depth of 50mm and cleaning the surface thoroughly free of all dusts and cleaning the debris away from site. b) Providing and fixing 75mm x 50mm (3mm thick) weld mesh in the damaged portions. c) Applying One coat of Nitobond AR mixed with cement slurry in the ratio of 1:1 over the concrete surface, including cost of all materials, labours lead lift etc., complete. d) Patch up work with RCC 1:1.5:3 for 50mm thick using 6 to 10mm jelly including cost of all materials, labours, lead, lift, tools, curing etc. complete. | 174 | M2 | 2,32,116 ₹2.7 L | 2,43,078 ₹2.9 L |
| 2.00 | Providing patch up in the inner wall including cleaning the surface providing primer coat of epoxy compound and applying 10mm thick epoxite epoxy screeding, using quartz sand and epoxy resin and hardner including cost of all materials, labour, lead, lift etc complete. | 174 | M2 | 3,92,892 ₹4.6 L | 4,11,858 ₹4.9 L |
| 3.00 | Providing two coats of epoxite epoxy seal coat over screeding surface using epoxy resin and hardener, rate including cost of all materials, labour, lead, lift, etc complete. | 174 | M2 | 1,32,588 ₹1.6 L | 1,38,852 ₹1.6 L |
| 4.00 | Removing the spalled/ distressed concrete for an average thickness of 50mm including disposal of debris with a lead of 1km and roughening the surface thoroughly with Reebaklens fosroc acid/equivalent with all lead, lift, labour etc., complete. | 135 | M2 | 71,415 ₹84,269.70 | 74,790 ₹88,252.20 |
| 5.00 | Micro Concrete for RCC (50mm Thickness) without shuttering a) Providing micro concrete Rendroc RG (or) equivalent as per manufacture's specifications. This mixed micro concrete should be placed continuously for an average thickness of 50mm including cost of all materials, labours, lead, lift, etc., complete as directed by the engineer at site. B) Applying one coat of polymer modified Acrylic Emulsion (Nito bond AR or equivalent) on the finished concrete surfaces as a curing membrane including cost of all materials, labours, lead, lift, etc., complete as directed by the engineer at site. | 135 | M2 | 2,98,215 ₹3.5 L | 3,12,390 ₹3.7 L |
Tender Value
Refer Docs
EMD Value
₹9,500
Closing Date
3 Oct 2025, 2:00 pmClosed
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
Rectification Works to the damaged Ash Slurry Trench Inner Walls below GL leading Bottom Ash to Mill Plant Operator Room South from CH 0m to CH 90m in Unit 4
2025_EB_603159_1
CE SE C TTPS 233 2025 26
Open Tender
Civil Works - Others
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,500
Yes
14 May 2026
12 Sept 2025
4 Oct 2025
12 Sept 2025
3 Oct 2025
12 Sept 2025
Providing RCC Patch up work for 50mm thick in RCC wall which includes: a) Chipping out the damaged RCC wall for an average depth of 50mm and cleaning the surface thoroughly free of all dusts and cleaning the debris away from site. b) Providing and fixing 75mm x 50mm (3mm thick) weld mesh in the damaged portions. c) Applying One coat of Nitobond AR mixed with cement slurry in the ratio of 1:1 over the concrete surface, including cost of all materials, labours lead lift etc., complete. d) Patch up work with RCC 1:1.5:3 for 50mm thick using 6 to 10mm jelly including cost of all materials, labours, lead, lift, tools, curing etc. complete.
Providing patch up in the inner wall including cleaning the surface providing primer coat of epoxy compound and applying 10mm thick epoxite epoxy screeding, using quartz sand and epoxy resin and hardner including cost of all materials, labour, lead, lift etc complete.
Providing two coats of epoxite epoxy seal coat over screeding surface using epoxy resin and hardener, rate including cost of all materials, labour, lead, lift, etc complete.
Removing the spalled/ distressed concrete for an average thickness of 50mm including disposal of debris with a lead of 1km and roughening the surface thoroughly with Reebaklens fosroc acid/equivalent with all lead, lift, labour etc., complete.
Micro Concrete for RCC (50mm Thickness) without shuttering a) Providing micro concrete Rendroc RG (or) equivalent as per manufacture's specifications. This mixed micro concrete should be placed continuously for an average thickness of 50mm including cost of all materials, labours, lead, lift, etc., complete as directed by the engineer at site. B) Applying one coat of polymer modified Acrylic Emulsion (Nito bond AR or equivalent) on the finished concrete surfaces as a curing membrane including cost of all materials, labours, lead, lift, etc., complete as directed by the engineer at site.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_721041.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid