Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 3 605 G F 105 SECTOR 3 VASUNDHARA GHAZIABAD UTTAR PRADESH 201012 | GHAZIABAD | UTTAR PRADESH | 201012 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
6 Aug 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, EDC,Hapur
Superintending Engineer, EDC,Hapur
Various deposit line works as per list in area of EDD-I Hapur
2022_PVVNL_717592_1
49(W)/EDCH/2022-23
Open Tender
Electrical Works
Lump-sum
Hapur
enclosed
3 documents required · 3 mandatory
₹1,180
SE, EDC, Hapur
₹2,000
8 Aug 2022
26 Jul 2022
6 Aug 2022
26 Jul 2022
6 Aug 2022
26 Jul 2022
26 Jul 2022 - 6 Aug 2022
Amount
VARIOUS ELECTRICITY LINE WORKS (AS PER LIST), IN DEPOSIT SCHEME, IN THE JURISDICTION OF EDD-I HAPUR, UNDER EDC., HAPUR. (All work will be completed as per Sanctioned estimate)
Carriage of line material (like insulator, channel, clmaps, conductor etc.) from Electricity Store Center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of ST Pole 11 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of PCC Pole 8.5 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of 63KVA Transformers from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of 25KVA Transformers from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of 11KV CT/PT Unit from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of Metering Cubical Set Complete, from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Fabrication, erection and fixing of double pole on ST Pole 11 mtr. long with fixing of M.S. Top & Dropper Channel, M.S. S/S Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting as per RESPO Drawing/Norms by providing top and dropper clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Erection & Fixing of PCC Pole 8.5 mtr. long in 11 KV line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing F-Bracket made of M.S. Flat of size 50x6 mm, Cross Arm holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Erection & fixing of PCC pole 8.5 mtr. in L.T. Line after digging of suitable pits including fixing of all accessories by providing L.T. Pin Clamp made of M.S. Flat of size 50x6mm & Shackle Insulator of size 90x75 mm & proper size nuts and bolts as per RESPO Drawing/Norms.
Laying, Stringing and final sagging of ACSR Weasl Conductor after binding from Insulator, as per RESPO/Drawing Norms.
Laying of LT ABC Conductor (3x50+1x35+1x16)Sqmm etc., and completion work properly as per RESPO/Norms
Laying of 11KV XLPE Cable (3x70)Sqmm etc., and completion work properly as per RESPO/Norms
Mounting, Placing and connecting from LT/HT side of 11KV, 25/63KVA T/F as per RESPO Norms.
Installation of 11KV Metering Cubical Complete work as per RESPO Norms.
Mounting, Placing and connecting from LT/HT side of 11KV, CT/PT Units as per RESPO Norms.
Making and filling of 11KV Cable Jointing Kit 3x70Sqmm, after duly plumbing and taping of suitable XLPE Cable, providing, fixing and crimping of proper size good quality lugs, including cost of lugs and tape etc., as per RESPO Norms.
Erection & Fixing of Distribution Box on pole by provding 02 Nos. D/B Clamps & proper size nut & bolts.
Providing & Fixing of Peircing Clamps.
Providing & Fixing of Dead End Clamps.
Providing & Fixing of Suspension Clamps with Eye Hook
Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops.
Earthing of supports with MS earth Rod of (20x2500)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts.
Grouting of ST/PCC supports in CC 1:4:8 (Cement, sand & 40mm brick ballast) Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials.
Safely Dismantling & Removal of 63KVA T/F at old D/P and opening of all accessories.
Removal of Old & used Acsr weasel Conductor from insulator and opening of all accessories and bundling the same.
Removal of old & used 11KV X-arm with nust bolts and opening of all accessories.
Removal of old & used 11KV Pin Insulator with Pin nust bolts and opening of all accessories.
Carriage of Old 63KVA Transformers from site of work to Electricity store center, Hapur/JE Store with loading and unloading at both ends on Kachha Packka road.
Carriage of Old conductor, X-arm and pin insulator from site of work to Electricity store center, Hapur/JE Store with loading and unloading at both ends on Kachha Packka road.
Chemical earthing of (MC/CT/PT) Equipment the ground surface where it will be bolted to the M.S. earth strip for connection the earth strip will be welded to the earthing and neutral support, as per RESPO/Norms.
Jumpering work properly as per RESPO/Norms.
Singh Heavy Electricals
ARYAN ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .