| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.3 LAccepted-Finance | L1 | Accepted-Finance QUALIFIED FINANCIAL SUMMARY | |
| 2 | L2₹12.4 L+₹12,700 (1.03%)Accepted-Finance | L2 | Accepted-Finance QUALIFIED FINANCIAL SUMMARY | |
| 3 | L3₹12.5 L+₹22,030 (1.79%)Accepted-Finance | L3 | Accepted-Finance QUALIFIED FINANCIAL SUMMARY |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
29 Jul 2024, 10:00 amClosed
SE EDC SPN
KRISHNA NAGAR JAIL ROAD SHAHJAHANPUR
RUNNING CONTRACT FOR EXECUTION OF VARIOUS WORK OF CARRIAGE/LINE MAINTENANCE OF PCC/STP POLES, ABC CABLE 3X50/3X95/11KV ETC MATERIAL FROM STORE BYEBAGH TO VARIOUS WORK SITES AND ERECTION, EARTHING IN O AND M HEAD UNDER EDD-JALALABAD SHAHJAHANPUR
2024_MVVNL_937733_1
29(W)/EDCS/2024-25
Open Tender
Miscellaneous Works
Item Rate
365 days
SHAHJAHANPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
SE EDC
₹10,000
Yes
6 Aug 2024
11 Jul 2024
29 Jul 2024
11 Jul 2024
29 Jul 2024
11 Jul 2024
Amount
The work of safe carriage of the following material from Byebagh store center to work site under the jurisdiction of EDD-JALALABAD, Shahjahanpur. Approx. distance upto 80 Km. Including safe loading and unloading.
PCC Pole 8.5/9 meter long.
STP 9/11/13 Mtr Long
Line material i.e., cross arm/ conductor/ pin insulater/stay/earthing rod/Disc Fitting/Disc Insulators/11 KV XLPE Cable etc
Erection of new PCC Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms
PCC Pole 8.5/9 Mtr Long Single Pole
ST Pole 9/11/13 Mtr Long Single Pole.
Earthing of distribution transformer of 160,250,400 KVA TF by chemical earthing by digging/drilling of kit approx 10 fit (LS 3 Mtr) depth and inserting GI pipe of 1.25 inch dia of "B" grade and then fill up the chemical with water and complete to requirment two number of earthing of each transformer one for the transformer neutral and another for transformer body double pole & equipment etc to be done. The top of the inserted pipe to be connected to the neutral and transformer body through G.I Strip with the helpof the nut bolt or by welding as per the direction of the authorised representative of the department, It includes the cost of material, Labour T&P provided by the contractor.
Grouting with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms
PCC Pole 8.5/9 Mtr Long Single Pole
PCC Pole 8.5/9 Mtr Long Double Pole
ST Pole 9/11/13 Mtr Long Single Pole.
ST Pole 9/11/13 Mtr Long Double Pole.
Under ground laying of Following cable in Single circuit on double pole situated at both sides complete in all respect with minimum depth of at least 0.75 meter and cable should be covered by layer of bricks from three sides along with the filling of 04 nos cable jointing kit
11 KV XLPE Cable Size 3x120 sqmm
11 KV XLPE Cable Size 3x185 sqmm
11 KV XLPE Cable Size 3x70 sqmm
11 KV XLPE Cable Size 3x300 sqmm
Repairing/New construction of plinth
Repairing/New construction Fencing for plinth
The work of digging of pits, erection of stay clamp, Insulator, pcc poles, stp poles, ABC/DOG/WEASEL conductor ETC
straightening of tilted X-arm
straightening of tilted 8.5/9 meter pole
straightening of tilted 9/11/13 meter stp
resagging and tightening of 33 kv line
resagging and tightening of 11 kv line
resagging and tightening of single phase abc of lt line
resagging and tightening of Three phase abc of lt line
straightening of tilted f-clamp
fabrication work
Safe back carriage of Scrap (if any) from work site to Byebagh store Shahjahanpur approx distance upto 80 Km including safe loading & unloading.
PAWAN SHAKTI ENTERPRISES
SHREE BALAJI MAHARAJ
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .