Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹12.6 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹12.6 L+₹600 (0.05%)Rejected-Finance | L-2 | Rejected-Finance Other Than L-1 | |
| 3 | L-3₹12.8 L+₹25,000 (1.99%)Rejected-Finance | L-3 | Rejected-Finance Other Than L-1 | |
| 4 | L-4₹13.4 L+₹78,761 (6.26%)Rejected-Finance BEHIND MAHA MIRTYUNJAY MANDIR SPO TYPE MPEB COLONY BIRSINGHPUR PALI DISTRICT UMARIA M P | L-4 | Rejected-Finance Other Than L-1 | |
| 5 | L-5₹13.4 L+₹83,874 (6.66%)Rejected-Finance NEW POLICE LINE KE SAMNE WARD NO 25 ASHOK NAGAR BHIND MADHYA PRADESH 477001 | BHIND | BHIND | MADHYA PRADESH | 477001 | L-5 | Rejected-Finance Other Than L-1 |
Tender Value
₹17.2 L
EMD Value
₹43,000
Closing Date
17 Nov 2020, 5:30 pmClosed
SE PNW SGTPS Birsinghpur
SE PNW SGTPS Birsinghpur
Tender for Annual Operation of dam radial gates across johila river during open season and rainy season including premonsoon maintenance of radial gates and ancillary works in johilla dam at SGTPS Birsinghpur
2020_MPPGC_101704_1
SEC/BRS/469
Open Tender
Civil Works - Others
Item Rate
365 days
SGTPS MPPGCL BIRSINGHPUR
As per NIT
10 documents required · 10 mandatory
₹1,000
Payable To Sr AO Officer SGTPS Birsinghpur
₹43,000
Yes
14 Mar 2022
14 Oct 2020
21 Nov 2020
14 Oct 2020
17 Nov 2020
14 Oct 2020
Work for open season for pump operation of dam drainage gallery, gate operation if required, watch and ward of control room, old pump house and their premises, machinery at hoist plate form (as per Annexure- I of Schedule) open seasons i.e. 16th Oct. To 15th June = 08 Month One Job per Month) etc as per direction of engineer in-charge.
Work of rainy season for operation of dam radial gates and pump operation of dam drainage gallery watch and ward of control room, their premises including machinery and hoist platfrom etc. As per dierction of engineer incharge (as per annexure II of Schedule) (Rainy season i.e. - 16- June to 15- Oct = 04 Month)
Maintenance of rope drum hoist set consisting of one number control drive unit and two number end gear box along-with associated equipments and all installed at hoist Bridge.
Above water level maintenance of wire rope up to drum i/c painting oiling, greasing etc complete.
Painting of scale provided in u/s and d/s side of reservoir, & demarcation of chainge and level of gallery, it include all materials i.e. Asian paint grade “A” with safety appliance, T&P and labour etc. complete for the job as per direction of Engineer-in-charge.
Maintenance of wire rope it included cleaning of wire rope drum, pulley block tightening of nut bolt, lapping of servo coat 120, aligning of pulley block for all gates etc complete the job all work done as per direction of Engineer-in-charge.
Work in open season scraping and removal of alkali deposit in drain, sump well, wall surface air vent, drainage vent provided in roof of gallery vent of surface (Cleaning by mechanically or manually operation) and spoil obtained and other was material shall be disposed off oute side of hydel P.H. (1x20 MW) building or as directed by Engineer-in-charge, and Cleaning of back side trench right side top floor of hydel building and front of hydel power house/left side of TRC floor top between counter forts of new retaining wall i.e. removal of all deposited debris scraping of kai i/c cleaning of chamber and uprooting /cutting of unwanted vegitation at ground level cutting of concrete in floor for proper drainage etc complete i/c disposal upto 100 M of hydel building work to be done as per direction of Engineer-in-charge.
Removel of bee hive from dam & hydel power house inside and out side the building and redial gate operating structure and adjoining area this item include full safety precaution i.e. safety belt, rasshi, ledder, brush etc. and all type of T&P required for this work by expert person. excute the such type of work safely.
Cutting and removel of tree from 100 mm to 500 mm dia from masonry / concrete down stream face of johilla dam like pier, masonry face at any elevation with lowering person to desire elevation with the help of rope, holding rope at top of dam till completion of work, completion of work & back on top later cutting tree in branches, removal it upto 100 mtr lead,etc complete with all T&P and safety belt etc as per direction of Engineer-in-charge. (Bargad, pepal & other species )
SONALI ASSOCIATES
BALAJI PROGRESSIVE CONTRACTOR
RAJKAMAL INFRACON
RAGHVENDRA SINGH
R. L. TIWARI
JYOTI TRADERS
MULAYAM SINGH YADAV
PIYUSH ENGINEERING WORKS
HYDROYA GREENTECH
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .