Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹96,617.24Admitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.0 L+₹4,888.07 (5.06%)Admitted-Finance GOHLAD MENDHAR | MENDHAR | POONCH | JAMMU KASHMIR | L2 | Admitted-Finance | ||
| 3 | L3₹1.0 L+₹7,384.10 (7.64%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹1.0 L
EMD Value
₹2,080
Closing Date
9 Sept 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_323224_17
e-NIT No. 94 of REW Poonch 2026-27 Dated 02-09-2026
Open Tender
Civil Works
Percentage
30 days
poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Division Poonch
₹2,080
14 Oct 2026
2 Sept 2026
10 Sept 2026
2 Sept 2026
9 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge AKS = 80%, OR = 20% | 179.12 | cum | 228.4 | ₹40,911.01 |
| 2 | Consolidation of subgrade with power road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc.
and rerolling the subgrade. | 261 | sqm | 2.8 | ₹730.8 |
| 3 | Supplying and stacking at site Graded crushed stone aggregate of size 63 mm to 45 mm | - | cum | 1,204.15 | - |
| 4 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3
wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. | - | cum | 768.5 | - |
| 5 | Supplying and stacking at site good earth | 2.13 | cum | 281.3 | ₹599.17 |
| 6 | Carriage of stone Agg. By 12 KM by MT | 26.1 | cum | 374.49 | ₹9,774.19 |
| 7 | Add cost of CIB | 1 | No | 500 | ₹500 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
BOQ_1087356.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .