Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.9 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹41.3 L+₹40,010 (0.98%)Rejected-AOC SR NO 281 3 7 ANAND NAGAR NEAR DHANORI JAKAT NAKA LOHEGAON PUNE 411047 | PUNE | PUNE | MAHARASHTRA | 411047 | L2 | Rejected-AOC Not Being L1 | |
| 3 | L3₹44.7 L+₹3.7 L (9.15%)Rejected-AOC | L3 | Rejected-AOC Not Being L1 | |
| 4 | L4₹44.7 L+₹3.8 L (9.25%)Rejected-AOC RADHA NIKUNJ L 2 SOUTH CIVIL LINES ROORKEE HARIDWAR UTTARAKHAND 247667 | ROORKEE | HARIDWAR | UTTARAKHAND | 247667 | L4 | Rejected-AOC Not Being L1 | |
| 5 | L5₹45.3 L+₹4.3 L (10.6%)Rejected-AOC | L5 | Rejected-AOC Not Being L1 |
| Sl No | Description | Qty | Unit | M/S - KRUPA ELECTRICALS L7 | m/s raghavendra kulkarni L3 | Shiva Shakthi Electrical Enterprises L6 | EX SOLDIERS MECHANICAL WORKS L4 | Srinivas G Civil Contractor L1 | Gee Kay Projects L5 | Chandana Enterprises L8 | VP DEVELOPERS AND CONTRACTOR L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation averaging 15cm deep and n.exc 30cm deep and getting out in hard / dense soil complete all as specified and directed | 180 | Square Metre | 25 ₹4,500 Lowest | 65 ₹11,700 | 145 ₹26,100 | 60 ₹10,800 | 120 ₹21,600 | 45 ₹8,100 | 30 ₹5,400 | 80 ₹14,400 |
| 2.00 | Excavation in trenches and not exe. 1.5 m wide and not exe. 1.5 m in depth for foundation of drain, man hole , laying of UG cables etc. not exe. 10 Sq. m on plan and not exe. 1.5 m depth and getting out in soft / loose soil complete all as specified and directed. | 683 | Cubic Metre | 290 ₹1,98,070 | 350 ₹2,39,050 | 265 ₹1,80,995 | 270 ₹1,84,410 | 200 ₹1,36,600 Lowest | 297 ₹2,02,851 | 300 ₹2,04,900 | 250 ₹1,70,750 |
| 3.00 | Excavating in post holes (or similar holes) each not exc 0.50 cum, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exc 25cm, watering, and removing surplus soil to a distance not exc 50 m and making good surface in soft/ loose soil. | 20 | Each | 100 ₹2,000 | 400 ₹8,000 | 300 ₹6,000 | 200 ₹4,000 | 500 ₹10,000 | 360 ₹7,200 | 90 ₹1,800 Lowest | 150 ₹3,000 |
| 4.00 | Returning filling in trenches including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick in soft rock complete all as specified and directed | 394.85 | Cubic Metre | 90 ₹35,536.5 | 90 ₹35,536.5 | 40 ₹15,794 Lowest | 60 ₹23,691 | 240 ₹94,764 | 63 ₹24,875.55 | 95 ₹37,510.75 | 210 ₹82,918.5 |
| 5.00 | Removing excavated surplus soil to a distance not exceeding 50 mts and depositing where directed .at a level not exceeding 1.5 M above the starting point complete all as directed. | 288.15 | Cubic Metre | 100 ₹28,815 | 100 ₹28,815 | 40 ₹11,526 Lowest | 60 ₹17,289 | 300 ₹86,445 | 63 ₹18,153.45 | 110 ₹31,696.5 | 270 ₹77,800.5 |
| 6.00 | M & L for Hard core of broken hard stone or boulders of guage not exceeding 63 mm , deposited spread as subbase to inter locking tiles in layers n.exc 15cm thick , watered & well rammed to true surface complete all as specified and directed. | 21 | Cubic Metre | 1,250 ₹26,250 | 1,500 ₹31,500 | 1,300 ₹27,300 | 1,700 ₹35,700 | 300 ₹6,300 Lowest | 1,530 ₹32,130 | 1,275 ₹26,775 | 600 ₹12,600 |
| 7.00 | M&L for PCC 1:4:8 type D2 using 40 mm graded crushed stone aggregate in foundations, filling and mass concrete complete all as specified and directed | 2 | Cubic Metre | 4,200 ₹8,400 Lowest | 5,000 ₹10,000 | 4,500 ₹9,000 | 5,500 ₹11,000 | 4,500 ₹9,000 | 5,250 ₹10,500 | 4,500 ₹9,000 | 4,300 ₹8,600 |
| 8.00 | M&L for PCC 1:3:6 type C2 using 40 mm graded crushed stone aggregate in foundations, filling and mass concrete complete all as specified and directed | 3 | Cubic Metre | 4,800 ₹14,400 | 7,000 ₹21,000 | 4,300 ₹12,900 | 6,500 ₹19,500 | 4,000 ₹12,000 | 5,250 ₹15,750 | 4,600 ₹13,800 | 3,900 ₹11,700 Lowest |
| 9.00 | M&L factory made pre cast PCC 1:3:6, type C1 (using 20 mm graded granite aggregate) as in block masonry with solid blocks, exceeding 10 cm in width and setting in CM 1:4 complete all as specified. | 8 | Cubic Metre | 7,500 ₹60,000 | 7,200 ₹57,600 | 850 ₹6,800 Lowest | 6,700 ₹53,600 | 5,700 ₹45,600 | 6,300 ₹50,400 | 7,650 ₹61,200 | 6,300 ₹50,400 |
| 10.00 | S&F rolled mild steel work as in roof trusses (framed), trussed, purlins, crane gantries, rails and fastenings and heavy bracket framing (Beam, tee, angle, channel or flat sections) including distance pieces, cleats, necessary welding etc. conforming to Grade E-250 quality ‘A’ all as specified and as directed | 2,890 | Kilo Gram | 100 ₹2,89,000 Lowest | 130 ₹3,75,700 | 120 ₹3,46,800 | 115 ₹3,32,350 | 135 ₹3,90,150 | 126 ₹3,64,140 | 100 ₹2,89,000 Lowest | 120 ₹3,46,800 |
Tender Value
₹47.5 L
EMD Value
₹94,940
Closing Date
11 Aug 2025, 6:00 pmClosed
GE CENTRAL BANGALORE
ASC CENTRE AND COLLEGE AGRAM POST BANGALORE 560007
PROVN OF PARKING SHED WITH HARD STANDING OFFRS JCO OR AT ASRI BLDG AND PROVN OF LT RING MAIN RMU SYSTEM TO KAKUL BLOCK AND BAREILLY BLOCK AND CONNECTD WORKS AT ASC CENTRE AND COLLEPROVN OF PARKING SHED WITH HARD STANDING OFFRS JCO OR AT ASR
2025_MES_720464_1
8544E
Open Tender
Civil Works - Others
Item Rate
180 days
GE CENTRAL BANGALORE
Please refer tender documents
6 documents required · 6 mandatory
₹500
GE CENTRAL BANGALORE
₹94,940
Yes
18 Oct 2025
15 Jul 2025
13 Aug 2025
15 Jul 2025
11 Aug 2025
30 Jul 2025
15 Jul 2025 - 29 Jul 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .