Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹7.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹7.9 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹7.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹7.9 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹7.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹7.9 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹7.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.4 L
EMD Value
₹93,509
Closing Date
14 Aug 2026, 3:00 pmClosed
CE KNN
CE OFFICE KNN MOTI JHEEL
Construction of drain from kamlesh Kumar Pandey To Manish Tiwari in the lane krishna kant Gopal Nagar Ward 46 Under Zone02
2026_NNKAN_1175696_1
1298/AA-2/25-26
Open Tender
Civil Works
Fixed-rate
45 days
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹93,509
11 Sept 2026
10 Aug 2026
14 Aug 2026
10 Aug 2026
14 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Cutting in foundation and under plinth area lift 1.5m lead 30m by direction of E/I etc all complete. | 128.25 | cum | 125 | ₹16,031.25 |
| 2 | Earth work in execavation in foundation and under plinth area lift 1.5 m lead 30 m with all charges complete. | 43.61 | Cum | 170 | ₹7,413.7 |
| 3 | poviding and Laying of Cement Concrete 1:6:12 Cement, C.Sand and 40 mm gauge brick ballast etc all complete. | 11.63 | Cum | 4,380 | ₹50,939.4 |
| 4 | class-150 Brick workin(1:4)Cement, c.sand in foundation and pilnth etc all complete. | 32.32 | cum | 6,600 | ₹2,13,312 |
| 5 | 12mm th cement plaster in 1:6 cement and coarse sand etc all complete. | - | sqm | 200 | - |
| 6 | Reinforcement cement concrete work in 1:1.5:3 grade excluding cost of centering, shuttering and finishing and reinforcement (all work upto plinth level)5.1.2 | 1.5 | cum | 8,720 | ₹13,080 |
| 7 | mild steel or Iron work in plain work such as reinforced concrete to required shape as necessary including binding for proper completion of work. | 1.18 | qtl | 7,200 | ₹8,496 |
| 8 | Construction of granual sub base (GSB) with well graded materails in uniform layer etc all complete. | 27.36 | cum | 3,671 | ₹1,00,438.56 |
| 9 | Supply & Laying of 80mm thick rubber moulded interlocking tiles with local sand 25-40 mm thick etc all complete. | 342 | sqm | 925 | ₹3,16,350 |
| 10 | Disposal of surplus earth/ Malwa Upto 3Km etc all complete. | 154.67 | cum | 116.96 | ₹18,090.2 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.22 MB
BOQ_2209450.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .