Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.8 LAccepted-AOC | L1 | Accepted-AOC Due to under-quotation | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 consider for evaluation |
Tender Value
₹76.2 L
EMD Value
₹45,860
Closing Date
7 Sept 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Excutive officer
ARULTHARUM MUTHARAMMAN TEMPLE, KULASEKARANPATTINAM
Proving Thirupani Works in Arulmigu Chidambareswarar Temple Thirupani work at Kulasekarapattinam Tiruchendur Taluk in Tuticorin District ( Sub Temple of Arulmigu Mutharamman Temple )
2023_HRCE_364037_1
03/2023-2024
Open Tender
Civil Works
Lump-sum
335 days
kulasekaranpattinam
Please refer Tender documents.
7 documents required · 7 mandatory
₹17,700
Yes
₹45,860
19 Feb 2024
28 Aug 2023
7 Sept 2023
28 Aug 2023
7 Sept 2023
28 Aug 2023
Amount
Scaffolding charges for Vimanans and gopurams with casurina posts coconut of palm trees whereever necessary for main, form work and providing with non flammable coverings, providing ladder arrangements, country wood planks for working, inspection etc., complete. Upto 25' height
Clean removal the existing Lime Plaster including clearing away from site etc complete.
Providing vargapoochu over the walls of Vimanam/Gopuram with L.M 1:4 complete including shaping Mukapathrams matha nasi koodu and all ornamental works to proper shape by embedding broken chips or shaped chiselled bricks, rough plastering and finishing with final ornamental plastering and nayam theervai etc., complete.
Painting two coats with approved quality of water based exterior emulsion paint including one coat of priming coat in cement plastered wall surfaces in all floor including cost of all materials brushess, etc., scaffolding charges etc., complete complying with standard specification and as directed by the departmental officers.
Providing new sudhai vigrahams in the vimanams and Rajagoupurams with galvanized iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in LM 1:3 finishing the same with LM 1:3 bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments weapons peedam etc., complete and providing LM nayam theervai wherever neceessary,inclusive of cost and conveyance of all materials, such as cement broken bricks, sand G.I. rods, binding wire all labour for working in heights, curing lifting of materials etc., complete including cement painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornwmental costumes etc., as per prathima Lakshana, Vigraham height is measurable from the crown be adopted as detailed here under).
For 2'6"- 3'0" height upto 1'-0"
For 2'6"- 3'6" height upto 1'-0"
Dismantling Weathering course /lime concrete and including clearing away from the site etc., complete.
Labour charges for Removing the old cutstone member including numbering, carefully stacking the materials for reuse etc., complete
Refixing the cutstone member including conveyance from stockyard, aligning, fixing in correct position and including all incidental charges etc complete
Supplying and filling in foundation, basement, etc with filling CSsand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Restoration by providing water wash and appropriate methodology to restore the originalities of the existing cutstone structures inclusive of necessary scaffolding charges, conveyance and hire charges for all tools and plants and clearing the site afters completion of work etc complete.
Pointing with LM 1:1.5 in cutstone joints including cost and coveyance of all materials and all labour charges etc., complete.
Providing new cut stone Thickness of not less than10cm for flooring including charges for palamunai dressing and fixing in position including pointing with lime mortar 1:3 and all materials and labours charge etc., complete. Rate approved by the commissioner H.R& C.E Department, Chennai
Supplying and fixing of country wood Door including cost and conveyance of all materials and labour charges etc complete.
Weathering course concrete using best quality broken brick jelly of size 20mm uniform gauge in pure slaked lime, the proportion of brick jelly to lime being 32 to 12 ½ (No sand to be added) by volume and laid over the RCC roof slab in a single layer and consolidated to the finished thickness by beating the concrete with wooden beaters of approved pattern keeping the surface constantly wet by sprinkling lime jaggery water etc. complete complying with standard specification.
Plastering work in LM 1:4 with 20mm thick including cost and conveyance of all materials and labour charges etc. Complete.
Painting new wood work with two finishing coats of synthetic Varnish mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Dismantling mangalore tiled roof without roof timbers including clearing away from the site etc., complete.
Dismantling wrought and put-up framed timbers including numbering, carefully stacking the materials for reuse etc., complete
Supplying and fixing Palmyrah rafter 50-60mm wide and 125mm depth including cost and conveyance and all labour charges etc., complete.
Supplying and fixing countrywood scantling including all incidental charges etc., complete.
Clean removal the existing decayed lime plaster including clearing away from site etc complete.
Earth work excavation for foundation in all classes of soils and sub soils and todepth as may be directed except in hard rock, requiring blasting, including initial leads and lifts and re-filling the sides of foundation, with excavated earth in 150mm layers well watered rammed and consolidated, including depositing surplus earth clearing and levelling the site, shoring shuttering baling out water wherever necessary etc., complete complying with standard specification.
Cement Concrete of mix 1:5:10 (One Cement, Five Sand and Ten Aggregate) using 40mm size ISS gauge hard broken granite stone jelly including all incidental charges dewatering if found necessary and laid in layers of not more than 15cm thick consolidating, finishing and curing as directed by the Departmental Officers etc. complete complying with Standard Specifications. For Foundation & Basement.
Brick masonry in LM 1:5 using stock bricks incluing cost and convetance of all labour andmaterials including scaffolding curing finishingetc., complete complying with standard specification and as directed.etc., complete for Vimanams upto 15' 0" Height
Best tiled roofing with mangalore tiles I class A including cost for teakwood reepers including providing required wind ties, screws, washers and nails including cost and conveyance to site and all incidental charges etc complete
Dismantling the plain cement concrete including clearing a site etc complete
Plastering work in LM 1:5 with 12mm thick including cost and conveyance of all materials and labour charges etc. Complete.
Supplying and fixing teakwood scantling including transportation to the site etc., complete
Dismantling the door and carefully stacking including clearing away from the site etc., complete.
Supplying and fixing MS Grill using I section and MS angle including cost and conveyance of all materials and fixing in position including priming coat etc complete. Complying with standared specifications.
Painting two coats over new Iron work with best approved quality synthetic enamel paint including a priming coat with ready mixed primer of approved quality including cost of primer etc complete in all floors. The rate shall include cost of all materials, taxes, brushes, scaffolding charges and labour charges for painting etc. complete complying with standard specification. [The make and colour of paint to be used should be got approved by the departmental officers before use on works]
Dismantling the cutstone member including numbering, carefully stacking the materials for reuse etc., complete
Ulvari
Uthiram
Kabothagam
Vyalam
Pavukal
Uthiram(thani)
Flooring
Refixing the cutstone member including conveyance from stockyard, aligning, fixing in correct position and including all incidental charges etc complete
Ulvari
Uthiram
Kabothagam
Vyalam
Pavukal
Flooring
Supply of New Cut stone for Pavukal, Uthiram, Flooring slab etc including cost and conveyance of Cut stone, labour charges for loading , unloading and all other incidental charges etc complete
Uthiram (thani)
Ulvari
Uthiram
Kabothagam
Vyalam
Dismantling the Brickwork in lime mortar including clearing a site etc complete
Random Rubble Masonry in cement mortar 1:5 [one cement and five sand] using new hard granite stones including providing new bond stones wherever necessary including simultaneous flush pointing of the exposed surface above ground level with the same mortar and all incidential charges such as scaffolding, finishing and curing as directed by the departmental officers etc., complete complying with the standard specification.
Labour charges for palamunai dressing including all incidental charges and hire charges for tools and plants etc., complete
Uthiram thani
Ulvari
Uthiram
Kabothagam
Vyalam
Supplying and fixing in position best approved of ISI quality of 110mm dia PVC rain water down fall pipes having a pressure of 4 Kg./sq.cm including cost of necessry PVC shoe, PVC bend, gratings of required diameter and special clamps, brass screws, nails, etc. and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc. complete. The rate shall be inclusive of cast of removable iron grating. The PVC pipe shall be fixed in wall with special type of clamps. Special type of "U" clamp at the centre of the pipe line shall be fixed in addition to those for more than 3.0 M pipe length complying with standard specification. 110mm dia PVC rain water down fall pipes.
Dismantling the Brickwork in cement mortar including clearing a site etc complete
Labour charges for palamunai dressing including all incidental charges and hire charges for tools and plants etc., complete
Supply of New Cut stone for Pavukal, Uthiram, Flooring slab etc including cost and conveyance of Cut stone, labour charges for loading , unloading and all other incidental charges etc complete
Removing the cutstone member and including all incidental charges etc complete.
Pillar thani
Flooring
Pavukal
Refixing the cutstone member including conveyance from stockyard, aligning, fixing in correct position and including all incidental charges etc complete
Pillar thani
Flooring
Pavukal
Supply of New Cut stone for Pavukal, Uthiram, Flooring slab etc including cost and conveyance of Cut stone, labour charges for loading , unloading and all other incidental charges etc complete
Pavukal
Ulvari
Labour charges for palamunai dressing including all incidental charges and hire charges for tools and plants including pointing with LM 1:3 etc., complete
Pavukal
Ulvari
Dismantling the country wood scantling in roofs and including all incidental charges etc complete.
Painting old wood work with two finishing coats of good quality Varnish of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Finishing the top of roof with one course of approved first quality of new Machine Pressed tiles of size 200mm x 200mm x 20mm thick of approved quality laid in L.M. 1:3 (one cement and three sand) 12mm thick mixed with water proofing compound conforming to Indian standard as approved by the departmental officers at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same mortar mixed with water proof compound and red oxide etc. complete complying with standard specification.
Pointing in pressed tiles LM 1:3 including cost and coveyance of all materials and labour charges etc complete.
M J ENGINEERING CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_433958.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .