Tender Value
₹60.4 L
EMD Value
₹3.0 L
Closing Date
29 Jun 2026, 12:00 pm
Similar tender results from the same govt authority in the past 3 years.
CHIEF ENGINEER
Lda Gomti Nagar, Lucknow
Gomti Nagar Vistar Sector-6 me Isthit Bhukhand no- 6C/894 to 6C/909, 6D/867 to 6D/850 Evam 6D/793 to 6D/778 ke Samne Sadak evam Nali ki Marramat ka karya.
2026_LDAUP_1162556_1
41/ENIVIDA/CE/2026_09
Open Tender
Civil Works
Lucknow
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,366
Secratary LDA
₹3.0 L
20 Jun 2026
20 Jun 2026
30 Jun 2026
20 Jun 2026
29 Jun 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift up to 1.5 m, as directed by Engineer-in-Charge:, All kinds of soilDSR 2023- 2.1.1 | - | cum | 1 | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m., All kinds of soil.DSR 2023- 2.8.1 | 1 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).DSR 2023- 4.1.8 | 1 | Cum | 1 | ₹1 |
| 4 | Mild steel or iron work in plain work such as in R.C.C. or R.B. (when not included in an over all rates ) including bending for proper completion of the work and including supply of steel and its wastage , bends, hooks and authorised overlaps shall be measured up to floor two level- L.D.A APPRO. | 0.2 | Qtl | - | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :, 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)DSR 2023- 5.1.2 | - | Cum | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for :, Centering and shuttering including strutting and propping and removal of items for: Foundations, footings, base of columns, etc DSR 2023/5.9.1DSR 2023- 5.9.1 | - | Sqm | 1 | - |
| 7 | Providing and laying spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carrige of mixed material by tipper to site, laying in uniform layiers with paver in sub-base / base course one well prepared surface and compacting with vibratory roller to achieve the desired density. (Sanction Rate)- morth -406 (sanctioned rate) | 0.8 | cum | - | - |
| 8 | Providing and applying primer coat with bitumen emulsion (slowe setting) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. (Sanction Rate)- MoRTH Based Analysis | - | sqm | - | - |
| 9 | Providing and laying bituminous macadam (B.M.) with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @3.30%, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction (Sanction Rate)-1052 | 0.8 | mt | - | - |
| 10 | Providing and applying tack coat with bitumen (Vg-10) pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.Both wheeled Roller 8 - 10 tonne capecity, finished to required level and grades. (Sanction Rate)- MoRTH based analysis-Tack Coat | - | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.08 MB
BOQ_2179033.xls
BOQ • 0.28 MB
T_2.pdf
Tender Documents • 4.27 MB
Download all tender documents and submit your bid