| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.5 CrAccepted-AOC 10 243 THURAIYUR MAIN ROAD PONNERI POST NAMAKKAL 637013 | NAMAKKAL | TAMIL NADU | 637013 | ₹26.5 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹28.8 CrRejected-AOC 1A 20 EAST SEERANAGAPALAYAM ROAD SALEM 63607 | 63607 | ₹28.8 Cr | L2 | Rejected-AOC L2 Bidder |
Tender Value
₹26.7 Cr
EMD Value
₹26.7 L
Closing Date
27 Oct 2023, 3:00 pmClosed
The Project Director
DRDA Namakkal
Formation of the road from Vadugam to Melur Via Keelur Km 6/0 - 10/0 in Vennandur Block of Namakkal District under NABARD-RIDF -XXIX Pkg.No-3/NKL/NABARD 2023-24
2023_RDTN_371597_5
DIPR/5161/Tender/2023
Open Tender
Civil Works - Roads
540 days
Keelur Vennandur
Required Documents as per Tender Document
4 documents required · 4 mandatory
₹0
₹26.7 L
DRDA Namakkal
20 Dec 2023
26 Sept 2023
27 Oct 2023
26 Sept 2023
27 Oct 2023
4 Oct 2023
4 Oct 2023
Amount
Formation from Vadugam to Melur Via Keelur Km. 6/000 - 10/000
Clearing grubbing and road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per technical specification clause 201
Earth work in all soil except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc complete W-0085
Earth work excavating SDR-( Not Requiring Blasting ) and depositing on bank with in itial lead of 10m and initial lift of 2m in soft disintegrated rock , laterite , soft rock or kankar not required blasting
MR-&-DMR ( Not Requiring Blasting ) Earth work excavating and depositing on bank with in itial lead of 10m and initial lift of 2m in soft disintegrated rock , laterite , soft rock or kankar not required blasting
Excavation for roadway in hard rock ( blasting prohibited ) with rock breakers including breaking rock , loading in tippers and disposal with a lift upto 1.5m and lead upto 1000 metres trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections as per Technical specification clause 302.3.5
Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5 ( Filling with cut Earth )
Kilometre stone Reinforced cement concrete M15 grade kilometre stone / local stone of standard design as per IRC : 8 fixing in position including painting and printing etc as per drawing and technical specification clause 1703
Ordnary Kilometer Stone
200m Stone
Metal Beam Crash Barrier Type-A W Double Guard Providng and erecitng single sided double guard metal beam crash barrier system 1.70m high, comprising of 3m thick wall "W" beams posts and spacer channels shall be made by cold roll forming using HR conform to IS 5986 Fe 410 / 360 and dip galavanized having zinc mass of 550gms/sqm minimum 950mm above road / ground level fixed on ISMC series channel vertical posts 150x75x5mm spaced 2m center 312mm x 83mm flange width x 3mm thick , 4318mm long post directly embedded in the concrete ( M15) pit size 350x350x8mm for a depth of 750mm below ground. All fixing bolts and nuts hot dip galvanized conforming to IS:1367 clause 4.60 all complete as per technical specification and as directed by th Engineer - in- charge
Constuction of Pipe Culvert
Construction of Culvert @ Km 6/000 - 7/000 @ Ch. 6236,6236,6533,6841,6893
Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out construction of shoring and bracing removal of stumps and other deleterious material and disposal upto a lead 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material
Pipe Culvert @ Ch. 6/236,6/236, 6/533, 6/841, 6/893
Supplying and Filling foundation and Basement with filling sand in layers not more than 15cm, thick well ramed watered and compacted complete complying with standard specification
Pipe Culvert @ Ch. 6/236,6/236, 6/533, 6/841, 6/893
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 Cum
Pipe Culvert @ Ch. 6/236,6/236, 6/533, 6/841, 6/893
Cement concrete 1:3:6 mix using 20mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers not more than 15cm thick, compacting etc complete complying with standard specifications and as directed for Footings Below Sill Works
Pipe Culvert @ Ch. 6/236,6/236, 6/533, 6/841, 6/893
Cement concrete 1:3:6 mix using 20mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers not more than 15cm thick, compacting etc complete complying with standard specifications and as directed for Footings Above Sill Works
Pipe Culvert @ Ch. 6/236,6/236, 6/533, 6/841, 6/893
Gravel FillingGravel filling between body wall including cost and conveyance of gravel, labour for filling , watering and compacting etc complete complying with standard specification and as directed by the departmental officer
Pipe Culvert @ Ch. 6/236,6/236, 6/533, 6/841, 6/893
Providing and laying reinforced cement comcrete pipe NP3 for culverts on first bedding of granular material in single row incluing fixing collar with cement mortar 1:2 but excluding excavation protection works backfilling concrete and masonry works head walls and parapets
Pipe Culvert @ Ch. 6/236,6/236, 6/533, 6/841, 6/893
Construction of Culvert @ Km 7/000 - 8/000 @ Ch. 7183, 7458, 7522, 7604,7800,7887, 7983
Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out construction of shoring and bracing removal of stumps and other deleterious material and disposal upto a lead 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material
Pipe Culvert @ Ch. 7/183, 7/458, 7/522, 7/604, 7/800, 7/887,7/983
Supplying and Filling foundation and Basement with filling sand in layers not more than 15cm, thick well ramed watered and compacted complete complying with standard specification
Pipe Culvert @ Ch. 7/183, 7/458, 7/522, 7/604, 7/800, 7/887,7/983
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 Cum
Pipe Culvert @ Ch. 7/183, 7/458, 7/522, 7/604, 7/800, 7/887,7/983
Cement concrete 1:3:6 mix using 20mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers not more than 15cm thick, compacting etc complete complying with standard specifications and as directed for Footings Below Sill Works
Pipe Culvert @ Ch. 7/183, 7/458, 7/522, 7/604, 7/800, 7/887,7/983
Cement concrete 1:3:6 mix using 20mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers not more than 15cm thick, compacting etc complete complying with standard specifications and as directed for Footings Above Sill Works
Pipe Culvert @ Ch. 7/183, 7/458, 7/522, 7/604, 7/800, 7/887,7/983
Gravel FillingGravel filling between body wall including cost and conveyance of gravel, labour for filling , watering and compacting etc complete complying with standard specification and as directed by the departmental officer
Pipe Culvert @ Ch. 7/183, 7/458, 7/522, 7/604, 7/800, 7/887,7/983
Providing and laying reinforced cement comcrete pipe NP3 for culverts on first bedding of granular material in single row incluing fixing collar with cement mortar 1:2 but excluding excavation protection works backfilling concrete and masonry works head walls and parapets
Pipe Culvert @ Ch. 7/183, 7/458, 7/522, 7/604, 7/800, 7/887,7/983
Construction of Culvert @ Km 8/000 - 9/000 @ Ch. 8057,8140,8417,8608,8683,8852,8995
Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out construction of shoring and bracing removal of stumps and other deleterious material and disposal upto a lead 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material
Pipe Culvert @ Ch. 8/057, 8/140, 8/417, 8/608, 8/683, 8/852, 8/995
Supplying and Filling foundation and Basement with filling sand in layers not more than 15cm, thick well ramed watered and compacted complete complying with standard specification
Pipe Culvert @ Ch. 8/057, 8/140, 8/417, 8/608, 8/683, 8/852, 8/995
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 Cum
Pipe Culvert @ Ch. 8/057, 8/140, 8/417, 8/608, 8/683, 8/852, 8/995
Cement concrete 1:3:6 mix using 20mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers not more than 15cm thick, compacting etc complete complying with standard specifications and as directed for Footings Below Sill Works
Pipe Culvert @ Ch. 8/057, 8/140, 8/417, 8/608, 8/683, 8/852, 8/995
Cement concrete 1:3:6 mix using 20mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers not more than 15cm thick, compacting etc complete complying with standard specifications and as directed for Footings Above Sill Works
Pipe Culvert @ Ch. 8/057, 8/140, 8/417, 8/608, 8/683, 8/852, 8/995
Gravel FillingGravel filling between body wall including cost and conveyance of gravel, labour for filling , watering and compacting etc complete complying with standard specification and as directed by the departmental officer
Pipe Culvert @ Ch. 8/057, 8/140, 8/417, 8/608, 8/683, 8/852, 8/995
Providing and laying reinforced cement comcrete pipe NP3 for culverts on first bedding of granular material in single row incluing fixing collar with cement mortar 1:2 but excluding excavation protection works backfilling concrete and masonry works head walls and parapets
Pipe Culvert @ Ch. 8/057, 8/140, 8/417, 8/608, 8/683, 8/852, 8/995
Construction of Culvert @ Km 9/000 - 10/000 @ Ch. 9170,9243,9600,9737
Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out construction of shoring and bracing removal of stumps and other deleterious material and disposal upto a lead 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material
Pipe Culvert @ Ch. 9/170, 9/243, 9/600, 9/737
Supplying and Filling foundation and Basement with filling sand in layers not more than 15cm, thick well ramed watered and compacted complete complying with standard specification
Pipe Culvert @ Ch. 9/170, 9/243, 9/600, 9/737
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 Cum
Pipe Culvert @ Ch. 9/170, 9/243, 9/600, 9/737
Cement concrete 1:3:6 mix using 20mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers not more than 15cm thick, compacting etc complete complying with standard specifications and as directed for Footings Below Sill Works
Pipe Culvert @ Ch. 9/170, 9/243, 9/600, 9/737
Cement concrete 1:3:6 mix using 20mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers not more than 15cm thick, compacting etc complete complying with standard specifications and as directed for Footings Above Sill Works
Pipe Culvert @ Ch. 9/170, 9/243, 9/600, 9/737
Gravel FillingGravel filling between body wall including cost and conveyance of gravel, labour for filling , watering and compacting etc complete complying with standard specification and as directed by the departmental officer
Pipe Culvert @ Ch. 9/170, 9/243, 9/600, 9/737
Providing and laying reinforced cement comcrete pipe NP3 for culverts on first bedding of granular material in single row incluing fixing collar with cement mortar 1:2 but excluding excavation protection works backfilling concrete and masonry works head walls and parapets
Pipe Culvert @ Ch. 9/170, 9/243, 9/600, 9/737
Provision for Protective works (Panal Type )
Panal Type Retaining Wall Km Km 6/000 - 7/000
Earth work excavation and depositing on bank with intial lead 10m and lift of 2m hard stiff clay, stiff black cotton, hard red earth, shales, moorums and ordinary gravelly soil etc. as per SS 20 A
Cement Concrete 1:4:8 mix using 40mm ISS HBGS including cost and conveyance of all materials and labour charges etc complete
Dry stone masonry using new Rough stones including cost and conveyance of all materials to site and labour charges etc complete
Random rubble masonry in cement mortar 1:5 mix new rough and bond stones including cost and conveyance of all materials labour charges and simultaneous pointing the joints in same morter etc complete
Plastering with cement mortar 1:4 mix to 20 mm thick in all floors with standard specification
Panal Type Retaining Wall Km Km 7/000 - 8/000
Earth work excavation and depositing on bank with intial lead 10m and lift of 2m hard stiff clay, stiff black cotton, hard red earth, shales, moorums and ordinary gravelly soil etc. as per SS 20 A
Cement Concrete 1:4:8 mix using 40mm ISS HBGS including cost and conveyance of all materials and labour charges etc complete
Dry stone masonry using new Rough stones including cost and conveyance of all materials to site and labour charges etc complete
Random rubble masonry in cement mortar 1:5 mix new rough and bond stones including cost and conveyance of all materials labour charges and simultaneous pointing the joints in same morter etc complete
Plastering with cement mortar 1:4 mix to 20 mm thick in all floors with standard specification
Panal Type Retaining Wall Km 8/000 - 9/000
Earth work excavation and depositing on bank with intial lead 10m and lift of 2m hard stiff clay, stiff black cotton, hard red earth, shales, moorums and ordinary gravelly soil etc. as per SS 20 A
Cement Concrete 1:4:8 mix using 40mm ISS HBGS including cost and conveyance of all materials and labour charges etc complete
Dry stone masonry using new Rough stones including cost and conveyance of all materials to site and labour charges etc complete
Random rubble masonry in cement mortar 1:5 mix new rough and bond stones including cost and conveyance of all materials labour charges and simultaneous pointing the joints in same morter etc complete
Plastering with cement mortar 1:4 mix to 20 mm thick in all floors with standard specification
Panal Type Retaining Wall Km 9/000 - 10/000
Earth work excavation and depositing on bank with intial lead 10m and lift of 2m hard stiff clay, stiff black cotton, hard red earth, shales, moorums and ordinary gravelly soil etc. as per SS 20 A
Cement Concrete 1:4:8 mix using 40mm ISS HBGS including cost and conveyance of all materials and labour charges etc complete
Dry stone masonry using new Rough stones including cost and conveyance of all materials to site and labour charges etc complete
Random rubble masonry in cement mortar 1:5 mix new rough and bond stones including cost and conveyance of all materials labour charges and simultaneous pointing the joints in same morter etc complete
Plastering with cement mortar 1:4 mix to 20 mm thick in all floors with standard specification
Provision for Protective works
Panal Type Retaining Wall Km 6/000 - 7/000
Earth work excavation and depositing on bank with intial lead 10m and lift of 2m hard stiff clay, stiff black cotton, hard red earth, shales, moorums and ordinary gravelly soil etc. as per SS 20 A
Cement Concrete 1:4:8 mix using 40mm ISS HBGS including cost and conveyance of all materials and labour charges etc complete
Dry stone masonry using new Rough stones including cost and conveyance of all materials to site and labour charges etc complete
Random rubble masonry in cement mortar 1:5 mix new rough and bond stones including cost and conveyance of all materials labour charges and simultaneous pointing the joints in same morter etc complete
Plastering with cement mortar 1:4 mix to 20 mm thick in all floors with standard specification
Panal Type Retaining Wall Km 9/000 - 10/000
Earth work excavation and depositing on bank with intial lead 10m and lift of 2m hard stiff clay, stiff black cotton, hard red earth, shales, moorums and ordinary gravelly soil etc. as per SS 20 A
Cement Concrete 1:4:8 mix using 40mm ISS HBGS including cost and conveyance of all materials and labour charges etc complete
Dry stone masonry using new Rough stones including cost and conveyance of all materials to site and labour charges etc complete
Random rubble masonry in cement mortar 1:5 mix new rough and bond stones including cost and conveyance of all materials labour charges and simultaneous pointing the joints in same morter etc complete
Plastering with cement mortar 1:4 mix to 20 mm thick in all floors with standard specification
Provision for Protective works
RCC Protective work Km 6/000 - 7/000
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofffer dams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAING WALL.
Vibrated Cement Concrete of Grade M 15 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Levelling Course Below Retaining Wall
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Footings of Retaining Wall
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS BELOW SILL LEVEL
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS ABOVE SILL LEVEL
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for Abutments and wings including cost and conveyance of all materials to work site cost and labour 900mm dia semi spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing etc to drain of the BACKFILL IN BETWEEN THE ABUTMENTS AND RETURNS
Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.
RCC Protective work Km Km 7/000 - 8/000
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofffer dams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAING WALL.
Vibrated Cement Concrete of Grade M 15 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Levelling Course Below Retaining Wall
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Footings of Retaining Wall
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS BELOW SILL LEVEL
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS ABOVE SILL LEVEL
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for Abutments and wings including cost and conveyance of all materials to work site cost and labour 900mm dia semi spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing etc to drain of the BACKFILL IN BETWEEN THE ABUTMENTS AND RETURNS
Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.
Provision for Protective works
RCC Protective work Km 6/000 - 7/000
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofffer dams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAING WALL.
Vibrated Cement Concrete of Grade M 15 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Levelling Course Below Retaining Wall
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Footings of Retaining Wall
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS BELOW SILL LEVEL
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS ABOVE SILL LEVEL
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for Abutments and wings including cost and conveyance of all materials to work site cost and labour 900mm dia semi spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing etc to drain of the BACKFILL IN BETWEEN THE ABUTMENTS AND RETURNS
Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.
RCC Protective work Km 7/000 - 8/000
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofffer dams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAING WALL.
Vibrated Cement Concrete of Grade M 15 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Levelling Course Below Retaining Wall
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Footings of Retaining Wall
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS BELOW SILL LEVEL
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS ABOVE SILL LEVEL
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for Abutments and wings including cost and conveyance of all materials to work site cost and labour 900mm dia semi spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing etc to drain of the BACKFILL IN BETWEEN THE ABUTMENTS AND RETURNS
Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.
RCC Protective work Km 8/000 - 9/000
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofffer dams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAING WALL.
Vibrated Cement Concrete of Grade M 15 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Levelling Course Below Retaining Wall
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Footings of Retaining Wall
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS BELOW SILL LEVEL
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS ABOVE SILL LEVEL
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for Abutments and wings including cost and conveyance of all materials to work site cost and labour 900mm dia semi spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing etc to drain of the BACKFILL IN BETWEEN THE ABUTMENTS AND RETURNS
Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.
RCC Protective work Km 9/000 - 10/000
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofffer dams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAING WALL.
Vibrated Cement Concrete of Grade M 15 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Levelling Course Below Retaining Wall
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Footings of Retaining Wall
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS BELOW SILL LEVEL
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS ABOVE SILL LEVEL
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for Abutments and wings including cost and conveyance of all materials to work site cost and labour 900mm dia semi spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing etc to drain of the BACKFILL IN BETWEEN THE ABUTMENTS AND RETURNS
Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.
Provision for Protective works
RCC Protective work Km 7/000 - 8/000
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofffer dams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAING WALL.
Vibrated Cement Concrete of Grade M 15 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Levelling Course Below Retaining Wall
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for Footings of Retaining Wall
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS BELOW SILL LEVEL
Vibrated Cement Concrete of Grade M 30 Nominal Mix using 20 mm ,12mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for STEM OF RETAINING WALLS ABOVE SILL LEVEL
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for Abutments and wings including cost and conveyance of all materials to work site cost and labour 900mm dia semi spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing etc to drain of the BACKFILL IN BETWEEN THE ABUTMENTS AND RETURNS
Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
VRV CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid