| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.9 LAccepted-AOC | ₹61.9 L | L1 | Accepted-AOC Admitted |
| 2 | L2₹62.3 LRejected-AOC KARUR | ₹62.3 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | K Sundaramoorthy L1 | SPE Construction L2 |
|---|---|---|---|---|---|
| 1.001. Strengthening of the road from santhur santhaipettai-Mahadevagollahalli Km 0/0 - 1/150 H/o.Kattagaram (R-158) - Rs.65.350 Lakhs | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1,380 | Sq.m | 6.35 ₹8,763 | 6.39 ₹8,818.20 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 1,461.67 | Sq.m | 23.32 ₹34,086.14 | 23.45 ₹34,276.16 |
| 4.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 614.74 | Cum | 140.23 ₹86,204.99 | 141.01 ₹86,684.49 |
| 5.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 383.71 | Cum | 340.55 ₹1.3 L | 342.46 ₹1.3 L |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 654.43 | Cu,m | 2,700.21 ₹17.7 L | 2,715.36 ₹17.8 L |
| 7.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 4,362.86 | Sq.m | 86.43 ₹3.8 L | 86.92 ₹3.8 L |
| 8.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc | 4,412 | Sq.m | 20.23 ₹89,254.76 | 20.34 ₹89,740.08 |
| 9.00 | BC 25 mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 110.31 | Cum | 11,657.78 ₹12.9 L | 11,723.17 ₹12.9 L |
| 10.00Provision for Rumble strip with Reflectorining glass beads in Bituminous surface ( Speed barker) including all charges etc complete | |||||
Tender Value
₹65.3 L
EMD Value
₹66,000
Closing Date
20 Feb 2026, 3:00 pmClosed
The Project Director DRDA Krishnagiri
DRDA Krishnagiri
Strengthening of the road from santhur santhaipettai Mahadevagollahalli at Kattagaram in Bargur Block Krishnagiri DT Package No 06 NABARD RIDF 2026-2027
2026_RDTN_657952_1
RocNo_577_2026_R3_12_02_2026
Open Tender
Civil Works - Roads
180 days
Bargur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹66,000
DRDA Krishnagiri
23 Mar 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
16 Feb 2026
1. Strengthening of the road from santhur santhaipettai-Mahadevagollahalli Km 0/0 - 1/150 H/o.Kattagaram (R-158) - Rs.65.350 Lakhs
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc
BC 25 mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for Rumble strip with Reflectorining glass beads in Bituminous surface ( Speed barker) including all charges etc complete
Rumble Strip Ch 10 m
Provision for Sign board 60cm size including all charges etc complete
Providing and Fixing reflective road studs of category A raised pavement markers made out of Poly carbonate / methyl methercrylate / ABS moulded body confirming to ASTM D 788 and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromically values conforming to ASTM D428. The reflective raised pavement markers shall also confirm to the MORTH circular No RW/NH. 33023/10*97- DO .III dt 11.06.97.The height, width and length shall not be less than 15 mm , 90 mm and 100 mm and with minimum re4flective area of 13 sq.cm on each side and the slope to the base shall be 35+/-5 degree . Each reflector shall have a CIL not less than values specified in Table 2 of sais MORTH circular . The strength of detachment of the integrated cylindrical shanks, ( of diameter not less than 19+/-2 mm and height not less than 30+/-2 mm) from the body is to be a minimum value of 500Kgf . Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturers recommandation and complete as directed by the engineer. The marker shall support a load of 13635 Kg tested in accordance with ASTM D4280 and confirming to IRC 35-2015 guidelines and MORTH specification 804 etc complete
Provision For Hazard Marking Board
Provision For Major road ahead
Provision For Rumble Strip Ahead Board
Provision For Stop Sign Board 750mm
Provision For KM Stone
Provision For HM Stone
Construction of New 1.5 Mtr Span Culvert @ ch 658m
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Centering For Deck Slab
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 1.5 : 3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Towards Providing and Fixing 20mm Thick Compressible Fiber Board in Expansion Joinys Completed as Per Drawing and Technical Specification
Towards Providing Laying of tar paper for deck slab including cost and conveyance
Towards providing laying of 110mm pvc pipe for weep holes including cost and conveyance of all materials to site
Maintenance
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_789238.xls
BOQ • 0.41 MB
PB06.pdf
Tender Documents • 0.33 MB
TB06.pdf
Tender Documents • 0.72 MB
Download all tender documents and submit your bid