Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Rank | Status |
|---|---|---|---|
| 1 | 1Rejected-Finance | 1 | Rejected-Finance Rate not approved by SE |
Tender Value
Refer Docs
EMD Value
₹2,100
Closing Date
21 May 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, W.S. Mech. Division, Rewari
Executive Engineer, W.S. Mech. Division, Rewari
Repair of 1 No. LTDB control Panel suitable for 100 HP motor for 35 Cs. Pump at P.H. Patuwas 2
2020_HRY_128234_1
1689/6-A dated 07.05.2020
Open Tender
Pumps/Motors
Works
30 days
Executive Engineer, W.S. Mech. Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Executive Engineer, W.S. Mech. Division, Rewari
₹2,100
Yes
21 Sept 2020
12 May 2020
22 May 2020
12 May 2020
21 May 2020
12 May 2020
90 days
Amount
PVC Copper wire 1.5 mm
MXXB 400 Amp Havells Make
Contractor 300 Amp 3 Pole BCH Make
Timber for 300 Amp. Contractor BCH Make
Backalite sheet 2’x2’x12.5mm
Rewinding of 100 HP ATS complete
CT 200/5 Amp
Credit of old copper scrap
Terms & Conditions:- 1. The tender rate will be inclusive all taxes as applicable. 2. The tender rate will be for F.O.R. destination and inclusive of all incidental charges, enroute & at destination. Nothing extra shall be paid separately. 3. WWC@1% will be deducted from the each bill of the agency. 4. The rate should be inclusive carriage, fitting and allied parts complete in all respect with left over items (if any) as per site requirement. 5. Goods which to be used should be as per sample and conforming to the site condition & also conforming to I.S. Specification. 6. Department will not be responsible for non submission of BOQ / Bid Document online by due date, due to any fault of internet/ E-tendering. 7. Old scrap will be retain by the successful agency. 8. Completion period – completion period is 1 month.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .