| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC HOUSE NO 284 C NANDA BHAWAN MAKARBAG SAHI PO BUXI BAZAR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | ₹4.0 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.0 LSame as L1Rejected-AOC AT PANCHASAKHA NAGAR NEAR HP GAS GODOWN P O DUMUDUMA P S KHANDAGIRI BHUBANESWAR | BHUBANESWAR | ODISHA | ₹4.0 LSame as L1 | L2 | Rejected-AOC Rejected |
| 3 | L3₹4.2 L+₹22,150.34 (5.50%)Rejected-AOC | ₹4.2 L+₹22,150.34 (5.50%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹4.4 L+₹40,233.06 (9.99%)Rejected-AOC AT NEHUR COLONY PO NAYA BAZAR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | ₹4.4 L+₹40,233.06 (9.99%) | L4 | Rejected-AOC Rejected |
Tender Value
₹4.0 L
EMD Value
₹4,000
Closing Date
8 Apr 2026, 5:00 pmClosed
Executive Engineer, CD-I
At Bikash Bhawan, Jagannathlane, Badambadi, Cuttack 753012
Desilting of drain from Deula Sahi Chhaka to Revenew Pond MSWC-I in Ward No. 09
2026_ORULB_127700_4
MC(CMC)CTC_Div-I_No.27/2025-26
Open Tender
Civil Works - Others
Percentage
30 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹4,000
Yes
24 Jun 2026
31 Mar 2026
10 Apr 2026
31 Mar 2026
8 Apr 2026
31 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in Excavation in slushy soil (in water up to 0.60mtr depth requiring the aid of pans & vessels) within 50mtrs initial lead and 1.50mtr initial lift including cost of all labour, materials, T&P required etc complete as per direction of Engineer-in-charge | |||||
| 2Conveyance of excavated materials by head load including loading & unloading and stacking etc complete as per direction of Engineer in charge. | |||||
| 3Construction of Coffer dam by sand bags including cost of all materials sewing and laying drain in proper position and removing the same after desilting work is over etc complete as per the direction of Engineer-in charge. | |||||
| 4Removing slab from the drain and refixing the same after desiliting the drain | |||||
| 5Drain both side MS grill baricade opening and refixing after the complation of desliting work.(Cutting, Welding & Refixing the same including all cost of labour T&P etc complete as per direction of EIC) | |||||
| 6Providing Dewatering from BSWC by using 5HP Pump Set as per specification and direction of Engineer in-Charge. | |||||
| 7Removal of 70% excavate earth and dismantle material away from work site for item no 1 etc complete as per the direction of the Engineer-in-charge. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_586786.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_586786.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .