Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹4.2 L+₹1,580.84 (0.38%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | BSA ASSOCIATES L2 | B SHANAVAS L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged RCC slab etc., | 1.5 | m3 | 3,614.57 ₹5,429.08 Lowest | 3,614.57 ₹5,429.08 Lowest |
| 2.00 | Desilting the exsiting storm water drain | 24 | m3 | 150 ₹3,600 | 111 ₹2,664 Lowest |
| 3.00 | Dismantling the damged cement concrete | 19 | m3 | 540 ₹10,262.16 | 534.82 ₹10,163.72 Lowest |
| 4.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 cum. in volume including rough dressing and dumping the excavated materials away from work site manually within 10m initial lead and 2m initial lift as per the direction of Engineer-in-charge for Drain. | 100 | m3 | 135.86 ₹13,586 Lowest | 135.86 ₹13,586 Lowest |
| 5.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted etc., complete complying with standard specification. | 12 | m3 | 5,590.03 ₹67,080.36 Lowest | 5,590.03 ₹67,080.36 Lowest |
| 6.00 | Supplying and erecting SHUTTTERING including necessary supports for plane surfaces etc, using mild steel sheets and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. | 225 | m2 | 270 ₹60,750 Lowest | 270 ₹60,750 Lowest |
| 7.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm hard broken granite stone jelly for all CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 36 | m3 | 6,319.57 ₹2,27,504.52 Lowest | 6,319.57 ₹2,27,504.52 Lowest |
| 8.00 | PLASTERING with cement mortar 1:5(one cement and five sand by volume) 12mm thick for all internal/external surfaces like super structure, rainwater, ducts, elevation in all floors complying with standard specifications. | 40 | m2 | 301 ₹12,040 | 292.34 ₹11,693.6 Lowest |
| 9.00 | Conveying the debris,earth ,silt etc from the site 0 to 15 km distance at the etc., compelete | 100 | m3 | 165 ₹16,500 | 163 ₹16,300 Lowest |
| 10.00Add :- GST @ 18% | |||||
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
18 Sept 2025, 3:00 pmClosed
The Assistant Commissioner,
North Zone, Coimbatore Corporation, Balasundaram Road,Oppsite Womens Polytechnic
Reconstruction of Storm Water Drain at Ramasamy nagar 1 and Bango street cross lane in Ward no 18, North Zone
2025_MAWS_604155_10
E4/NorthZone/2025-26
Open Tender
Civil Works
Works
90 days
North Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹5,000
14 Oct 2026
15 Sept 2025
19 Sept 2025
15 Sept 2025
18 Sept 2025
15 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .