| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC NO 102 2ND FLOOR SHEIK DAWOOD STREET ERODE 638 001 | ERODE | TAMIL NADU | 638001 | ₹4.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.1 L+₹17,431.47 (3.55%)Rejected-AOC 1831 18 9 606 604 | TIRUVANNAMALAI | TAMIL NADU | 606604 | ₹5.1 L+₹17,431.47 (3.55%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | IRC Constructions L2 | Sakthi Constructions L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 52.56 | cum | 159.9 ₹8,404.34 | 154 ₹8,094.24 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying water carrying with all leads of good water compacting and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 13.14 | cum | 5,283.36 ₹69,423.35 | 5,104.2 ₹67,069.19 Lowest |
| 3.00Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation | |||||
| 3.01 | drain | 262.8 | cum | 317.3 ₹83,386.44 | 306.07 ₹80,435.2 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 40.3 | cum | 6,704.62 ₹2,70,196.19 | 6,477.4 ₹2,61,039.22 Lowest |
| 5.00Sub Total | |||||
| 6.00 | GST 18% | 1 | No | 77,654 ₹77,654 | 74,995 ₹74,995 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
7 Oct 2025, 3:00 pmClosed
Commr
Tiruvannamalai City Municipal corporation
Construction of Strom water drain at Pudhuvaniyakulam street In Thiruvannamalai city corporation
2025_MAWS_610903_1
1331/2025/E1
Open Tender
Civil Works
Works
30 days
Tiruvannamalai City Municipal corporation
Places Refer Tender Notices
2 documents required · 2 mandatory
₹0
₹5,000
31 Aug 2026
3 Oct 2025
7 Oct 2025
3 Oct 2025
7 Oct 2025
3 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .