Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.3 LAccepted-AOC NO 68 ANJANEYA TEMPLE CROSS OPP M S RAMAIAH HOSPITAL NEW BEL ROAD BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | L1 | Accepted-AOC Accepted being L1 | |
| 2 | L2₹42.2 L+₹2.1 L (5.22%)Rejected-Finance NO 650 3RD CROSS MATHIKERE BANGALORE 560 054 | BENGALURU URBAN | KARNATAKA | 560054 | L2 | Rejected-Finance Rejected. Quoted rates are higher than L1 | |
| 3 | L3₹42.5 L+₹2.5 L (6.14%)Rejected-Finance NO 83 THAMMAIAH GARDEN ABBIGERE CHIKKABANAVARA PO BANGALORE 560 090 | BENGALURU URBAN | KARNATAKA | 560090 | L3 | Rejected-Finance Rejected. Quoted rates are higher than L1 | |
| 4 | L4₹43.1 L+₹3.0 L (7.48%)Rejected-Finance D 235 ADG P CHENNAI | CHENNAI | TAMIL NADU | 600001 | L4 | Rejected-Finance Rejected. Quoted rates are higher than L1 | |
| 5 | L5₹43.1 L+₹3.1 L (7.62%)Rejected-Finance 21 9TH MAIN 4TH CROSS GOWDAKEHOLA BAGALAKUNTE NAGASANDRA POST BANGALORE 560073 | BENGALURU URBAN | KARNATAKA | 560073 | L5 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| Sl No | Description | Qty | Unit | A.GOVINDARAJ L8 | SRI MAHALAKSHMI CONSTRUCTIONS L5 | Maruthi constructions L2 | Moulya Builders L7 | devan enterprises L1 | M/S SRI BALAJI ENTERPRISES L3 | ARUNOTHAYA TRADERS L9 | OM ENTERPRISES L6 | Lucky Enterprises L10 | T C KARUNANITHI L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches in soft/loose soil, not exceeding 1.5 Mtr wide and not exceeding 1.5 Mtr in depth and getting out for foundation, laying under ground cables, water pipeline etc and getting out complete all as specified and directed. | 250.36 | CUM | 380 ₹95,136.8 | 425 ₹1,06,403 | 400 ₹1,00,144 | 255 ₹63,841.8 Lowest | 450 ₹1,12,662 | 420 ₹1,05,151.2 | 401 ₹1,00,394.36 | 432 ₹1,08,155.52 | 390 ₹97,640.4 | 400 ₹1,00,144 |
| 2.00 | Returning filling in including spreading, levelling, watering and well ramming in layers and not exceeding 25 cm complete all as specified and directed. | 192.14 | CUM | 140 ₹26,899.6 Lowest | 145 ₹27,860.3 | 158 ₹30,358.12 | 160 ₹30,742.4 | 160 ₹30,742.4 | 140 ₹26,899.6 Lowest | 155 ₹29,781.7 | 150 ₹28,821 | 140 ₹26,899.6 Lowest | 150 ₹28,821 |
| 3.00 | Removing surplus soil to a distance not exceeding 50 Mtr and deposting where directed at a level not exceeding 1.5 Mtr above the starting point all as specified and directed. | 20.73 | CUM | 300 ₹6,219 | 355 ₹7,359.15 | 310 ₹6,426.3 | 360 ₹7,462.8 | 260 ₹5,389.8 Lowest | 320 ₹6,633.6 | 355 ₹7,359.15 | 350 ₹7,255.5 | 320 ₹6,633.6 | 300 ₹6,219 |
| 4.00 | M&L for Ductile Iron Pipe (DI Pipes), ISI marked, Class K-7, 100 mm dia laid in trenches including jointing material such as EPDM Rubber Gasket and suitable type of Grease etc complete all as specified and directed.
Note :- (i) DI fitting/special shall be measured and paid separately.
(ii) Excavation & earthwork shall be measured & paid seperately | 100 | RM | 2,900 ₹2,90,000 | 2,600 ₹2,60,000 | 2,555 ₹2,55,500 | 2,600 ₹2,60,000 | 2,600 ₹2,60,000 | 2,800 ₹2,80,000 | 2,600 ₹2,60,000 | 2,800 ₹2,80,000 | 3,200 ₹3,20,000 | 2,500 ₹2,50,000 Lowest |
| 5.00 | M & L for DI specials and fittings as per IS for spigot and socketed pipes or flanged pipe for water mains, branches lines such as bends (any type radious and angle ) tapers any type (straight, bend,increasing,decresing,or double socket etc) tee pieces, single branch,Y juntion, double branch, cross, including connecting pieces one end flanged and other socket or spigot and bell mouth pieces suitable for rubber joint,tyton joint up to 300 mm bore and conforming to IS-9523: 2000 complete all as specified and directed. | 250 | Kg | 400 ₹1,00,000 | 355 ₹88,750 | 400 ₹1,00,000 | 360 ₹90,000 | 300 ₹75,000 Lowest | 300 ₹75,000 Lowest | 340 ₹85,000 | 355 ₹88,750 | 380 ₹95,000 | 400 ₹1,00,000 |
| 6.00 | Material & Labour as in repair for Construction of Valve chamber having inner dimensions 900 mm x 900 mm x 900 mm with foundation PCC 1:4:8 type D2 using 40mm grade stone aggregate, brick work with sub class B old size bricks built in Cement mortar 1:6, PCC 1:2:4 type B1 using 20mm stone aggregate for Coping, 15 mm thick rendering in CM 1:4 inluding MS cover with locking arrangement all as specified and as directed.
Note :- Chamber Covers shall be measured and paid separately under relevant item of this schedule. | 2 | EACH JOB | 9,400 ₹18,800 | 9,400 ₹18,800 | 10,000 ₹20,000 | 9,600 ₹19,200 | 9,000 ₹18,000 Lowest | 9,400 ₹18,800 | 9,400 ₹18,800 | 9,600 ₹19,200 | 9,500 ₹19,000 | 10,000 ₹20,000 |
| 7.00 | Supply and fixing of Sluice valve of size 100 mm dia Cl body, both ends flanged duly drilled, ISI marked with IS-14846-2000, PN-1.6 having Stainless Steel spindle and check nut including operating wheel fixing with new nuts, bolts, washers and rubber insertion/packing complete all as specified and directed | 1 | Each | 32,000 ₹32,000 | 32,600 ₹32,600 | 35,000 ₹35,000 | 32,000 ₹32,000 | 30,000 ₹30,000 | 27,500 ₹27,500 | 32,500 ₹32,500 | 3,200 ₹3,200 Lowest | 28,900 ₹28,900 | 35,000 ₹35,000 |
| 8.00 | Material and labour for Fabricate valve chamber covers made out of suitable size MS angle/MS plate/flat/rod, hinges, locking arrangement including painting with two coats of synthetic enamel paint over one coat of red oxide primer complete all as specified and directed. | 200 | Kg | 145 ₹29,000 Lowest | 155 ₹31,000 | 160 ₹32,000 | 160 ₹32,000 | 160 ₹32,000 | 160 ₹32,000 | 145 ₹29,000 Lowest | 150 ₹30,000 | 180 ₹36,000 | 160 ₹32,000 |
| 9.00 | Material and Labour for Cutting existing DI pipes of size 80 /100/150/200 mm dia in position for insertion of new tees and socket of size 20/25 mm dia Complete all as specified and as directed. | 1 | Each | 500 ₹500 | 455 ₹455 | 600 ₹600 | 550 ₹550 | 450 ₹450 Lowest | 550 ₹550 | 500 ₹500 | 500 ₹500 | 520 ₹520 | 500 ₹500 |
| 10.00 | Supply & Fix as in replacement GI tubing medium grade of size 150 mm bore with all fittings on wall/ trenches complete including cutting and threading all as required at site complete all as specified and directed.
Note: Excavation & earthwork shall be measured & paid seperately | 12 | RM | 1,950 ₹23,400 | 1,950 ₹23,400 | 1,950 ₹23,400 | 1,945 ₹23,340 | 2,175 ₹26,100 | 1,700 ₹20,400 Lowest | 1,950 ₹23,400 | 2,200 ₹26,400 | 2,000 ₹24,000 | 1,950 ₹23,400 |
Tender Value
Refer Docs
EMD Value
₹73,900
Closing Date
27 Mar 2026, 6:00 pmClosed
Garrison Engineer M AF Jalahalli
Garrison Engineer M AF Jalahalli Bangalore 560013
SPECIAL REPAIR TO RAISING MAIN PIPELINE WITH CONNECTED FITTING FIXTURE AND OLD VINTAGE SECURITY LIGHT PANEL AND OTHER CONNECTED WORK AT CERTAIN PLACES OF AFTC AND AFS JALAHALLI
2026_MES_755450_1
8302/E8
Open Tender
Civil Works
Item Rate
120 days
Garrison Engineer M AF Jalahalli
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Garrison Engineer M AF Jalahalli
₹73,900
Yes
16 Apr 2026
6 Mar 2026
3 Apr 2026
6 Mar 2026
27 Mar 2026
20 Mar 2026
6 Mar 2026 - 13 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches in soft/loose soil, not exceeding 1.5 Mtr wide and not exceeding 1.5 Mtr in depth and getting out for foundation, laying under ground cables, water pipeline etc and getting out complete all as specified and directed. | 250.36 | CUM | - | - |
| 2 | Returning filling in including spreading, levelling, watering and well ramming in layers and not exceeding 25 cm complete all as specified and directed. | 192.14 | CUM | - | - |
| 3 | Removing surplus soil to a distance not exceeding 50 Mtr and deposting where directed at a level not exceeding 1.5 Mtr above the starting point all as specified and directed. | 20.73 | CUM | - | - |
| 4 | M&L for Ductile Iron Pipe (DI Pipes), ISI marked, Class K-7, 100 mm dia laid in trenches including jointing material such as EPDM Rubber Gasket and suitable type of Grease etc complete all as specified and directed.
Note :- (i) DI fitting/special shall be measured and paid separately.
(ii) Excavation & earthwork shall be measured & paid seperately | 100 | RM | - | - |
| 5 | M & L for DI specials and fittings as per IS for spigot and socketed pipes or flanged pipe for water mains, branches lines such as bends (any type radious and angle ) tapers any type (straight, bend,increasing,decresing,or double socket etc) tee pieces, single branch,Y juntion, double branch, cross, including connecting pieces one end flanged and other socket or spigot and bell mouth pieces suitable for rubber joint,tyton joint up to 300 mm bore and conforming to IS-9523: 2000 complete all as specified and directed. | 250 | Kg | - | - |
| 6 | Material & Labour as in repair for Construction of Valve chamber having inner dimensions 900 mm x 900 mm x 900 mm with foundation PCC 1:4:8 type D2 using 40mm grade stone aggregate, brick work with sub class B old size bricks built in Cement mortar 1:6, PCC 1:2:4 type B1 using 20mm stone aggregate for Coping, 15 mm thick rendering in CM 1:4 inluding MS cover with locking arrangement all as specified and as directed.
Note :- Chamber Covers shall be measured and paid separately under relevant item of this schedule. | 2 | EACH JOB | - | - |
| 7 | Supply and fixing of Sluice valve of size 100 mm dia Cl body, both ends flanged duly drilled, ISI marked with IS-14846-2000, PN-1.6 having Stainless Steel spindle and check nut including operating wheel fixing with new nuts, bolts, washers and rubber insertion/packing complete all as specified and directed | 1 | Each | - | - |
| 8 | Material and labour for Fabricate valve chamber covers made out of suitable size MS angle/MS plate/flat/rod, hinges, locking arrangement including painting with two coats of synthetic enamel paint over one coat of red oxide primer complete all as specified and directed. | 200 | Kg | - | - |
| 9 | Material and Labour for Cutting existing DI pipes of size 80 /100/150/200 mm dia in position for insertion of new tees and socket of size 20/25 mm dia Complete all as specified and as directed. | 1 | Each | - | - |
| 10 | Supply & Fix as in replacement GI tubing medium grade of size 150 mm bore with all fittings on wall/ trenches complete including cutting and threading all as required at site complete all as specified and directed.
Note: Excavation & earthwork shall be measured & paid seperately | 12 | RM | - | - |
stage.html
html • 0.07 MB
technical_846160.pdf
techsummary_846160.pdf
finance_846160.pdf
BOQ Comparative Chart
xlsx
finsummary_846160.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_846160.xls
BOQ • 0.34 MB
8302PS.pdf
Additional Documents • 0.90 MB
8302GENPAGE.pdf
Tender Documents • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .