Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹86.6 L
EMD Value
₹86,600
Closing Date
22 Oct 2026, 5:30 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE, Drainage Division, Kendrapada
O/o SE, DD, Kendrapada at Marshaghai
Earth work and Construction of FLB
2026_CEDC_143238_5
DDKPD-05 of 2026-27
Open Tender
Civil Works - Others
Percentage
330 days
Kendrapara
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹86,600
Yes
12 Oct 2026
12 Oct 2026
23 Oct 2026
12 Oct 2026
22 Oct 2026
12 Oct 2026
12 Oct 2026 - 22 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of canal/ drain in both wet and dry condition by mechanical means in hard soil rough dressing and levelling the excavated canal/ drain slopes and bed to design section and depositing the excavated materials in spoil bank or to any other specified area to proper section with all leads, lifts, delifts, handling, re-handling and dewatering etc. complete including construction and specification and direction of the Engineer-in-charge (Borrow area is to be arranged by the Agency at his cost & responsibility) Measurement will be made as per finished level section including cess. | 8,367.29 | One Cum. | 35.6 | ₹2,97,875.52 |
| 2 | Earthwork excavation of foundation of structure by manual/ mechanical means in all kind of soil in wet & dry condition, shoring shuttering, propping bullahs, dewatering the foundation including dressing, leveling, ramming the foundation bed & sides with pneumatic rammers/ fuel operated compactors and removing the excavated materials with all leads, lifts and delifts away from worksite & depositingh the excess materials in spoil banks or any other specified specified spaces by manual/ mechanical means etc. complete with all cost, conveyance andT&P but excluding cost of royality as per direction of the Engineer-in-charge. | 1,298.77 | One Cum. | 37.1 | ₹48,184.37 |
| 3 | Earth work in approved type of soil in approved borrow area by mechinical means loading in to and transportation by mechenical means and unloading the soil within a lead of 1 Km. on properly prepaired and scientifically approved surface including spreading and lebeling the earth in 22.5 Cm layers with cost of labour material and all incidental charges to the work etc. complete as per direction of engineer-in-charge | 1,053 | One Cum. | 271.2 | ₹2,85,573.6 |
| 4 | Labour chrages for straightening, cutting, bending, binding and tying the grills and placing in position for fabrication and fixing of reinforcement including lapping where necessary including supply of binding wire with all leads and lifts from bending yard to placement spot including cost of binding wire as directed by the Engineer-in-chrage. | 256.41 | Per Qntl. | 8,997.3 | ₹23,06,997.69 |
| 5 | Cement Concrete M-15(1:2:4) with 40 mm down graded crusher broken hard granite chips including mixing with concrete mixer, hoisting and laying manually, compacting by vibrator including cost, conveyance, royalty of all materials complete including watering, curing including cost of hoisting and laying complete as per direction of Engineer-in-charge. | 47.51 | One Cum. | 6,278.5 | ₹2,98,291.54 |
| 6 | Concrete M-20 with 20 mm down graded crusher broken hard granite chips including mixing with concrete mixer, hoisting and laying manually, compacting by vibrator including cost, conveyance, royalty of all materials complete including watering etc complete as per the direction of the Engineer -In -charge. | 177.56 | One Cum. | 7,091.2 | ₹12,59,113.47 |
| 7 | R.C.C. M-25 (1:1:2) with 20 mm down graded crusher broken hard granite chips including mixing with concrete mixer, hoisting and laying manually, compacting by vibrator including cost, conveyance, royalty of all materials complete including watering etc. complete as per the direction of the Engineer -In -charge. | 266.14 | One Cum. | 7,499.8 | ₹19,95,996.77 |
| 8 | Filling foundation /plinth with sand including watering & ramming including cost, conveyances and royality of all materials complete as per direction of Engineer-in-charge. | 310.5 | One Cum. | 953.2 | ₹2,95,968.6 |
| 9 | Filling foundation and plinth with excavated materials including watering and ramming including cost, conveyance & royality of all materials complete. as directed by the Engineer-in-charge. | 432.93 | One Cum. | 24.7 | ₹10,693.37 |
| 10 | Providing rough stone dry packing in appron and revetments with hard stone boulder size 15 cm to 30 cm size in any direction free from weathered skin surface to prooer line and levelincluding filling the interstices with required broken stone spalls with all leads, lifts and delifts including cost, carriage, royality, taxes of all materials and cost of labour and T&P for dressing of earth work in bed and slopes & trimming to the required profile including dewatering if required etc.complete with all general and incidental charges as per drawing, design and specification and per the direction of the Engineer-in -charge. | 145.45 | One Cum. | 2,820.9 | ₹4,10,299.9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
TB15.pdf
Tender Documents • 15.09 MB
BOQ_613552.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .