| 1 | L1₹47.6 LAccepted-AOC | L1 | Accepted-AOC Being Lowest Bider | |
| 2 | L2₹52.5 L+₹3.5 L (7.06%)Rejected-Finance | L2 | Rejected-Finance Being other than Lowest Bidder | |
| 3 | L3₹53.0 L+₹4.0 L (8.16%)Rejected-Finance | L3 | Rejected-Finance Being other than Lowest Bidder | |
| 4 | L4₹56.1 L+₹7.1 L (14.5%)Rejected-Finance | L4 | Rejected-Finance Being other than Lowest Bidder | |
| 5 | L5₹57.7 L+₹8.7 L (17.7%)Rejected-Finance | L5 | Rejected-Finance Being other than Lowest Bidder |
| Sl No | Description | Qty | Unit | Srinivasa Consructions L6 | Haasith constructions L1 | Mavee Syndicate L9 | omsai thermax engineers L8 | SUN LIGHT HOUSE L4 | VS ENTERPRISES L7 | Srinivash Engineers L3 | vvcenterprises L2 | M/s. A&T Enterprises L5 | sree venkateswara enterprises L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5 m width and not exc 1.5 m in depth and getting out in hard/ dense soil for removing/ laying of pipe line complete all as specified and directed. | 670 | CUM | 650 ₹4,35,500 | 325 ₹2,17,750 | 325 ₹2,17,750 | 400 ₹2,68,000 | 312 ₹2,09,040 | 325 ₹2,17,750 | 400 ₹2,68,000 | 350 ₹2,34,500 | 306 ₹2,05,020 Lowest | 330 ₹2,21,100 |
| 2.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in any type of soil complete all as specified and directed. | 590 | CUM | 100 ₹59,000 | 125 ₹73,750 | 150 ₹88,500 | 150 ₹88,500 | 144 ₹84,960 | 150 ₹88,500 | 90 ₹53,100 Lowest | 140 ₹82,600 | 144 ₹84,960 | 160 ₹94,400 |
| 3.00 | Removing excavated material (soils) n exc.50m and depositing where directed at a level n exc.1.5 m above the starting point complete all as specified and directed. | 80 | CUM | 120 ₹9,600 | 150 ₹12,000 | 220 ₹17,600 | 180 ₹14,400 | 212 ₹16,960 | 220 ₹17,600 | 55 ₹4,400 Lowest | 260 ₹20,800 | 207 ₹16,560 | 220 ₹17,600 |
| 4.00 | Repair/ rectification of leakages to water supply distribution lines 15 mm bore to 25 mm bore GI/ PPR tubing with provision of necessary excavation, cutting of hard standing, returning and filling in as required, tightening of loose joints of union, elbow, sockets etc, threading if required including replacement of GI unions/ sockets/ nipples as required at site complete all as specified and directed. | 20 | JOB | 300 ₹6,000 | 400 ₹8,000 | 475 ₹9,500 | 500 ₹10,000 | 451 ₹9,020 | 450 ₹9,000 | 250 ₹5,000 Lowest | 460 ₹9,200 | 450 ₹9,000 | 500 ₹10,000 |
| 5.00 | All as per item No 4.00 above but for GI tubing 40 mm bore to 50 mm bore | 20 | JOB | 500 ₹10,000 Lowest | 500 ₹10,000 Lowest | 575 ₹11,500 | 600 ₹12,000 | 532 ₹10,640 | 550 ₹11,000 | 500 ₹10,000 Lowest | 560 ₹11,200 | 540 ₹10,800 | 568 ₹11,360 |
| 6.00 | All as per item No 4.00 here-in-before but for GI tubing 80 mm bore to 100 mm bore. | 6 | JOB | 700 ₹4,200 | 1,000 ₹6,000 | 1,100 ₹6,600 | 1,200 ₹7,200 | 1,030 ₹6,180 | 1,100 ₹6,600 | 600 ₹3,600 Lowest | 1,160 ₹6,960 | 1,080 ₹6,480 | 1,100 ₹6,600 |
| 7.00 | Attending routine complaints of external water supply including rectification of minor defects by taking down of existing GI/ PPR tubing up to 25 mm bore, cutting/ threading and making joints and cleaning for any blockages, opening of float valve of service tanks, cleaning and fixing the same in its position, replacement of jumper valve/ packing sheet of gate valve and including replacement of GI unions/ sockets/ nipples etc as required at site complete all as specified and directed. | 30 | EACH JOB | 350 ₹10,500 | 300 ₹9,000 Lowest | 350 ₹10,500 | 450 ₹13,500 | 339 ₹10,170 | 300 ₹9,000 Lowest | 400 ₹12,000 | 340 ₹10,200 | 360 ₹10,800 | 360 ₹10,800 |
| 8.00 | All as per item No 7.00 above but for GI tubing 40 mm bore to 50 mm bore. | 30 | EACH JOB | 550 ₹16,500 | 400 ₹12,000 Lowest | 450 ₹13,500 | 500 ₹15,000 | 444 ₹13,320 | 400 ₹12,000 Lowest | 500 ₹15,000 | 440 ₹13,200 | 405 ₹12,150 | 450 ₹13,500 |
| 9.00 | Attending complaints of BLOCKAGE OF WATER PIPE LINES / NO WATER SUPPLY AT ANY kind of ACCOMODATION (MARRIED / OTM/ single / multi story building), IDENTIFY THE FAULTS including rectification by taking down of existing GI/ PPR tubing up to 80 mm bore, cutting/ threading and making joints and cleaning for any blockages, opening of float valve of service tanks, cleaning and fixing the same in its position, replacement of valve/ packing sheet of gate valve and including replacement of GI unions/ sockets/ nipples etc as required at site TO RESTORE WATER SUPPLY complete all as specified and directed. | 8 | EACH JOB | 750 ₹6,000 Lowest | 6,000 ₹48,000 | 9,000 ₹72,000 | 10,000 ₹80,000 | 8,455 ₹67,640 | 9,000 ₹72,000 | 10,000 ₹80,000 | 9,040 ₹72,320 | 9,900 ₹79,200 | 9,000 ₹72,000 |
| 9.01Notes for Sl item No 4 to 9 :- (a) The contractor will be allotted complaints at MES complaint cell on requirement basis on all working days including Sundays and holidays and sufficient tradesman / resources will be deployed by him/ her for completion of day to day complaints within 12 hours from the time of reporting. Any delay beyond above mentioned time limit without intimation of genuine cause, penalties will be recovered twice of the quoted rate for each un-attended complaint. (b) A detailed log book of complaints with completion/ non-completion remarks from users/ MES will be maintained by the contractor and the same will be updated on daily basis in consultation with JE E&M/ Engr-in-Charge. (c) The contractor will make suitable arrangement for emergency complaints and will notify authorised representative/ Engr-in-Charge about extraordinary circumstances for probable non-completion or delay in rectification of complaints beyond stated time limit set for disposal of complaint. In case of any dispute the decision of accepting officer will be final and binding in this regard. | |||||||||||||
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
20 Jun 2026, 6:00 pmClosed
GE (UTILITY) SECUNDERABAD
GE (Utility) Secunderabad, Mudfort - 500003
REPAIR AND RECTIFICATION OF DAY TO DAY COMPLAINTS OF EXTERNAL WATER SUPPLY DISTRIBUTION SYSTEM COMPRISING CI, DI, GI, PPR AND CPVC PIPELINE NETWORKS, SLUICE VALVES, NON-RETURN VALVES, AIR VALVES, VALVE PIT CHAMBERS, SUPPORTS ALONG WITH ALL CONNECTED
2026_MES_768730_1
GE (U)/SEC/TOKEN/M21 OF 2026-27
Open Tender
Civil Works - Water Works
Item Rate
180 days
SECUNDERABAD
As per tender documents
8 documents required · 8 mandatory
₹500
GE (UTILITY) SECUNDERABAD
₹96,000
Yes
10 Aug 2026
30 May 2026
27 Jun 2026
30 May 2026
20 Jun 2026
13 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exceeding 1.5 m width and not exc 1.5 m in depth and getting out in hard/ dense soil for removing/ laying of pipe line complete all as specified and directed. | 670 | CUM | 99 | ₹66,330 |
| 2 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in any type of soil complete all as specified and directed. | 590 | CUM | 99 | ₹58,410 |
| 3 | Removing excavated material (soils) n exc.50m and depositing where directed at a level n exc.1.5 m above the starting point complete all as specified and directed. | 80 | CUM | 99 | ₹7,920 |
| 4 | Repair/ rectification of leakages to water supply distribution lines 15 mm bore to 25 mm bore GI/ PPR tubing with provision of necessary excavation, cutting of hard standing, returning and filling in as required, tightening of loose joints of union, elbow, sockets etc, threading if required including replacement of GI unions/ sockets/ nipples as required at site complete all as specified and directed. | 20 | JOB | 99 | ₹1,980 |
| 5 | All as per item No 4.00 above but for GI tubing 40 mm bore to 50 mm bore | 20 | JOB | 99 | ₹1,980 |
| 6 | All as per item No 4.00 here-in-before but for GI tubing 80 mm bore to 100 mm bore. | 6 | JOB | 99 | ₹594 |
| 7 | Attending routine complaints of external water supply including rectification of minor defects by taking down of existing GI/ PPR tubing up to 25 mm bore, cutting/ threading and making joints and cleaning for any blockages, opening of float valve of service tanks, cleaning and fixing the same in its position, replacement of jumper valve/ packing sheet of gate valve and including replacement of GI unions/ sockets/ nipples etc as required at site complete all as specified and directed. | 30 | EACH JOB | 99 | ₹2,970 |
| 8 | All as per item No 7.00 above but for GI tubing 40 mm bore to 50 mm bore. | 30 | EACH JOB | 99 | ₹2,970 |
| 9 | Attending complaints of BLOCKAGE OF WATER PIPE LINES / NO WATER SUPPLY AT ANY kind of ACCOMODATION (MARRIED / OTM/ single / multi story building), IDENTIFY THE FAULTS including rectification by taking down of existing GI/ PPR tubing up to 80 mm bore, cutting/ threading and making joints and cleaning for any blockages, opening of float valve of service tanks, cleaning and fixing the same in its position, replacement of valve/ packing sheet of gate valve and including replacement of GI unions/ sockets/ nipples etc as required at site TO RESTORE WATER SUPPLY complete all as specified and directed. | 8 | EACH JOB | 99 | ₹792 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
TM21_8624_Tender.pdf
Tender Documents • 0.55 MB
BOQ_860868.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .