Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC NO 12B SESHADRIPALAYAM STREET KANCHEEPURAM 631503 | KANCHEEPURAM | KANCHEEPURAM | TAMIL NADU | 631503 | ₹10.5 L Quoted ₹12.3 L | L1 | Accepted-AOC Accepted |
| 2 | Rejected-Technical NO 9 11 MIG TNEB NEW VANAVIL FLATS AYAPAKKAM CHENNAI 600 077 | CHENNAI | CHENNAI | TAMIL NADU | 600077 | - | - | Rejected-Technical Evaluation Rejected |
| 3 | Rejected-Technical | - | - | Rejected-Technical Evaluation Rejected |
| 4 | Rejected-Technical | - | - | Rejected-Technical Evaluation Rejected |
| Sl No | Description | Qty | Unit | M S SIVAKUMAR L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation in hard stiff clay,block cotton hard red earth shales, murram, gravel, stoney earth and earth mixed with small size boulders etc complete. | 137.2 | m3 | 150 ₹20,580 Lowest |
| 2.00 | Providing sand filling in foundation, including cost of sand, filling charges, watering and consolidation etc complete. | 7 | m3 | 2,000 ₹14,000 Lowest |
| 3.00 | Providing foundation concrete in PCC 1:3:6, using 40 mm HBG stone including cost of cement, and all materials labour, lead, lift etc complete. | 7 | m3 | 7,000 ₹49,000 Lowest |
| 4.00 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for raft concrete including cost of all materials,curing,labour ,lead,lift etc.complete. | 16.12 | m3 | 12,000 ₹1,93,440 Lowest |
| 5.00 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for Footing with form work including cost of all materials,curing,labour ,lead,lift etc.complete. | 22.58 | m3 | 20,000 ₹4,51,600 Lowest |
| 6.00 | Supplying fabricating and placing in position of steel reinforcements including cost of steel binding wire labour for cutting bending tying placing in correct position transport lead lift etc complete as per standard specification. | 2.32 | MT | 52,000 ₹1,20,640 Lowest |
| 7.00 | Supply and assembling template for switch WC columns and CT support structure including cost of all labour lead and lift etc complete . as directed by the dept. Engineer at site. | 7 | Nos | 1,000 ₹7,000 Lowest |
| 8.00 | Supplying and fixing 24mm dia GI foundation bolt of 0.75 length, with 10cm thread at top and 15cm ‘L’at bottom cost of materials, fabrication, with ho dip galvanising etc. Complete as per standard specification. | 56 | Nos | 1,000 ₹56,000 Lowest |
| 9.00 | Supplying fabrication in 50 x 50 x 6, GI angle as per drawing and standard specification for cable duct including cost of all materials, labour, lead, lift, etc. Complete as per standard specification. | 114.84 | kg | 120 ₹13,780.8 Lowest |
| 10.00 | Supplying and filling with quarry dust | 4 | m³ | 600 ₹2,400 Lowest |
Tender Value
Refer Docs
EMD Value
₹10,610
Closing Date
23 Feb 2026, 2:00 pmClosed
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
Ottiyambakkam 400/230/110 KV Substation
2026_EB_654233_1
OT-96/2025-26 of SE/GCC-II
Open Tender
Civil Works
Works
120 days
Ottiyambakkam
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹10,610
Yes
22 Jul 2026
10 Feb 2026
24 Feb 2026
10 Feb 2026
23 Feb 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in hard stiff clay,block cotton hard red earth shales, murram, gravel, stoney earth and earth mixed with small size boulders etc complete. | 137.2 | m3 | - | - |
| 2 | Providing sand filling in foundation, including cost of sand, filling charges, watering and consolidation etc complete. | 7 | m3 | - | - |
| 3 | Providing foundation concrete in PCC 1:3:6, using 40 mm HBG stone including cost of cement, and all materials labour, lead, lift etc complete. | 7 | m3 | - | - |
| 4 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for raft concrete including cost of all materials,curing,labour ,lead,lift etc.complete. | 16.12 | m3 | - | - |
| 5 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for Footing with form work including cost of all materials,curing,labour ,lead,lift etc.complete. | 22.58 | m3 | - | - |
| 6 | Supplying fabricating and placing in position of steel reinforcements including cost of steel binding wire labour for cutting bending tying placing in correct position transport lead lift etc complete as per standard specification. | 2.32 | MT | - | - |
| 7 | Supply and assembling template for switch WC columns and CT support structure including cost of all labour lead and lift etc complete . as directed by the dept. Engineer at site. | 7 | Nos | - | - |
| 8 | Supplying and fixing 24mm dia GI foundation bolt of 0.75 length, with 10cm thread at top and 15cm ‘L’at bottom cost of materials, fabrication, with ho dip galvanising etc. Complete as per standard specification. | 56 | Nos | - | - |
| 9 | Supplying fabrication in 50 x 50 x 6, GI angle as per drawing and standard specification for cable duct including cost of all materials, labour, lead, lift, etc. Complete as per standard specification. | 114.84 | kg | - | - |
| 10 | Supplying and filling with quarry dust | 4 | m³ | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_784490.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].