Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC SONITPUR | ASSAM | 784001 | ₹4.2 L | L1 | Accepted-AOC Aoc Issue |
| 2 | L2₹4.4 L+₹17,812.63 (4.21%)Rejected-Finance | ₹4.4 L+₹17,812.63 (4.21%) | L2 | Rejected-Finance L2 Bidder |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Incomplete/Wrong affidavit |
Tender Value
₹4.5 L
EMD Value
₹44,532
Closing Date
28 Feb 2026, 3:00 pmClosed
Chief Engineer
Chief Engineer Office, KNN, Motijheel
Construction of toilets in Laxman Bagh Officers Colony under Zone 04.
2026_NNKAN_1120297_1
666/AA-4/25-26
Open Tender
Civil Works
Percentage
30 days
Laxman Bagh Officers Colony
Please refer Tender documents.
1 document required · 1 mandatory
₹590
₹44,532
6 Aug 2026
26 Feb 2026
28 Feb 2026
26 Feb 2026
28 Feb 2026
26 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5 in in width as well 10 sqm on plan including getting out and disposal of | 4 | cum | 174 | ₹696 |
| 2 | Providing and laying in position cement cost of centering and shuttering-All work cocrets of specified grade excluding the up to the pillinth level in 1:4:8 (1 cement: 4 coerse sand (zone): 8 graded brick aggregate 40 mm nominal size | 1.25 | cum | 5,220 | ₹6,525 |
| 3 | Reinforced cement cocrete work in walls (any thickness), Including attached pillasters, buttreses, plinth and string courses, fillets & in coloumns, pillars, piers, abutments, posts and struts etc. | 2.58 | cum | 8,600 | ₹22,188 |
| 4 | Reinforced cement concrete work in beam, suspended floors, roofs having siope sp to 15" landing, bolconies, window sills, stair cases and spiral stair shelves, chajjas, linseis, bands, plan, cases above plinth up to floor five, level | 1.29 | cum | 8,720 | ₹11,248.8 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, completeupto pinth level. Thermo placing in position and binding all complete up to plinth level thermo | 303.78 | kg | 72 | ₹21,872.16 |
| 6 | Brick work with common bunit clay (non modular) bricks of class-150 in foundation and plinth in cement mortar 1:4 (1 cement 4 coarse sand | 4.76 | cum | 6,600 | ₹31,416 |
| 7 | Construction of manhole chamber of 0.60x0.60x0.90m internal size with b/w plaster, cover, C.I. sheet, labour T&P etc required for proser completion of work | 2 | nos | 7,464 | ₹14,928 |
| 8 | Providing and fixing of Chlorinatad polyviny chloride (CPVC) pipes,having thermal stability for hot & cold 25mm Nominal outer dia pipes | 17 | rmt | 399 | ₹6,783 |
| 9 | Prowinding and fixing of white vitreous China pedestal type water clonet Europeon type W.C. Pan with seat and Providing and fixing wash with C Brackets, 15mm CP. Brast pillar tap 32mm C.P. Brass waste pipe of standant parternating of foting and | 1 | nos | 8,503 | ₹8,503 |
| 10 | Providing and fixing wash basin with C.I. Brakckets, 15mm C.P. Brass pillar taps, 32mm C.P. Brass waste pipe of standard pattern, including painting of fittings and | 1 | nos | 2,716 | ₹2,716 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2083834.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.05 MB
BOQ_2083834.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .