| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-Finance KATWA WEST BENGAL | ₹4.7 L | L1 | Accepted-Finance Accept |
| 2 | L2₹4.7 LAccepted-Finance BARDHAMAN | WEST BENGAL | 713364 | ₹4.7 L | L2 | Accepted-Finance Accept |
| 3 | L3₹4.7 LRejected-Finance CHAR GHOSHHAT FROM RANJIT HAWLADER HOUSE OF BIMAL DEBNATH HOUSE WARD NO 11 UNDER KATWA MUNICIPALITY WEST BENGAL | ₹4.7 L | L3 | Rejected-Finance Reject |
Tender Value
₹4.7 L
EMD Value
₹9,362
Closing Date
13 Mar 2026, 3:00 pmClosed
CHAIRMAN KATWA MUNICIPALITY
CHAIRMAN KATWA MUNICIPALITY
Construction of RCC Drain at Paltia Road frpm the land of Answar Mondal, via the house of Sakil Mohammad, uptoThr house of Nur Alam, at ward no-04 Under katwa Municipality
2026_MAD_1017593_15
WBMAD 93 (DEV/15TH F.C /KM) 2025-2026
Open Tender
CIVIL WORKS
31 days
Paltia Road
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹9,362
Yes
5 Jun 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
Earth Work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, leveling, and dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
(A) Filling in foundation trenches or plinth with silver sand in layer not exceeding 150 mm as directed and consolidating same by through saturation with water ramming complete including the cost of supply of sand (Payment to be made on measurement of finished quantity of work).
Single brick flat soiling of jhama bricks including ramming and dressing bed to proper level and filling joint with powered earth or local sand.
(I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (A) [Pakur Variety] (a) 1:3:6 proportion
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every inter-section, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m.
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or roughening of concrete surface, including throating, nosing and drip course where necessary (ground floor). 15mm thick. (1:4)
Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drains etc.
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement (iii) 35 mm. thick
Earth work in filling foundation trenches or plinth with good earth in layer not exceeding 150 mm including watering and ramming etc.layer by layer complete. (Payment to be made on basis of measurement of finished quantity of work).With earth obtained from excavation of foundation.
Gr. Floor -
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
2911FORM.pdf
Tender Documents • 1.48 MB
BOQ_2500995.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid