Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance NE 98 VISHNU GARDEN STREET NO 3 VISHNU GARDEN WEST DELHI DELHI 110018 UDYAM DL 05 0010044 | WEST DELHI | DELHI | 110018 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
18 Mar 2021, 3:00 pmClosed
OFFICE OF THE EXECUTIVE ENGINEER (SDW)-III
STP YAMUNAVIHAR, WAZIRABAD ROAD DELHI-110053
Servicing and Dehydration of 315 KVA Transformer No.1 and 315 KVA Transformer No.02 make (Patson) installed at Ghonda-I SPS. (re-invite)
2021_DJB_201396_1
NIT No. 11 (20-21)
Open Tender
Miscellaneous Works
Works
45 days
Ghonda-I SPS.
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Ac No. 50448339804
₹6,000
Yes
10 May 2021
11 Mar 2021
18 Mar 2021
11 Mar 2021
18 Mar 2021
11 Mar 2021
Disconnecting of HT supply from main HT panel after proper switching off 11 KV VCB discharging the supply. Complete draining out of transformer oil from transformer to empty oil drum by oil machine, dismantling of conservator tank all protection relays cable end boxes vent pipes and other items as required.
Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precautions to prevent the winding damage as required, cutting of old overheated insulation of the winding and re-insulation material and proper taping etc.
Replacement of top cover gasket, vertical vent gasket & missing hardware to stop the oil leakage.
Replacement of silica gel.
Complete assembling of transformer cleaning of complete transformer tightening of all connection of incomer and outgoing side and testing & checking of the IR values with megger of winding and cable on both ends with HI Pod machine.
Replacement of transformer oil make: Savita/Power.
P/Fixing of winding protection pad.
Dehydration & filtration of complete transformer oil and checking the die-electric strength upto 50 KV at site as required.
Complete cleaning and chemically washing of oily and muddy transformer body and painting of the transformer with enamel paint.
Complete testing of transformer on load and off load.
GOGIA BROTHERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .