Loading…
Loading…
Tender Value
₹35.2 L
EMD Value
₹70,400
Closing Date
23 Feb 2026, 2:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
75 days
Expenditure
Capital (Works)
ELECTRICAL
12 conditions · 1 needing a document upload
Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. Please submit a certificate in the prescribed format (please download the format from the link given below). Non submission of the certificate, or submission of certificate either not properly filled in, or in a format other than the prescribed format shall lead to summary rejection of your offer. (Click here to download the Format of Self Certification)
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
55 conditions · 15 needing a document upload
Whether the List of works on hand indicating description of work, contract value and approximate value of balance work yet to be done and date of award, has been uploaded?
Whether the List of plant and machinery available on hand (Own) and proposed to be inducted (Own and hired) for the subject work, has been uploaded?
Whether the documents related to particulars of technical staff to be employed on the work has been uploaded?
Whether the documents related to sole proprietorship, Partnership firm, Company/Co-operative society etc. has been uploaded?
COMPLETION TIME: The work must be completed within 6 Months from the date of issue of acceptance letter. The contractor shall state clearly at the earliest possible time in which they can commence, complete the work and handing over to the Railway administration. The period stipulated by the contractor shall not under any circumstances be altered subsequently. Delay in booking, materials or making arrangements for accommodation of staff and materials shall not be an excuse for delay in executing the contract.
Tenderer should submit the Bank details such as Name of the Bank along with Bank Branch code, account No., IFSC Code and PAN Number etc.
Other points, in details, are furnished in the Document Section.
All the bidders/tenders should ensure that they are GST complaint and their quoted tax structure/rates are as per GST Law.(Please upload certificate of GSTIN registration).
Please Submit your bank details.
The Authority reserves the right of declining / accepting the Tender or re-tendering without assigning any reason.
RELEASED MATERIALS: The released materials if any must be deposited with proper challan and proper documents.
Electric Contractor License: The contractor shall fulfill valid Electrical Contractor License requirement as per IE Rule 1956 clause no-45 along with Electrical Supervisory License. The same shall be submitted along with the offer, failing which the offer will summarily rejected.
INSPECTION AND ACCEPTANCE: Materials of scheduled 'A' shall be offered for inspection to the authorized representative of Dy. CEE (W)/E. Rly./LLH and on his written acceptance the same are to be fitted at site.
TERMS OF PAYMENT: Subject to any deduction or recoveries which the Railway Administration may be entitled to make under the contract, the contractor shall unless otherwise agreed to be entitled to get the payments according to condition stipulated below: (i) Payment against the work shall be made in 02 (Two) spell against satisfactory completion of the work duly certified by the competent authority. (ii) The Contractor will have to submit bills in triplicate along with the actual work done certificate/ Joint witnessing certificate by firm's representative and the supervisor-in-charge of the work. (iii) The Rly. at their discretion may make payment to the contractor through ECS/ NEFT.
Bid Security deposited by the successful tenderer will be forfeited if the tenderer shows resiliencies form his/her/their offer or modify the terms and condition thereof in a manner not acceptable to the Railway within the stipulated period of validity of offer. If the successful tenderer fails to execute the agreement bond/security deposit or start the work within the stipulated period, or as may be stipulated in the letter of acceptance, the entire earnest money shall be liable to be forfeited to the Rlys. Earnest money is liable to be forfeited in cases where any of the statements/declarations/information made by the tenderer is proved wrong/false/incomplete or such as to withhold any information relevant for consideration of the tenderer.
The amount of Bid Security will be refunded to the un-successful tenders after finalization of the tender. The earnest money remitted by the successful tenderer, will be refunded on deposition of full security money of the contract or may be adjusted against security deposit.
As per provision of IR GCC, 2022; the Bid Security shall be deposited either in cash through e payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure-VIA and shall be valid for a period of 90 days beyond the bid validity period. In case, submission of Bid Security in the form of Bank Guarantee, following shall be ensured: (i) A scanned copy of the Bank Guarantee shall be uploaded on e-Procurement Portal (IREPS) while applying to the tender. (ii) The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document within 5 working days of deadline of submission of bids. (iii) Non submission of scanned copy of Bank Guarantee with the bid on e-tendering portal (IREPS) and/or non submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid. (iv) The Tender Security shall remain valid for a period of 90 days beyond the validity period for the Tender. (v) The details of the BG, physically submitted should match with the details available in the scanned copy and the data entered during bid submission time, failing which the bid will be rejected. (vi)The Bank Guarantee shall be placed in an envelope, which shall be sealed. The envelope shall clearly bear the identification "Bid for the ***** Project* and shall clearly indicate the name and address of the Bidder. In addition, the Bid Due Date should be indicated on the right hand top corner of the envelope. (vii) The envelope shall be addressed to the officer and address as mentioned in the tender document. (viii) If the envelope is not sealed and marked as instructed above, the Authority assumes no responsibility for the misplacement or premature opening of the contents of the Bid submitted and consequent losses, if any, suffered by the Bidder.
While processing payment of any 'On Account Bill' or 'Final Bill' or release of 'Advances' or 'Performance Guarantee/ Security Deposit' etc. contractor has to submit a certificate regarding uploading/updation of the correct details of contract labours engaged in connection with the subject contract and payments made during the wage period in Railway's Shramikkalyan portal at ''www.shramikkalyan.indianrailways.gov.in'' till........Month..........Year............
Police Verification of Antecedents of Contractual Staff through online mode as per Sr. DSC /RPF/ER/HWH's letter No. HWH/Contractual Labour/2024 dt. 26.11.2024 (Letter uploaded in Document Section).
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
LLH- Supply, fabrication, erection and installation of Rain Guards of Electrical accessories fitted at different pillars of the Shed of C & W Workshop, Eastern Railway, Liluah.
W_LLH_26_2025-26
W_LLH_26_2025-26
Open
Works - General
6 Months
Howrah, West Bengal
₹0
₹70,400
23 Feb 2026
29 Jan 2026
9 Feb 2026
5 items across 1 schedule · ₹29,80,910.4 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Supply, fabrication, installation and commissioning of Aluminum Sheet of 2 mm thickness as per installation site conditions. Size: 530 x 1660 x 2 = 1.760 M² 570 x 1200 x 2 = 1.368 M² 1150 x 510 x 1 = 0.587 M² 480 x 1300 x 2 = 1.248 M² Total: 4.963 M ² Weight: 4.963 M² x 2.7 kg. wt. per M² = 13.400 Kg. Unit price of Supply material = 400.00 Per KG. (S= 4690.00, L= 1407.00) | Job | 184.00 | 6,097 | 11,21,848 |
| 2 | Supply, fabrication, installation and commissioning of Flat M.S Bar as per IS: 1079 Gr HR1: 50 x6 as per installation site conditions. 1180 x 2 = 2.360M 1500 x 2 = 3.000M 760x 2 = 1.52M 1260 x 2 = 2.52M 1100 x 2= 2.20 M 920 x 2= 1.84M 1100 x 1 =1.10 M 730 x 1 = 0.73M Total: 15.27M Weight:15.27 M x 2.4 Kg per M = 36.648 Kg. Unit price of Supply material- 100.00 Per KG. (S= 3664.80, L= 1100.00) | Job | 184.00 | 4,764.8 | 8,76,723.2 |
| 3 | Supply, fabrication, installation and commissioning of Angle: 40 x 40 x6 as per IS: 1079 Gr HR1 (Make: SAIL) as per installation site conditions Size: 0.600 x 6 =3.6 M 0.280 x 2= 0.56M 0.380 x 4 = 1.52M 0.430 x 2 = 0.860 M 0.850 x 2 = 1.700 M 0.300 x 2 = 0.600 M 0.380 x 4 = 1.52M Total: 10.36 M Weight:10.36 M x 3.5 Kg per M = 36.26 Kg. Unit price of Supply material- 100.00 Per KG. (S= 3626.00, L= 1087.80) | Job | 184.00 | 4,713.8 | 8,67,339.2 |
| 4 | Supply of 25mm S.S screw(HP/Tata) for fixing the Aluminum Sheet with Angle: 35 Nos, required for each job. Unit price of supply Material: Rs 5.00 per Pc. (S= 175.00, L= 50.00) | Job | 184.00 | 225 | 41,400 |
| 5 | Painting Work: After all fabrication work, Two Coat of ANTI-RUST & ANTI- CORROSION Primer and 02 Coat final ENAMEL paint of Asian/Berger/Dulux Make will be done. (S= 300.00, L= 100.00) | Job | 184.00 | 400 | 73,600 |
| Schedule total | ₹29,80,910.4 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
VerificationofContractualStaff.pdf
ATTACHMENT
RBA__48_09052018.pdf
ATTACHMENT
RBA_10_21022018.pdf
ATTACHMENT
Undertaking2022.pdf
ATTACHMENT
TenderForm.pdf
ATTACHMENT
GeneralCompliance2022.pdf
ATTACHMENT
CommercialCompliance2022.pdf
ATTACHMENT
GCCApril-2022.pdf
ATTACHMENT
OnlinePoliceVerification.pdf
ATTACHMENT
BankGuaranteeBondAnnexure-VIA.pdf
ATTACHMENT
AnnexureV.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .