| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93.3 LAccepted-AOC 22 2 BAKRAHAT ROAD THAKURPUKUR KOLKATA 700063 | KOLKATA | KOLKATA | WEST BENGAL | 700063 | L1 | Accepted-AOC QUOTED RATE LOWEST AND REASONABLE. | |
| 2 | L2₹99.0 L+₹4.5 L (4.75%)Rejected-Finance 10 1 GROUND FLOOR WEST GHOSH PARA JAGATDAL JAGATDAL JAGATDAL NORTH 24 PARGANAS WEST BENGAL 743125 | 24 PARAGANAS NORTH | WEST BENGAL | 743125 | L2 | Rejected-Finance QUOTED RATE NOT LOWEST. | |
| 3 | L3₹1.0 Cr+₹6.1 L (6.50%)Rejected-Finance 3 IBRAHIM ROAD KHIDDERPORE KOLKATA 700023 | KOLKATA | WEST BENGAL | 700023 | L3 | Rejected-Finance QUOTED RATE NOT LOWEST. | |
| 4 | L4₹1.1 Cr+₹12.3 L (13.0%)Rejected-Finance 44B CIRCULAR GARDEN REACH ROAD KOLKATA 700 023 | KOLKATA | WEST BENGAL | 700023 | L4 | Rejected-Finance QUOTED RATE NOT LOWEST. | |
| 5 | L5₹1.1 Cr+₹13.3 L (14.1%)Rejected-Finance GC ROAD ABDUL LATIF ROAD PO TITAGARH KOLKATA 700119 | 24 PARAGANAS NORTH | WEST BENGAL | 700119 | L5 | Rejected-Finance QUOTED RATE NOT LOWEST. |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
24 Oct 2024, 4:00 pmClosed
Commander Works Engineers
HQ Commander Works Engineers, Military Engineer Services, No 1, National Library Avenue, Alipore, Kolkata- 700 027
COMPREHENSIVE MAINTENANCE OF AC PLANT AT DEFI TECH BLDG, MOTHER AND CHILD CARE BLDG AND CH EC UNDER GE(A) KOLKATA
2024_MES_676511_1
8350/E10/24-25
Open Tender
Electrical and Maintenance Works
Item Rate
334 days
Alipore Kolkata
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
GE(A) Kolkata
₹1.7 L
Yes
3 Dec 2024
27 Sept 2024
1 Nov 2024
27 Sept 2024
24 Oct 2024
17 Oct 2024
1 Oct 2024 - 8 Oct 2024
Amount
NOTES :The bidders/contractors are advised to read tender document & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates.
Defi Tech Bldg Central AC Plant Part-I Comprehensive maintenance of complete central AC plant 3 x 200 TR including chillers, pumps, motors cooling towers, AHUs, Cooling tower pipe line, chilled water pipeline, air duct, valves, LT panel and its accessories complete,to run the plant with full efficiency without break down including saturday, sunday and holidays and mechanic with adequate experience should be available to rectify in case any fault observed and all as specified and directed by Engineer-in-Charge Note:-In this quated rate following work included in quated rate. (a) Defi Tech AC Plant (i) Screw type Chiller unit 3 x 200 TR alongwith compressor, evaporator, condensor including allied equipments and sub-assemblies (02 working + 01 standby) (ii) LT control panel with accessories (iii) 3 x Condensor Water Pump (02 working + 01 standby) (iv) 3 x Chiller Water Pump (02 working + 01 standby) (v) 3 x Cooling tower (02 working + 01 standby) alongwith operating valves and pipe line (vi) Cooling tower water tanks (vii) Chilled Water pipe line throughout CH (EC) Main Hospital Building (G+5) (b) CH (EC) Defi Tech building (i) 15 x Air Handlig Units (ii) Air Duct opening grills (iii) 15 Treated frush air unit
NOTES :- 1. Maintenance of AC plant and entire system/equipmentsof capacity 3x 200 TR in summer, winter and monsoon season as per the period of contract including daily/periodical checks i.e quarterly maintenance requirement as per Engineer in charge instructions. The above quoted rates covers daily upkeep of AC plant as described above all as specified and directed by the Engineer-in-Charge for smooth & efficient performance to achieve inside designed conditions throughout the season. 2. Cleaning of inside and out side of the installation and the cost thereof shall be deemed to be included in the unit rate quoted against this item. 3. Contractor shal Identify and rectify the fault as directed by Engineer-in-Charge. 4. During entire contract period any defective components to make plant/ machinary fully functional which is not in Sch 'A', the cost of components and Transportation charges for the same item will not be included in above quoted rate. 5. Make and model of part to be replaced shall be same as existing at site or as per OEM/ Engineer-in-charge. 6. Comprehensive /Periodic maintenance means ensuring optimal functioning of AC plant by the synchronizing levels. 7. The contractor shall provide highly skilled mechanic/Special engineer required for fault during currency of contract period if required. 8. All labour charges for taking out old/items and replacing the same, testing, commissioning, transportation etc which are included in Sch"A" deemed to be included in quoted rates. No extra cost shall be paid to the contractor in this effect. 9. Above central AC installation shall be run 24 Hr x 7 days
Supply only following spares for AC Plant of 3 x 200 TR . Make - Kirloskar.
Repair & Maintenance of upto 1.0 HP gear Motor suitable for TFA
Re- winding of motor of capacity 7.5 HP
Re- winding of motor of capacity 10 HP
Re- winding of motor of capacity 12.5 HP
Re winding of motor of capacity 20 HP
Re- winding of motor of capacity 25 HP
Supply and fixing of upto 1.0 HP gear operating Motor suitable for TFA
Supply and fixing of VLT in screw compressor suitable for 200 TR AC Plant 15KW / 20 HP
Supply and fixing of PCO5 plus medium board controller
Supply and fixing of Sensor Temp NTCO60WPOO K-SMART
Supply and fixing of Cable - 5M for PR Transd. K-Smart
Supply and fixing of Crank case Heater
Supply and fixing of VPD Winding protection
Supply and fixing of VPD Voltage Protection
TEMPERATURE GAUGE S&F of 6" dual scale (°F / °C), lower mount (radial), bimetal thermometer having 0.5 NPT process connection, Grade A accuracy class as per ASME B40.200, stem diameter 6.35mm, laminated safety glass window, stainless steel 304 case
Supply and fixing of EVD Evalution Lan Protocol
Supply and fixing of Expansion K-Smart Controller
Supply and fixing of V-Belt with following size - A-69, A-56, A-50, A-42, A-59, A-39, A-60, A-79
Supply and fixing of Contractor 3TF47
Supply and fixing of Contractor 3TF51
Supply and fixing of DO (Drier Core)
Supply and fixing of MCCB, 100 Amp, 4 Pole
Material and labour for HEPA filter of EU 13 normal flow, media construction microscopic fiber glass + aluminium sepeartor of 99.99% efficiency, particles to be filtered down to 0.3 mircon, initial pressure drop 25mm of water gauge, final pressure drop 60mm of water gauge including dismantling of existing HEPA filter.
Supply and fixing of AHU air filters 5 micron suitable for AHU
Supply and fixing of AHU pre Air filters 5 micron suitable for AHU
Supply and fixing of Pilow type filter suitable for TFA 0.5 micron
Supply and fixing of Solonoid Valve
Supply and fixing of Pressuer Transducer 10. BAR
Supply and fixing of valve Electronic Expention, Mdel - VPF 100C
Supply and fixing of only Spiral target valve
Supply and fixing of only cooling tower fills block (09 Nos of fills in one block)
Supply and fixing of only Spiral Eliminator block (fill block)
Supply and fixing of Float Valve
Supply and fixing of MCX 31 Contactor 82.5A
Supply and fixing of MN 5 over load 30 to 50 A
Supply and fixing of Compressor Oil
Supply and fixing of Compressor Oil Filter
Supply and fixing of Operating Sensors for Screw compressor 200 TR
Supply & Testing nitrogen for leak testing
Supply and charging refrigerant 134A
Supply and fixing of T Lan serial card
Supply and fixing of Coil and Connector Kit 230V.
Supply and fixing of Cable for Expansion valve EX8. 3 MT.
Supply and fixing of Transformer 100/0.2A with AC to DC.
Supply and fixing of PGD 12X32 Display.
Supply and fixing of Flow Switch 1-inch NPT, PPS.
Supply and fixing of Chiller line Butter fly valve 125 NBXPN16.
Supply and fixing of Actuator valve with device
Supply and fixing of in repair Carbon water seel for condenssor pump
Descaling and cleaning of condensor and evaporator by using DAIKIN recommended cleaning solution followed by mechanical cleaning of condensor and evaporators tubes including replacement of nut bolts and gasket etc in every 6 months or as and when ordered by Engineer-in- Charge.
Descaling and cleaning of AHU coils from outside and cooling tubes from inside by flowing suitable chemical in the tubes for removing all foreign material deposited in the coil and tubes in every 3 months or as and when ordered by Engineer-in-Charge.
Servicing of Treated Fresh Air unit .
Supply & fixing in repair canvas cloth suitable for AHU & TFA including taking down old canvas
Material and labour for painting with one coat of red oxide primer and two coats of black japan paint including preparation old/ new surface of steel of any description all as specifierd and as directed.
Mother & Child Block Central AC Plant Part-I Comprehensive maintenance of complete central AC plant 3 x 100 TR including chillers, pumps, motors cooling towers, AHUs, Cooling tower pipe line, chilled water pipeline, air duct, valves, LT panel and its accessories complete, maintanance and repair as and when required to run the plant with full efficiency without break down including saturday, sunday and holidays and mechanic with adequate experience should be available to rectify in case any fault observed and all as specified and directed by Engineer-in-Charge. Note:-In this quoted rate following work included in quated rate. (a) Mother & Child Block (i) Screw type Chiller unit 3 x 100 TR alongwith compressor, evaporator, condensor including allied equipments and sub-assemblies (02 working + 01 standby) (ii) LT control panel with accessories (iii) 3 x Condensor Water Pump (02 working + 01 standby) (iv) 3 x Chiller Water Pump (02 working + 01 standby) (v) 3 x Cooling tower (02 working + 01 standby) alongwith operating valves and pipe line (vi) Cooling tower water tanks (vii) Chilled Water pipe line throughout CH (EC) Main Hospital Building (G+3) (viii) 2 x Hot Water Pump (Standby) (b) Mother & Child Block (i) 05 x Air Handling Units (ii) Air Duct opening grills (iii) 01 Treated frush air unit
NOTES :- 1. Maintenance of AC plant and entire system/equipmentsof capacity 3x 100 TR in summer, winter and monsoon season as per the period of contract including daily/periodical checks i.e quarterly maintenance requirement as per Engineer in charge instructions. The above quoted rates covers daily upkeep of AC plant as described above all as specified and directed by the Engineer-in-Charge for smooth & efficient performance to achieve inside designed conditions throughout the season. 2. Cleaning of inside and out side of the installation and the cost thereof shall be deemed to be included in the unit rate quoted against this item. 3. Contractor shal Indentify and rectify the fault as directed by Engg-in-Charge. 4. During entire contract period any defective components to make plant/ machinary fully functional which is not in Sch 'A'. The cost of components, and Transportation charges for the same will not be included in above quoted rate. 5. Make and model of part to be replaced shall be same as existing at site or as per OEM/ Engineer n cahrge. 6. Comprehensive /Periodic maintenance means ensuring optimal functioning of AC plant by the synchronizing levels. 7.The contractor shall provide of high skilled mechanic/Special engineer required for fault during currency of contract period if required. 8. All labour charges for taking out old/items and replacing same, testing, commissioning, transportation etc which are included in Sch"A" deemed to be included in quotated rates. No extra cost will be paid to the contractor in this effect. 9. Above central AC installation shall be run 24 Hr x 7 days
Supply and fixing of following spares for AC Plant of 3 x 100 TR . Make - DAIKIN.
Supply and fixing of cooling tower fills block (09 Nos of fills in one block)
Supply and fixing of Spiral Eliminator block (fill block)
Supply and fixing of Spiral target valve
Supply and fixing of Float Valve for existing size of cooling tower
Supply and fixing of PCB Board with display ( For AHU )
Supply and fixing of V-Belt with following size- A-69,A-56,A-56,A-50,A-42,A59,A-39,A-60,A-79, B-69 .
Supply and fixing of Link belt for TFA
Supply and fixing of Contractor MNX A1
Supply and fixing of Contractor MNX A2
Supply and fixing of MCCB , 100 Amp ,4 Pole
Supply and fixing of MCCB 63 Amp 4 Pole
Supply and fixing of MCB 20 Amp, 3 Ph
Supply and fixing of SS cyphon with bib cock guage
Supply and fixing of thermometer
Supply and fixing of Pre Air Filter 5 micron suitable for AHU
Supply and fixing of Fine Filter 5 micron suitable for AHU
Supply and fixing of Solonoid Valve Kit
Supply and fixing of Electronic Expention valve E6U
Material and labour for HEPA filter of EU 13 normal flow, media construction microscopic fiber glass + aluminium separator of 99.99% efficiency, particals to be filtered down to 0.3 mircon, initial pressure drop 25mm of water gauge, final pressure drop 60mm of water guage including dismentaling of existing old HEPA filter.
Material and labour for dismantling of old butterfly valves and fixing of new Butterfly valve all as specified and as directed suitable for the following sizes of pipe: 40/ 50 mm bore
80 mm bore
100 mm bore
150 mm bore
200 mm bore
Supply and fixing of MN 5 over load 30to 50 A
Supply and fixing of Operating Sensors for Screw compressor 200 TR
Supply and fixing of refrigerant 134A
Supply and fixing of PCB Display Board for Screw compressor 200 TR
Descaling and cleaning of condensor and evaporator by using Kirloskar recommended cleaning solution followed by mechanical cleaning of condensor and evaporators tubes including replacement of nut bolts and gasket etc in every 6 months or as and when ordered by Engineer-in- Charge.
Descaling and cleaning of AHU coils from outside and cooling tubes from inside by flowing suitable chemical in the tubes for removing all foreign material deposited in the coil and tubes in every 3 months or as and when ordered by Engineer-in-Charge.
PIPING ACCESSORIES (AIR VENT VALVE) M & L for PN 1.6 rated air vent valve having brass body, cover, adopter, disc assembly & cap, stainless steel strainer, plastic float and 20 mm screwed threaded ends suitable for maximum operating temperature 100 °C installed on all high points in the water piping system to automatically remove the trapped air with necessary accessories all complete as specified and directed by the engineer-in-charge.
TEMPERATURE GAUGE S & F of 6" dual scale (°F / °C), lower mount (radial), bimetal thermometer having 0.5 NPT process connection, Grade A accuracy class as per ASME B40.200, stem diameter 6.35 mm, laminated safety glass window, stainless steel 304 case, steam, process connection & joint, aluminium dial & pointer, IP67 protection, scale range 0- 60 °C with necessary accessories all complete as specified and directed by the engineer-in-charge.
PRESSURE GAUGE S & F of 4" bourdon tube pressure gauge conforming to EN 837-1, having copper alloy process connection & pressure element, plastic black pointer & case, plastic crystal-clear window, snap-fitted in case, accuracy class 2.5, scale range 0- 25 bar with necessary accessories all complete as specified and directed by the engineer-in-charge.
Y'-TYPE STRAINER M & L for PN 1.6 rated 100 mm NB 'Y'- type strainer, certified for 300 psig Hyd. body test pressure and 150 psig working test pressure, having cast iron (CI) Gr. FG 200 body & cover conforming to IS 210: 2009 , AISI304 plug, AISI304 stainless steel screen trim having 1.2 mm perforation, bolted cover, compressed asbestos fiber gasket, flanges as per BS 10 Table F undrilled, complete with necessary accessories all as specified and directed by the engineer-in-charge.
S & F of 32 mm thick flexible closed-cell elastomeric thermal insulation (in tubular form) made of elastomeric foam based on synthetic rubber (NBR / PVC), tested for maximum service temperature 100 ºC as per ASTM C534 & minimum service temperature -50 ºC as per ASTM C534, thermal conductivity λ ≤ 0.037 W/mK at mean temperature θm = 24 ºC as per ASTM C518 / C177, ASTM C335, water absorption by volume ≤ 0.2% as per ASTM C 209 / C1763, flame spread index (FSI) & smoke development index (SDI) 25/50 as per ASTM E84, flammability HB, V-0 as per UL 94, fungi resistance as per ASTM G21/C1338, mould growth resistance as per ASTM E2180-18 / UL 181 and ozone resistance as per ASTM D 1149-18 along with self pre-covered self-adhering, UV treated glass cloth of thickness 0.18 mm / 200 GSM adhesives and other necessary accessories complete all as specified and directed by the engineer-in-charge.
CHILLED WATER PIPING MS CLASS- B PIPE WITH INSULATION M & L for chilled water piping including necessary fittings viz. flexible connections, bends, tees, reducers, flanges, air purge valves, drain valves, structural support, necessary clamps, vibration isolators, etc. including painting and supporting / fixing the pipe in excavated trenches or on floor / wall / ceiling with clamps, hangers, angles, channels (using anchor fasteners) with necessary accessories, duly insulated complete all as specified and directed by the engineer-in-charge. NOTES: [i] The pipe size 150 mm NB & below shall be MS 'B' class as per IS 1239-1: 2004 & IS 1239-2: 2011. [ii] The pipe size above 150 mm NB shall be welded black steel pipe heavy class as per IS 3589: 2001. [iii] Minimum thickness of MS sheet for pipe size above 150 mm NB and up to 350 mm NB shall be 4.85 mm. [iv] Insulation shall be measured and paid for separately.
Y- STRAINER M & L for PN 1.6 rated 'Y'- type strainer, certified for 300 psig Hyd. body test pressure and 150 psig working test pressure, having cast iron (CI) Gr. FG 200 body & cover conforming to IS 210: 2009, AISI304 plug, AISI304 stainless steel screen trim having 1.2 mm perforation, bolted cover, compressed asbestos fiber gasket, flanges as per BS 10 Table F undrilled, duly insulated with elastomeric thermal insulation complete with necessary accessories all as specified and directed by the engineer-in-charge. NOTES: [i] Insulation shall be measured and paid for separately.
CONDENSER WATER PIPING MS CLASS 'B' PIPE M & L for condenser water piping including necessary fittings viz. flexible connections, bends, tees, reducers, flanges, air purge valves, drain valves, structural support, necessary clamps, vibration isolators, etc. including painting and supporting / fixing the pipe in excavated trenches or on floor / wall / ceiling with clamps, hangers, angles, channels (using anchor fasteners) with necessary accessories complete all as specified and directed by the engineer-in-charge. [i] The pipe size 150 mm NB & below shall be MS Class 'B' as per IS 1239 (Part- 1): 2004 & IS 1239 (Part- 2): 2011. [ii] The pipe size above 150 mm NB shall be welded black steel pipe heavy class as per IS 3589: 2001. [iii] Minimum thickness of MS sheet for pipe size above 150 mm NB and up to 350 mm NB shall be 4.85 mm.
BALL VALVE M & L for condenser two-piece design cast iron (CI) straight pattern ball valve, conforming to IS 9890: 1981 and having FG 200 cast iron body conforming to IS 210: 2009, AISI 410 stem, stainless steel AISI 304 ball, renewable PTFE seat & gland packing and screwed female BSP parallel threaded ends conforming to BS 21 with necessary accessories all complete as specified and directed by the engineer-in-charge.
PIPING ACCESSORIES AIR VENT VALVE M & L for PN 1.6 rated air vent valve having brass body, cover, adopter, disc assembly & cap, stainless steel strainer, plastic float and 20 mm screwed threaded ends suitable for maximum operating temperature 100 °C installed on all high points in the water piping system to automatically remove the trapped air with necessary accessories all complete as specified and directed by the engineer-in-charge.
THERMAL INSULATION S & F of black flexible closed-cell elastomeric thermal insulation made of elastomeric foam based on synthetic rubber (NBR / PVC), tested for maximum service temperature 100 ºC as per ASTM C534 & minimum service temperature -50 ºC as per ASTM C534, thermal conductivity λ ≤ 0.037 W/mK at mean temperature θm = 24 ºC as per ASTM C518 / C177, ASTM C335, water absorption by volume ≤ 0.2% as per ASTM C 209 / C1763, flame spread index (FSI) & smoke development index (SDI) 25/50 as per ASTM E84, flammability HB, V-0 as per UL 94, fungi resistance as per ASTM G21/C1338, mould growth resistance as per ASTM E2180-18 / UL 181 and ozone resistance as per ASTM D 1149-18 along with self pre-covered self-adhering, UV treated glass cloth of thickness 7 mm / 200 GSM adhesives and other necessary accessories complete all as specified and directed by the engineer-in-charge.
32 mm thick thermal insulation (for water pipe line)
19 mm thick thermal insulation (for supply air ducting)
13 mm thick thermal insulation ( for return air ducting)
Repairing of Condenser of Chiller plant 220 tr, at Difitech Building after finding the leakage in the leakage in Cindenser copper tube, plug and block the same by opening the two side cover of condenser, inject the Nitrogen pressor to the system to rectifing leakage proof,flashing the system,heating and dehumidifing the Chiller unit, refixing the condenser cover with nuts and bolds, gasket and complete with Refrigerant charging and commissioning complete or as directed by Engineering- in-charge.
Note: Schedule of credit (SCHEDULE OF CREDIT) amount of Rs ₹ ___________ mentioned on Page No ____ shall be deducted from the total quoted amount of BOQ.
RADHA ENTERPRISE (BID ID -3145147)
EASTERN REFRIGERATION AND ELECTRICAL CO (BID ID -3146467)
INDIA ELECTRICAL EQUIPMENTS (BID ID -3148063)
KWALITY CONSTRUCTION (BID ID -3147629)
M/s UNIVERSAL (BID ID -3147649)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .