Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 CrAdmitted-Finance | ₹5.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.2 Cr+₹16.3 L (3.27%)Admitted-Finance | ₹5.2 Cr+₹16.3 L (3.27%) | L2 | Admitted-Finance |
| 3 | L3₹5.2 Cr+₹22.9 L (4.59%)Admitted-Finance | ₹5.2 Cr+₹22.9 L (4.59%) | L3 | Admitted-Finance |
| 4 | L4₹5.5 Cr+₹49.8 L (9.98%)Admitted-Finance | ₹5.5 Cr+₹49.8 L (9.98%) | L4 | Admitted-Finance |
| 5 | L5₹6.0 Cr+₹1.0 Cr (20.7%)Admitted-Finance | ₹6.0 Cr+₹1.0 Cr (20.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s. BSG INFRASTRUCTURE L6 | S S POLICE PATIL AND COMPANY L3 | MS N B HIREMATH L4 | H P MADHUKAR AND CO L2 | IBHA CONSTRUCTIONS PVT LTD L1 | M B KALLUR INFRASTRUCTURE COMPANY L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing and applying Tack Coat as per Table 500-2 on prepared surface using Rapid Setting Bituminous Emulsion complying with IS 8887 of approved quality and make including cleaning of road surface by Mechanical Broom & dusting by Air compressor, and spraying by Bitumen Pressure Distributor, including cost of all materials, labour, hire charges of machinery, loading, unloading stacking, etc complete, except lead for emulsion.over B.T. surface at 2.0 kg/10 Sqm. | 1,12,000 | Sqm | 14 ₹15,68,000 | 14.4 ₹16,12,800 | 10.62 ₹11,89,440 Lowest | 14 ₹15,68,000 | 11 ₹12,32,000 | 14 ₹15,68,000 |
| 2.00 | Bituminous Concrete with Waste Plastic Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates as per table 500-7 of specified grading premixed with bituminous binder VG-40 paving bitumen as per clause 504.3.1 complying with IS-73-2013 of specified grading, premixed with bituminous binder @ 5.2per cent of mix and filler @2% by weight of agregate, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects including cost of all materials all labour, usage charges of all machinery all lead, lifts, loading, unloading stacking transporting etc., complete, except lead for bitumen, with a lead of mixed material upto 1 km, excluding cost of primer/ tack coat - 30-40 mm compacted thickness. Grading-II | 4,121.18 | Cum | 14,200 ₹5,85,20,756 | 10,620 ₹4,37,66,931.6 | 11,800 ₹4,86,29,924 | 10,250 ₹4,22,42,095 Lowest | 10,250 ₹4,22,42,095 Lowest | 12,500 ₹5,15,14,750 |
| 3.00 | Construction of Subgrade and Earthern Shoulder
Construction of sub-grade and earthern shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet the requirement of Table No. 300-2 in layers not exceeding 250mm thick and compacting it by mechanical means after adding water to its OMC, so as to achieve 97% compaction of maximum dry density and finish the surface to the required camber, grade and cross section etc., spreading by Dozer, grading by notor grader, consolidation by vibrating road roller including all leads, all lifts, loading, unloading, all labour, hire charges of all machinery etc., complete. (N.H. SR 2022-23/ Page No. 19/ Item No. 3.18) | 9,366 | Cum | 500 ₹46,83,000 | 423 ₹39,61,818 | 271 ₹25,38,186 Lowest | 480 ₹44,95,680 | 400 ₹37,46,400 | 450 ₹42,14,700 |
| 4.00 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes, including, barricading, traffic diversion as per IRC-35, cleaning the surface of dirt, dust and other foriegn matter, demarcation at site, traffuc control,cost of all materials all labour, lead, lifts, loading, unloading transporting etc., complete. | 5,465.06 | Sqm | 675 ₹36,88,915.5 | 531 ₹29,01,946.86 | 472 ₹25,79,508.32 Lowest | 600 ₹32,79,036 | 500 ₹27,32,530 | 550 ₹30,05,783 |
Tender Value
₹7.0 Cr
EMD Value
₹7.0 L
Closing Date
21 Jun 2023, 3:00 pmClosed
Regional Officer (Civil), MoRTH, Bengaluru
Regional Office (Civil), MoRTH, Bengaluru
Periodical Renewals from Km 90 to 106 of NH 52 New NH 63 Old Yellapur Kalaghatgi section in the State of Karnataka
2023_MoRTH_742570_1
RW/BNG/PR/KWR DVN/90-106/06/2022
Open Tender
Civil Works - Highways
Works
183 days
Yellapur Kalaghatgi section
Please refer Tender documents.
5 documents required · 5 mandatory
₹11,800
Rs 10000 through Bharatkosh Rs 1800 GST by DD
₹7.0 L
Regional Office (Civil), MoRTH, Bengaluru
30 Aug 2023
25 Feb 2023
22 Jun 2023
25 Feb 2023
21 Jun 2023
25 Mar 2023
24 Mar 2023
Amount
Providing and applying Tack Coat as per Table 500-2 on prepared surface using Rapid Setting Bituminous Emulsion complying with IS 8887 of approved quality and make including cleaning of road surface by Mechanical Broom & dusting by Air compressor, and spraying by Bitumen Pressure Distributor, including cost of all materials, labour, hire charges of machinery, loading, unloading stacking, etc complete, except lead for emulsion.over B.T. surface at 2.0 kg/10 Sqm.
Bituminous Concrete with Waste Plastic Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates as per table 500-7 of specified grading premixed with bituminous binder VG-40 paving bitumen as per clause 504.3.1 complying with IS-73-2013 of specified grading, premixed with bituminous binder @ 5.2per cent of mix and filler @2% by weight of agregate, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects including cost of all materials all labour, usage charges of all machinery all lead, lifts, loading, unloading stacking transporting etc., complete, except lead for bitumen, with a lead of mixed material upto 1 km, excluding cost of primer/ tack coat - 30-40 mm compacted thickness. Grading-II
Construction of Subgrade and Earthern Shoulder Construction of sub-grade and earthern shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet the requirement of Table No. 300-2 in layers not exceeding 250mm thick and compacting it by mechanical means after adding water to its OMC, so as to achieve 97% compaction of maximum dry density and finish the surface to the required camber, grade and cross section etc., spreading by Dozer, grading by notor grader, consolidation by vibrating road roller including all leads, all lifts, loading, unloading, all labour, hire charges of all machinery etc., complete. (N.H. SR 2022-23/ Page No. 19/ Item No. 3.18)
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes, including, barricading, traffic diversion as per IRC-35, cleaning the surface of dirt, dust and other foriegn matter, demarcation at site, traffuc control,cost of all materials all labour, lead, lifts, loading, unloading transporting etc., complete.
H P MADHUKAR AND CO
S S POLICE PATIL AND COMPANY
MS N B HIREMATH
M B KALLUR INFRASTRUCTURE COMPANY
M/s. BSG INFRASTRUCTURE
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .