| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.3 CrAdmitted-Finance BLDG NO 8 BEHIND BOMBAY STOCK EXCHANGE RAJABHADUR MANSION AMBALAL DOSHI MARG 2ND FLOOR VILLAGE TOWN FORT CITY MUMBAI | L1 | Admitted-Finance | ||
| 2 | L2₹15.8 Cr+₹49.7 L (3.24%)Admitted-Finance MUMBAI | MUMBAI | L2 | Admitted-Finance |
Tender Value
₹14.2 Cr
EMD Value
₹7.1 L
Closing Date
18 Oct 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Director Pune
shivkirti sadnika, ghorpadi post, pune
CONSERVATION REPAIRS PRATAPGAD FORT TAL. MAHABALESHWAR, DIST. SATARA (PART-V)
2024_TCADM_1113545_1
2024-25-11
Open Tender
Civil Works - Others
Percentage
365 days
pratapgad fort satara
For Empanlled Contractor with Directorate fo Archaeology and Museums mumbai only
2 documents required · 2 mandatory
₹3,560
₹7.1 L
pune office
5 Dec 2024
11 Oct 2024
21 Oct 2024
11 Oct 2024
18 Oct 2024
11 Oct 2024
14 Oct 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building / structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S.tube , placed 1.5metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S.Tubes, M.S.tube challis, M.S.clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:-(1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. | 8,817.33 | SQ.M | 307 | ₹27,06,920.31 |
| 2 | Cutting down trees - Cutting down trees including trunks and branches with grith above 30 cm to 60 cm and stacking the materials neatly with all lifts and lead of 1000 mt as directed and earth filling in the depression/ pit if any. | 5 | NOS | 562 | ₹2,810 |
| 3 | Cutting down trees - Cutting down trees including trunks and branches with grith above 60 cm to 90 cm and stacking the materials neatly with all lifts and lead of 1000 mt as directed and earth filling in the depression/ pit if any. | 2 | NOS | 932 | ₹1,864 |
| 4 | Removal of plants/ficus growth by pulling out root system embedded in masnory, cutting stem and application of hing/gur/lime formulation as specified by the Architect or other patented chemical biocide treatment such as biocide 'Glycel' (isoproplamine salt of glyphosate) or other chemical as specified by the Engineer in charge etc. complete | 100 | NOS | 251 | ₹25,100 |
| 5 | Removing G.I. or A.C. sheet roofing including purlins, principal rafters etc. including sorting serviceable and unserviceable materials, stacking the same as and where directed in the compound including scaffolding etc. complete. | 1,460.7 | SQ.M | 98 | ₹1,43,148.6 |
| 6 | Dismantling the R.C.C. Work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete | 68.95 | CU.M | 1,596 | ₹1,10,044.2 |
| 7 | Removing lime or lean cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. | 390.2 | CU.M | 614 | ₹2,39,582.8 |
| 8 | Removing cement tiles or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all lead, lifts, etc. complete. | 557.78 | SQ.M | 50 | ₹27,889 |
| 9 | Dismantling brick masonry in lime or cement mortar and stacking the materials as directed with all leads, lifts etc | 98.11 | CU.M | 369 | ₹36,202.59 |
| 10 | Removing the existing cement plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete. | 295.17 | SQ.M. | 57 | ₹16,824.69 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
TenderDocpratapgad5.pdf
Tender Documents • 2.87 MB
BOQ_1944111.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .