| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.0 CrAccepted-AOC OLD NO 1 172 NEW NO 2 5284 2ND FLOOR SRINIVASAN STREET MEDAVAKKAM MAIN ROAD NANMANGALAM CHENNAI 600 129 | CHENGALPATTU | TAMIL NADU | 600129 | L1 | Accepted-AOC AOC | |
| 2 | L2₹19.0 Cr+₹36.1 L (1.94%)Rejected-Finance NO 3 PIONEER KUMARASAMY NAGAR EXTENSION IV PERUMALPURAM TIRUNELVELI 07 | L2 | Rejected-Finance Rejected |
Tender Value
₹18.1 Cr
EMD Value
₹9.2 L
Closing Date
14 Oct 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Enginner
Fishing Harbour Project Circle, Fisheries and Fishermen Welfare Department Chennai35
Construction of Bait Arch at Kannathur Reddy Kuppam in Chengalpattu District.
2024_AHDF_488396_1
05DBF.114 N2024 Dated 25.09.2024
Open Tender
Civil Works
Lump-sum
450 days
Kannathur Reddy Kuppam
As per Mentioned in PQ Document
4 documents required · 4 mandatory
₹0
₹9.2 L
20 Jan 2025
26 Sept 2024
15 Oct 2024
26 Sept 2024
14 Oct 2024
26 Sept 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. | 3,140 | M3 | 102.8 | ₹3,22,792 |
| 2 | Formation of Filter Layer for rubble mound groyne with quarry run hard blue granite stone of weight 1kg to 10kg having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the side slopes 1:1.5 on both sides wherever required as per drawing with necessary equipment and devices as per the drawings and specification etc complete as directed by the Departmental Officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 15,580 | Mt | 1,000.55 | ₹1,55,88,569 |
| 3 | Formation of core layer for rubble mound groynes with quarry run hard blue granite stone of weight 100Kg- 300Kg having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading, transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the side slopes 1 : 1.5 on both sides with necessary equipment and devices as per the drawing and specification etc., complete as directed by the Departmental Officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational changes of tools and plants etc. (The payment shall be made on weight basis (ie) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 59,860 | Mt | 1,000.55 | ₹5,98,92,923 |
| 4 | Formation of Toe Berm Layer for rubble mound Breakwater with hard blue granite stone of weight ranging from 500Kg to 800kg having a specific gravity of not less than 2.65 and as nearly cubical as possible as per approved design and drawing. The rate is inclusive of quarrying, loading at quarry using crane and other tools and plants as required, transporting by tippers/ lorries weighing on the electronic weigh bridge for measurement, Unloading/dumping placing in position to required level, profile and finishing the side slopes of 1 : 1.5 using crane and floating equipment and devices as per the drawing and specification etc., complete and as directed by the Departmental Officers. The rate is inclusive of placing sectioning and finishing with necessary equipments and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 21,480 | Mt | 1,061 | ₹2,27,90,280 |
| 5 | Formation of Armour layer for rubble mound groynes with quarry run hard blue granite stone of weight ranging from 1500kg to 3500Kg having a specific gravity of not less than 2.65 and as nearly cubical as possible as per approved design and drawing. The rate is inclusive of quarrying, loading at quarry using crane and other tools and plants as required, transporting by tippers/ lorries weighing on the electronic weigh bridge for measurement, Unloading/dumping placing in position to required level, profile and finishing the side slopes of 1 : 1.5 using crane and floating equipment and devices as per the drawing and specification etc., complete and as directed by the Departmental Officers. The rate is inclusive of placing sectioning and finishing with necessary equipments and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 42,070 | Mt | 1,104.9 | ₹4,64,83,143 |
| 6 | Earthwork Excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth with in the compou | 290 | m³ | 219.7 | ₹63,713 |
| 7 | Supplying and filling in foundation, basement, etc with Stone Dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 175 | m³ | 520 | ₹91,000 |
| 8 | Supplying and filling in foundation and basement with Gravel in layers of not more than 15cm thick well rammed watered and consolidated etc., | 70 | m³ | 367.55 | ₹25,728.5 |
| 9 | Cement Concrete 1:4:8 (One cement, Four sand and Eight hard broken stone) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying w | 110 | m³ | 5,623.35 | ₹6,18,568.5 |
| 10Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_580446.xls
BOQ Document • 0.31 MB
153052291.pdf
Tender Document • 0.33 MB
PB.pdf
Tender Document • 1.26 MB
PQ.pdf
Tender Document • 0.67 MB
153052293.html
Tender Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .