| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.8 L+₹787.46 (0.44%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | N MARIRAJA L1 | JJ LALA PROJECTS PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00Construction of 5 KLD Horizontal Sub Surface Flow Thirumanickam (Type II for 5 KLD ) | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 22 | m3 | 263 ₹5,786 Lowest | 263.78 ₹5,803.16 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3 | 2.18 | m3 | 5,814.17 ₹12,674.89 Lowest | 5,814.17 ₹12,674.89 Lowest |
| 4.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | 76.51 | m3 | 547.5 ₹41,889.23 Lowest | 547.5 ₹41,889.23 Lowest |
| 5.00 | Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 20mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height) | 8.04 | m3 | 6,602.75 ₹53,086.11 Lowest | 6,602.75 ₹53,086.11 Lowest |
| 6.00 | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour | 14.56 | m3 | 590.39 ₹8,596.08 Lowest | 590.39 ₹8,596.08 Lowest |
| 7.00 | Filling the soak pit with 20 mm metal as per specification | 1.48 | m2 | 2,246.15 ₹3,324.3 Lowest | 2,246.15 ₹3,324.3 Lowest |
| 8.00 | Filling the soak pit with 4 to 10 mm Chips metal as per specification | 3.81 | m3 | 1,433.65 ₹5,462.21 Lowest | 1,433.65 ₹5,462.21 Lowest |
| 9.00 | Supplying and fixing of 110mm dia PVC Pipe 6 Ksc/Cm2 (Above G.L) | 12 | m3 | 300 ₹3,600 Lowest | 310 ₹3,720 |
| 10.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 0.98 | m3 | 9,722.69 ₹9,528.24 Lowest | 9,722.69 ₹9,528.24 Lowest |
Tender Value
₹1.8 L
Closing Date
31 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO BP
Sedapatti
Construction of 5 KLD Horizontal Sub Surface Flow Thirumanickam Type II for 5 KLD
2025_RDTN_618442_1
02(02)/SED/SBM/2025-2026
Open Tender
Civil Works
Works
90 days
sedapatti
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
1 Nov 2025
29 Oct 2025
31 Oct 2025
29 Oct 2025
31 Oct 2025
29 Oct 2025
Amount
Construction of 5 KLD Horizontal Sub Surface Flow Thirumanickam (Type II for 5 KLD )
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 20mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Filling the soak pit with 20 mm metal as per specification
Filling the soak pit with 4 to 10 mm Chips metal as per specification
Supplying and fixing of 110mm dia PVC Pipe 6 Ksc/Cm2 (Above G.L)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
supplying and fixing cuddapah slabs 50mm thick
Provision for plants
Provision for screening mesh arrangement charges
Provision for holes for pvc pipe labour charges
Supply of PVC Pipe Ventiletor Pipe With Cowl
Provision for Manhole Cover
Provision for painting and lettering of name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
JJ LALA PROJECTS PRIVATE LIMITED (BID ID -1501082)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_739205.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .