| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAdmitted-Finance | ₹3.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.4 Cr+₹8.9 L (2.69%)Admitted-Finance | ₹3.4 Cr+₹8.9 L (2.69%) | L2 | Admitted-Finance |
| 3 | L3₹3.4 Cr+₹14.2 L (4.31%)Admitted-Finance | ₹3.4 Cr+₹14.2 L (4.31%) | L3 | Admitted-Finance |
| 4 | L4₹3.5 Cr+₹19.0 L (5.78%)Admitted-Finance | ₹3.5 Cr+₹19.0 L (5.78%) | L4 | Admitted-Finance |
| 5 | L5₹3.9 Cr+₹57.2 L (17.4%)Admitted-Finance VILLAGE ALIPUR BEHIND PUNJAB COLD STORE JALANDHAR 144024 | JALANDHAR | JALANDHAR | PUNJAB | 144024 | ₹3.9 Cr+₹57.2 L (17.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SUSANTA KUMAR SWAIN L1 | M/S BHAIRAB CHARAN SWAIN L2 | SUBRAT KUMAR BEHURA L3 | Baishnab Charan Nayak L4 | Shiv Raj Infra L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling and removing RCC columns, beams, slab, staircase landing, lintels including stacking the useful materials for reuse and removing the debris within 50m with supply of all labour, T&P, staging, scaffolding, etc. complete cleaning the debrises with all taxes, including leads & lifts transportation & dispsing at specified place but excluding cost of GST as per direction of Engineer-in-charge. | 10 | cum | 900 ₹9,000 | 500 ₹5,000 Lowest | 1,000 ₹10,000 | 800 ₹8,000 | 1,500 ₹15,000 |
| 2.00 | Earth work in all kind of soil with initial lead and lift with \ dressing, leveling & compacting the foundation bed, breaking the clods to maximum 5cm to 7cm disposing the material at a designated placed and keeping the required quantities for back filling with cost of labour, T&P, tollage, transportation, loading at one end & unloading at other end, all taxes, exclduing GST all completed a per the direction of Engineer-in-Charge. | 4,101.5 | cum | 130 ₹5,33,195 | 80 ₹3,28,120 Lowest | 160 ₹6,56,240 | 200 ₹8,20,300 | 300 ₹12,30,450 |
| 3.00 | P.C.C(1:3:6) of using 40 mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope compacting, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes, etc. complete but excluding cost of GST as directed by Engineer-in-charge | 1,043 | cum | 4,100 ₹42,76,300 | 3,500 ₹36,50,500 Lowest | 4,400 ₹45,89,200 | 4,400 ₹45,89,200 | 3,800 ₹39,63,400 |
| 4.00 | Cement concrete of M-30 grade of PQC by using Crusher broken hard granite cips of 12mm to 20mm size of approved quality for RCC road work, mixing in a Batching plant/Mobile Batching Plant, transporting the concrete by any approved means, hoisting, laying on road pavement slabs in panels of required size, providing thermocol at top 50mm of the panel joints so as to create a gap of 12mm between panels, compacting by mechanical vibrator with 60mm needle top vibrator, finished smooth to the exposed surface to proper grade and camber, texturing the top surface to proper grade and camber, texturing the top surface by brooming with wire brush, curing by ponding, barricading the area for proper safety of the fresh concrete without obstructing the traffic, etc with supply of all materials, labour, T&P, tollage, all transportation charges, engagement, hire & running charges of all machineries, taxs excluding GST and excluding cost of formwork, cost of joints, cost of steel & labour charges for bending & binding of steel etc. all complete as directed by Engineer in charge (NB:1) Two spearate Mix Design shall be conducted ith different Cement brand for RCC work & Barricading the site if required. 2) materials tesing cost borne by contractor) without papver sensor. | 2,606.5 | cum | 5,200 ₹1,35,53,800 | 5,300 ₹1,38,14,450 | 5,500 ₹1,43,35,750 | 5,800 ₹1,51,17,700 | 5,100 ₹1,32,93,150 Lowest |
| 5.00 | CC M-20 for RCC works using 20mm and 10mm size C.B.G chips for all floors, foundation & plinth etc. of approved quality, mixing as per approved design mix, hoisting, laying, compacting with 40 to 60 neele vibrator, curing with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, etc. all complete but Excluding GST as directed by Engineer-in-Charge. | 793 | cum | 4,890 ₹38,77,770 | 5,200 ₹41,23,600 | 5,300 ₹42,02,900 | 4,400 ₹34,89,200 Lowest | 4,500 ₹35,68,500 |
| 6.00 | Supply Tor/TMT steel of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works binding the grills with binding wire of 18 to 20 gauge including supply of steel, labour, materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge. (NB: No payment shall be made for extra weight than theoretical co-efficient). | 972.5 | Qntl | 6,900 ₹67,10,250 | 6,500 ₹63,21,250 | 5,900 ₹57,37,750 Lowest | 6,800 ₹66,13,000 | 6,400 ₹62,24,000 |
| 7.00Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in-charge. | ||||||||
| 7.10 | F&P | 378 | sqm | 175 ₹66,150 | 230 ₹86,940 | 115 ₹43,470 | 100 ₹37,800 Lowest | 250 ₹94,500 |
| 7.20 | RCC Wall | 2,442 | sqm | 330 ₹8,05,860 | 230 ₹5,61,660 Lowest | 350 ₹8,54,700 | 470 ₹11,47,740 | 450 ₹10,98,900 |
| 8.00 | Drilling 16mm dia holes on concrete surface (vertical/horizontal), upto 200mm depth, cleaning the holes with air blower, filling the hole with thick cement slurry and putting 12mm dia rods of required length with supply of all materials, labour, T&P, Gate pass expenses all machineries, operator expenses, POL, and inclusive of all taxes etc. all complete as per direction of Engineer-in-Charge (Excluding cost of GST). * The cost of steel is not included in the price. | 32,000 | No | 40 ₹12,80,000 | 80 ₹25,60,000 | 50 ₹16,00,000 | 20 ₹6,40,000 Lowest | 130 ₹41,60,000 |
Tender Value
₹4.2 Cr
EMD Value
₹8.5 L
Closing Date
11 Mar 2025, 5:00 pmClosed
K P MISHRA, EE, PRD, PPA
K P MISHRA, EE, PRD, PPA
Road Widening and Restoration/Repair of Divider from Gate No.2 to BOT Sub-Station Square.
2025_MoS_850072_1
CE/PRD/ACCTS-10/24/66
Open Tender
Civil Works
Works
180 days
Paradip
Refer Tender Document and e-TCN
5 documents required · 5 mandatory
₹5,000
Yes
As per Tender Document and e-TCN
₹8.5 L
Yes
11 Apr 2025
19 Feb 2025
12 Mar 2025
19 Feb 2025
11 Mar 2025
19 Feb 2025
Amount
Dismantling and removing RCC columns, beams, slab, staircase landing, lintels including stacking the useful materials for reuse and removing the debris within 50m with supply of all labour, T&P, staging, scaffolding, etc. complete cleaning the debrises with all taxes, including leads & lifts transportation & dispsing at specified place but excluding cost of GST as per direction of Engineer-in-charge.
Earth work in all kind of soil with initial lead and lift with \ dressing, leveling & compacting the foundation bed, breaking the clods to maximum 5cm to 7cm disposing the material at a designated placed and keeping the required quantities for back filling with cost of labour, T&P, tollage, transportation, loading at one end & unloading at other end, all taxes, exclduing GST all completed a per the direction of Engineer-in-Charge.
P.C.C(1:3:6) of using 40 mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope compacting, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes, etc. complete but excluding cost of GST as directed by Engineer-in-charge
Cement concrete of M-30 grade of PQC by using Crusher broken hard granite cips of 12mm to 20mm size of approved quality for RCC road work, mixing in a Batching plant/Mobile Batching Plant, transporting the concrete by any approved means, hoisting, laying on road pavement slabs in panels of required size, providing thermocol at top 50mm of the panel joints so as to create a gap of 12mm between panels, compacting by mechanical vibrator with 60mm needle top vibrator, finished smooth to the exposed surface to proper grade and camber, texturing the top surface to proper grade and camber, texturing the top surface by brooming with wire brush, curing by ponding, barricading the area for proper safety of the fresh concrete without obstructing the traffic, etc with supply of all materials, labour, T&P, tollage, all transportation charges, engagement, hire & running charges of all machineries, taxs excluding GST and excluding cost of formwork, cost of joints, cost of steel & labour charges for bending & binding of steel etc. all complete as directed by Engineer in charge (NB:1) Two spearate Mix Design shall be conducted ith different Cement brand for RCC work & Barricading the site if required. 2) materials tesing cost borne by contractor) without papver sensor.
CC M-20 for RCC works using 20mm and 10mm size C.B.G chips for all floors, foundation & plinth etc. of approved quality, mixing as per approved design mix, hoisting, laying, compacting with 40 to 60 neele vibrator, curing with cost and supply of all materials, labour, T&P, taxes, tollage, royalties, etc. all complete but Excluding GST as directed by Engineer-in-Charge.
Supply Tor/TMT steel of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works binding the grills with binding wire of 18 to 20 gauge including supply of steel, labour, materials, transportation charges, T&P, taxes, etc. all complete but excluding GST as per the direction of Engineer-in-charge. (NB: No payment shall be made for extra weight than theoretical co-efficient).
Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in-charge.
RCC Wall
Drilling 16mm dia holes on concrete surface (vertical/horizontal), upto 200mm depth, cleaning the holes with air blower, filling the hole with thick cement slurry and putting 12mm dia rods of required length with supply of all materials, labour, T&P, Gate pass expenses all machineries, operator expenses, POL, and inclusive of all taxes etc. all complete as per direction of Engineer-in-Charge (Excluding cost of GST). * The cost of steel is not included in the price.
Supplying and laying 125 Micron polythene separation membrane with overlapping of 300 mm at joints including cleaning the surface before placing the membrane etc., complete including cost of all materials, labour, T&P, tollage, taxes excluding GSTetc, all complete as directed by the Engineer In Chrage. (N.B. : No payment will be made for overlapping.)
Supplying & forming 12mm wide x 85mm deep longitudional joints by drilling holes into existing concrete surface & fixing 12mm dia 640 mm long HYSD bars @450mm C/C painted 50mm at centere with anti-corrosive paint including providng and fixing btumen paper, painting one side of concrete surface (250mm) thick) with bituminous black paint, cutting grooves of required size and sealing the grooves with bitumastic filler etc. complete with cost and supply of all materials, reinforcement, T&P, laour, hire and running charges of all machineries, safety measures, taxes excluding GST etc., all complete as directed by Engineer-in-Charge.
Supplying & forming 12mm wide x 60mm deep contraction joints by fixing 32 mm dia 450mm long mild steel round bars @ 300mm C/C including painting two third of the bars with anticorrosive paint & covering the same with 125 micron polythene fitted & cutting grooves of required size and sealing the grooves with bitumastic filler etc, complete with cost & supply of all materials including dowel bars, T&P, labour, Hire and running charges, of all machineries, safety measures, taxes excluding GST etc. all complete as directed by Engineer-In-Charge.
Supplying & forming 25mm wide x 250mm deep expansion joints by fixing 32 mm dia 450mm long mild steel bars @ 300mm C/C including painted 275mm length of bars with anti-corrosive paint & covering the same with 125 micron polythene fitted and HDFC/G.I. cap of 100 mm long at the other end including fixing 25mm thick & 220 mm deep joint filler Board (Shalitax or equivalent) painting one side of concrete surface with bituminous black paint & sealing the groove with bitumastic filler etc, all complete with cost & supply of all materials including dowel bars, T&P, labour, Hire and running charges, of all machineries, safety measures, taxes excluding GST etc., all complete as directed by Engineer-In-Charge.
12 MM thick Cement plaster with cement mortar (1:6) proportion, over brick work including racking out the joints, finished smooth to the exposed surface, rounding the corners wherever found necessary including cost & supply of all materials, labour, T&P, staging, scaffolding, watering, curing, taxes, tollage, royalties, etc. complete but excluding GST as per direction of Engineer-in-charge
Painting two coats with approved quality & shade enmel paint over one coat of primer including scrapping, cleaning the surface sand papering, filling the holes with waz putty etc. all complete including cost and supply of all materials, labour, T&P, all taxes, transportation charges, staging, scaffolding, etc. all complete but excluding cost of GST as per direction of Engineer-in-Charge.
M/S BHAIRAB CHARAN SWAIN (BID ID -3185681)
SUBRAT KUMAR BEHURA (BID ID -3185696)
Baishnab Charan Nayak (BID ID -3185761)
Shiv Raj Infra (BID ID -3185057)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.17 MB
BOQ_893594.xls
BOQ • 0.29 MB
BOQ.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .