| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹26.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹27.8 L+₹1.2 L (4.49%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹28.0 L+₹1.4 L (5.12%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹28.3 L+₹1.7 L (6.20%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹29.5 L+₹2.8 L (10.5%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
30 Jan 2026, 6:55 pmClosed
EXECUTIVE ENGINEER PWD RB DIVISION MENDHAR
EXECUTIVE ENGINEER PWD RB DIVISION MENDHAR
Please refer to BOQ
2026_PWDJK_300961_1
e-NIT No 100 of 2025-26 Dated 19-01-2026
Open Tender
Civil Works
Percentage
90 days
MENDHAR
Please refer to Technical Bid as per conditions of e-NIT.
2 documents required · 2 mandatory
₹1,100
Sub Treasurey Mendhar
₹90,000
11 Feb 2026
19 Jan 2026
31 Jan 2026
19 Jan 2026
30 Jan 2026
19 Jan 2026
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :50% Ordinary Rock30% Hard Rock 20%
CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
RANDOM RUBBLE MASONRY Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: 7.1.1 Cement mortar 1:6 (1 Cement : 6 coarse sand)
Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. 5.34.1 All works upto plinth level
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works above plinth level upto floor V level
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering finishing with.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Structural steel work in built up sections, trusses and framed work,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete..1 Riveted and bolted
Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work)50 mm dia. nominal bore
Dumping/filling stone including cost of stones. in Horizontal on level
Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc.
Centering and shuttering including strutting, propping etc. and removal of form work for Suspended floors, roofs, landings, balconies and access platforms.
Centering and shuttering including strutting, propping etc. and removal of form work for Edges of slabs and breaks in floors and walls
Carriage of material by mechanical transport including loading/unloading and stacking complete from source to site of work Sand avg lead upto 35 kms avg
Carriage of material by mechanical transport including loading/unloading and stacking complete from source to site of work Stone agg below 40 mm avg lead upto 10 kms avg
Carriage of material by mechanical transport including loading/unloading and stacking complete from source to site of work Stone agg above 40 mm avg lead upto 10 kms avg
Carriage of material by manual transport including loading/unloading and stacking complete from source to site of work Stone avg lead upto 50 meter HL avg
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_976420.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .