Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-Finance | L1 | Accepted-Finance FINANCIALLY ACCEPTED | |
| 2 | L2₹5.1 L+₹48.38 (<0.01%)Rejected-Finance | L2 | Rejected-Finance FINANCIALLY REJECTED |
Tender Value
₹4.8 L
EMD Value
₹9,674
Closing Date
22 Sept 2026, 12:00 pmClosed
V P SARPANCH
V P Querim Tiracol, Pernem- Goa
Construction of Stage consisting of Tata sheets to Govt Primary School at Talwada in V P Querim Tiracol Pernem Goa
2026_VP_31692_1
VP/QT/PER/E-Tender/2026-27/ 1061
Open Tender
Civil Works
Percentage
90 days
V P Querim Tiracol, Pernem- Goa.
AS PER TENDER NOTICE
2 documents required · 2 mandatory
₹4,000
₹9,674
26 Sept 2026
9 Sept 2026
25 Sept 2026
9 Sept 2026
22 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | |||||
| 1.01 | All kinds of soil | 291 | cu.m | 16.92 | ₹4,923.72 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 2,211 | Cu.m | 7.55 | ₹16,693.05 |
| 3Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : | |||||
| 3.01 | All works upto plinth level | 6,192 | cu.m | 5.4 | ₹33,436.8 |
| 4 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement | 5,186 | cu.m | 12.16 | ₹63,061.76 |
| 5 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge | 245 | cu.m | 26 | ₹6,370 |
| 6 | 12mm cement plaster 1:4 (1 cement : 4 fine sand) | 223 | sq.m | 57.1 | ₹12,733.3 |
| 7 | Applying one coat of cement primer of approved brand and manufacture on wall surface. | 53 | sq.m | 57.1 | ₹3,026.3 |
| 8 | Finishing wall with superior quality waterproofing cement paint (super snow hem or equivalent) of required shade on new work (three or more coats) to give an even shade | 103 | sq.m | 57.1 | ₹5,881.3 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_32076.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .