| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.0 LAccepted-AOC NOT AVAILABLE | NORTH | DELHI | 110006 | ₹33.0 L Quoted ₹28.0 L | L1 | Accepted-AOC 1st lowest |
| 2 | L2₹28.1 LRejected-Finance PLOT NO 19 LANE 1 RAVI TALKIES SQUARE P O BJB NAGAR P S BADAGADA BHUBANESWAR 14 | BHUBANESWAR | KHORDHA | ODISHA | ₹28.1 L | L2 | Rejected-Finance other than 1st lowest |
| 3 | L3₹29.2 LRejected-Finance | ₹29.2 L | L3 | Rejected-Finance other than 1st lowest |
| 4 | Rejected-Technical AT DAHIKHIA PO PS KAKATPUR DIST PURI | - | - | Rejected-Technical Technically not qualified |
Tender Value
₹40.0 L
EMD Value
₹40,000
Closing Date
15 Apr 2026, 5:00 pmClosed
Executive Engineer,Central Tender Cell
Central Tender Cell, UG Floor, ICOMC Tower, Satya Nagar
Annual Maintenance cleaning of water stretch and Internal Strom Water Drain in ward no. 5, ward no. 4 and Nayanjori along PMC left and right embankment from Nuapatna Culvert to NH and Rudrapur Sub-minor and inside of Symphony Mall of ward no. 4 under
2026_ORULB_127554_2
BMC-EE-Tender Cell-87/2025-26 dt. 24.03.2026
Open Tender
Civil Works - Others
365 days
BMC AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹40,000
Yes
Office chamber of the EE,Central Tender Cell
26 May 2026
30 Mar 2026
16 Apr 2026
30 Mar 2026
15 Apr 2026
30 Mar 2026
30 Mar 2026 - 7 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Excavation of drain in both wet & dry condition, loading, unloading by mechanical means in all kinds of soil, including stoney earth, gravel and moorum etc and transportation by mechanical means and unicading the soil with all lifts and delifts Including trimming of slopes and bed to design section and depositing the excavated materials away from work site within initial inad of tkm from the place of excavation as per the specification and direction of the Engineer-in-charge | 5,152 | cum | 74.15 | ₹3,82,020.8 | |
Earthwork in slushy soil in water (upto 0.6m depth requring aid of pan and vessels) with one extra lead of 50m over the initial lead of 50m and extra lift of 1.50m over initial lift of 1.5m and to dispose off by transport vehicles with in initial lead of 5.00 km away from work site as per direction of Engineer-in-charge | 5,637 | cum | 477.84 | ₹26,93,584.08 | |
Supplying all materials labur & T & P with safety protective gears / Kit for cleaning of sewer line by mechanical means using Jetting machine mounted on TATA 710 LPT BS6 vehicle with tank capacity 4000 1tr (Jetting). The Jetting machine can operate through hydro jetting propulsion technic with high pressure of 150 bar/2200 PSI of jet spray of water through aerodynamic nozzle fitted on 3/4" ruber hose is inserted inside the sewer line for clearing of blockage & dragging the hose pipe for bringing the sludges to the machine hole etc complete in all respect as per site condition & direction of the Engineer in charge. The cost towards hire charges machine, operators, POL, Consumable materials, conveyance. cost of safety ptotective gears as per SOP & labour charges etc. (As Per Practical field Observations)charge. For 250mm & 300mm dia sewer line | - | Mtr | - | - | |
upto 200mm Dia sewer Line | - | Mtr | - | - | |
Bio Mining by mannual Labour from excavated or desilted soil from surfaces & upto .3 m depth | 570 | sqm | 10.73 | ₹6,116.1 | |
Conveyance of excavated soil/silt from stack in dry condition including loading and unloading the earth from the transport vehicles and transport carriage upto 1st 5 km including cost of loading and unloading | 189 | cum | 219.73 | ₹41,528.97 | |
Labour for lifting of RCC Precast Cover slab form drain and refixing them at its original Position after desilting work is over as per the direction of Engineer-in- Charge | 3,346 | Rtm | 75.42 | ₹2,52,355.32 | |
C:C: (1:2:4) using 12 mm. size H.G. stone chips including the cost of all materials labour T&P sundries etc complete | 20.91 | cum | 7,741 | ₹1,61,864.31 | |
Add for Photo Copy | 1 | cum | 3,000 | ₹3,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_586170.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
DTCN.pdf
Tender Documents • 0.96 MB
BOQ_586170.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid