Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-Finance CHITRAKALA ART STUDIO GALLERY DREAMLAND JAKHU ROAD SHIMLA 171001 H P | SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | L1 | Accepted-Finance Accept | |
| 2 | L2₹4.2 L+₹13,053 (3.22%)Accepted-Finance | L2 | Accepted-Finance Reject | |
| 3 | L3₹4.2 L+₹16,500 (4.07%)Accepted-Finance | L3 | Accepted-Finance Reject |
| Sl No | Description | Qty | Unit | ATTER SINGH L2 | DINESH KUMAR L1 | Ramesh Kumar Ranaik L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in earth work and disposal of all excavated earth upto all leads and lifts. Disposing earth to be levelled and neatly dressed pick jumper work within all leads and lifts and as directed by the Engineer-in-charge. | 17.66 | Cum. | 465 ₹8,212 Lowest | 465 ₹8,212 Lowest | 550 ₹9,713 |
| 2.00 | Providing & Laying cement concrete 1:6:12(1ccement :6 sand: 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth in all leads and lifts as per the directions of the Engineer in charge. | 1.32 | Cum. | 7,900 ₹10,428 | 7,850 ₹10,362 Lowest | 7,900 ₹10,428 |
| 3.00 | R/R masonary/polygone rubble masonry (uncoursed/brought to course) with hard stone of approved quality in foundation & plinth including levelling up with cement concrete 1:6:12 (1cement:6sand:12aggrigate 20mm nominal size)at plinth level in CM 1:6 (1cement:6sand) within all leads and lifts as per the directions of the Engineer in charge. (a) | 13.86 | Cum. | 8,000 ₹1,10,880 Lowest | 8,100 ₹1,12,266 | 8,300 ₹1,15,038 |
| 3.01 | (b) | 19.8 | Cum. | 4,200 ₹83,160 | 4,100 ₹81,180 Lowest | 4,100 ₹81,180 Lowest |
| 4.00 | Boulder/Stone filling behind retaing wall & crate wall within all leads and lifts and as directed by the Engineer-in-charge. | 8.58 | Cum. | 3,000 ₹25,740 | 2,600 ₹22,308 Lowest | 2,900 ₹24,882 |
| 5.00 | Providing andf laying cement concrete 1:5:10 (1 cement :5 sand : 10 graded stone aggregate 40 mm nominal size ) with 15% plum concrete and curing complete excluding cost of form work in retaining walls/breast walls,the size of plums shall usually be 150 mm to 300 mm as per H.P.P.W.D Specification. | 15.84 | Cum. | 7,500 ₹1,18,800 | 7,300 ₹1,15,632 Lowest | 7,800 ₹1,23,552 |
| 6.00Providing from work steel plates 3.15 mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish i/c centering, shuttering, strutting and propping etc. with wooded battens & ballies, height of propping and centring below supporting floor to ceilling not exceeding 4 meters and removal of the same for in situ reinforced concrete and plain concrete work with in all leads aand lifts as per the direction of the Engineer in Charge. | ||||||
| 6.01 | i) Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters, buttress, plinth and string couress and the like. | 13.2 | Sqm. | 550 ₹7,260 Lowest | 580 ₹7,656 | 550 ₹7,260 Lowest |
| 7.00 | Demolition of stone masonry above ground level upto floo two level including stacking of serviceable material and disposal of unserviceable material within 20 metres lead. Rubble masonry in cement mortar. | 20.63 | Cum. | 2,600 ₹53,638 | 2,300 ₹47,449 Lowest | 2,400 ₹49,512 |
Tender Value
₹3.7 L
EMD Value
₹7,439
Closing Date
2 Aug 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
JSV Division Nerwa
C O of R Wall in Front of Divisional Store etc Under CRF
2025_HPIPH_111074_1
No-JSV-ND-CB-Tender/2025 2710-60
Open Tender
Civil Works
Item Rate
90 days
e
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
EE Nerwa
₹7,439
14 Aug 2025
26 Jul 2025
2 Aug 2025
26 Jul 2025
2 Aug 2025
26 Jul 2025
Amount
Excavation in earth work and disposal of all excavated earth upto all leads and lifts. Disposing earth to be levelled and neatly dressed pick jumper work within all leads and lifts and as directed by the Engineer-in-charge.
Providing & Laying cement concrete 1:6:12(1ccement :6 sand: 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth in all leads and lifts as per the directions of the Engineer in charge.
R/R masonary/polygone rubble masonry (uncoursed/brought to course) with hard stone of approved quality in foundation & plinth including levelling up with cement concrete 1:6:12 (1cement:6sand:12aggrigate 20mm nominal size)at plinth level in CM 1:6 (1cement:6sand) within all leads and lifts as per the directions of the Engineer in charge. (a)
Boulder/Stone filling behind retaing wall & crate wall within all leads and lifts and as directed by the Engineer-in-charge.
Providing andf laying cement concrete 1:5:10 (1 cement :5 sand : 10 graded stone aggregate 40 mm nominal size ) with 15% plum concrete and curing complete excluding cost of form work in retaining walls/breast walls,the size of plums shall usually be 150 mm to 300 mm as per H.P.P.W.D Specification.
Providing from work steel plates 3.15 mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish i/c centering, shuttering, strutting and propping etc. with wooded battens & ballies, height of propping and centring below supporting floor to ceilling not exceeding 4 meters and removal of the same for in situ reinforced concrete and plain concrete work with in all leads aand lifts as per the direction of the Engineer in Charge.
i) Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters, buttress, plinth and string couress and the like.
Demolition of stone masonry above ground level upto floo two level including stacking of serviceable material and disposal of unserviceable material within 20 metres lead. Rubble masonry in cement mortar.
ATTER SINGH (BID ID -539747)
Ramesh Kumar Ranaik (BID ID -539694)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .